Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
9108 - Parkside Drive Sanitary Sewer Replacement
Cleaning, grubbing, replacement of sanitary sewer, installation of a gravel access path for maintenance equipment, pipe culvert removal, and restoration with topsoil, seed and matting.
10/05/2023 07:00 PM UTC
9336 - Felland Reservoir Booster Pump Install Milky Way Reservoir Valve Install
This project is located on the east side of Madison and will consist of installing a booster pump and associated piping in the existing control building at Felland Road reservoir.
09/21/2023 07:00 PM UTC
8710 - S. Owen Drive Assessment District - 2023
Replacement of sanitary sewer main and laterals, replacement of storm sewer structures and pipes, excavation, base preparation, asphalt pavement, curb and gutter, sidewalk, driveway aprons, terrace rain gardens, and pavement markings.
09/21/2023 07:00 PM UTC
9365 - Railroad Arch Culvert Repair at Southwest Bike Path
Reconstructing historic stone retaining wall located at 600 Glenway Street in Madison, WI. The Contractor or Contractor's subcontractor must be prequalifed in Historic Masonry prior to construction.
09/21/2023 07:00 PM UTC
8595 - Madison Public Market
This contract is for the selective demolition and construction of the future Madison Public Market site and facility located at 202 N First St, Madison WI. The work includes, but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
09/14/2023 07:00 PM UTC
9235 - Railroad Arch Culvert Repair at Southwest Bike Path
Reconstructing historic stone retaining wall located at 600 Glenway Street in Madison, WI. The Contractor or Contractor's subcontractor must be prequalifed in Historic Masonry prior to construction.
09/07/2023 07:00 PM UTC
9357 - IT Fiber Install - 2023 N. Charter to W. Washington Connection
Install new fiber optic through the combination of new and existing conduit between the existing splice points at the intersection of North Charter Street & Spring Street and an existing splice point outside 625 West Washington Ave. The project is approximately 3,500 feet in length.
09/07/2023 07:00 PM UTC
9322 - Fire Station 2 Lighting Retrofit
Replacement of all lighting fixtures and controls at Fire Station 2, located at 421 Grand Canyon Dr. in Madison, WI.
08/24/2023 07:00 PM UTC
9346 - 2023 Parking Garage Maintenance
Work covers repairs at seven City of Madison Parking Garages. Work includes, but is not limited to, concrete repair of slabs, columns, beams and stairs, joint repairs. See contract specifications for scope of work.
08/10/2023 07:00 PM UTC
9335 - CIPP UV Lining Rehabilitation of Sanitary Sewers Phase 2 - 2023
Work shall include the trenchless rehabilitation of approximately 15,649 linear feet of sanitary sewer pipelines ranging in size from 8” to 12” and approximately 345 linear feet of 24”storm sewer pipelines diameter using an Ultraviolet light cure CIPP system.
08/10/2023 07:00 PM UTC
171 - 180 of 1107 Solicitations