| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9613PlanHolders02272026.pdf (88.6 KB) |
Contract 9613 - CIPP UV Lining Rehabilitation
| |
| 9712PlanHolders02272026.pdf (86.1 KB) |
Contract 9712 - Yahara Hills Golf Course Well Pipe
| |
| 9726PlanHolders02272026.pdf (95.1 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9740PlanHolders02272026.pdf (90.9 KB) |
Contract 9740 - Unit Well 12 Upgrade
| |
| Number | Deadline |
|---|---|
|
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
| 03/12/2026 07:00 PM UTC |
|
9712 - Yahara Hills Golf Course Well Transfer Pipe
The objective of these specifications is to reroute the existing irrigation well to irrigation pond #3. Routing of the pipe shall avoid existing golf irrigation system. This project consists of irrigation mainline installation, irrigation shut off valve installation, and site restoration.
| 03/12/2026 07:00 PM UTC |
|
9730 - Manitou Way Storm Box Replacement
The work under this contract shall include, but not be limited to, replacement of a portion of the storm sewer box culvert main and endwall, excavation, terrace restoration, and removal and rebuilding of a historical stone wall.
| 03/12/2026 07:00 PM UTC |
|
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
| 04/02/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
8300 - W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
| 04/20/2023 07:00 PM UTC |
|
9312 - Truax Lift Station Replacement
Truax Lift Station Replacement
| 04/20/2023 07:00 PM UTC |
|
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
| 04/06/2023 07:00 PM UTC |
|
9240 - Fire Station 4 Lighting Retrofit
Fire Station 4 Lighting Retrofit
| 04/06/2023 07:00 PM UTC |
|
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
| 04/06/2023 07:00 PM UTC |
|
9249 - Madison Senior Center Courtyard
Renovation of the courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials; the project also includes lighting and storm sewer.
| 03/09/2023 08:00 PM UTC |
|
9285 - CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
Trenchless rehabilitation of approximately 12,653 linear feet of sanitary sewer piplelines ranging in size from 6" to 8" diameter using Ultraviolet light cure CIPP system.
Prequalification in Category #399 UV Sewer Lining is required.
| 03/09/2023 08:00 PM UTC |
|
9286 - CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
Trenchless rehabilitation of approximately 8,406 linear feet of sanitary sewer pipelines ranging in size from 8" to 18" diameter using Ultraviolet light cure CIPP system.
Contractor performing work is required to be prequalified under Category #399, UV Sewer Lining.
| 03/09/2023 08:00 PM UTC |
|
8875 - Lower Badger Mill Creek Flood Mitigation
Work includes, but is not limited to: Clearing & grubbing, channel excavation, pond excavation and dredging, maintenance path base course, installation of storm pipe and structures, installation of box culvert wingwalls and apron, bridge construction, and restoration.
| 03/09/2023 08:00 PM UTC |
|
9299 - 2023 Semi-Permanent Epoxy Pavement Marking
Furnishing and application or removal of epoxy pavement markings at location throughout the City of Madison.
| 03/09/2023 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.