General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02112026.pdf (91 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02112026.pdf (92.3 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02112026.pdf (84.3 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02112026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
04/06/2023 07:00 PM UTC
9249 - Madison Senior Center Courtyard
Renovation of the courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials; the project also includes lighting and storm sewer.
03/09/2023 08:00 PM UTC
9285 - CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
Trenchless rehabilitation of approximately 12,653 linear feet of sanitary sewer piplelines ranging in size from 6" to 8" diameter using Ultraviolet light cure CIPP system. Prequalification in Category #399 UV Sewer Lining is required.
03/09/2023 08:00 PM UTC
9286 - CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
Trenchless rehabilitation of approximately 8,406 linear feet of sanitary sewer pipelines ranging in size from 8" to 18" diameter using Ultraviolet light cure CIPP system. Contractor performing work is required to be prequalified under Category #399, UV Sewer Lining.
03/09/2023 08:00 PM UTC
8875 - Lower Badger Mill Creek Flood Mitigation
Work includes, but is not limited to: Clearing & grubbing, channel excavation, pond excavation and dredging, maintenance path base course, installation of storm pipe and structures, installation of box culvert wingwalls and apron, bridge construction, and restoration.
03/09/2023 08:00 PM UTC
9299 - 2023 Semi-Permanent Epoxy Pavement Marking
Furnishing and application or removal of epoxy pavement markings at location throughout the City of Madison.
03/09/2023 08:00 PM UTC
8713 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 18) - 2023
Repair work primarily throughout the 18th Aldermanic District. Horizontally sawcut/grind sidewalk to eliminate trip hazards. Additional horizontal sawcutting/grinding may be required within the project limits of City of Madison Reconstruction Projects and may be city wide as part of the Sidewalk Request Program.
03/09/2023 08:00 PM UTC
8727 - Bridge Repairs 2022/2023 - Painting Alicia Ashman Pedestrian Bridge
Repainting the Alicia Ashman pedestrian bridge over Campus Drive and Wisconsin and Southern Railroad. Preparation and repainting of all exposed surfaces of carbon steel items on the bridge and approach ramps. See Section 104 of the Contract for Scope of Work.
03/09/2023 08:00 PM UTC
8705 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 12) by the Common Council
Repair work primarily throughout Aldermanic District 12. Replace defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by City of Madison) and associated work. Install new sidewalk and concrete bus pads at locations designated by the Common Council, as directed by the Engineer.
03/09/2023 08:00 PM UTC
8701 - Chip Sealing 2023 - North
8701 - Chip Sealing 2023 - North
03/09/2023 08:00 PM UTC
171 - 180 of 1072 Solicitations
1 2 14 15 16 18 20 21 22 107 108