General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8801PlanHolders09052025.pdf (86.7 KB)
Contract 8801 - Troy Drive Green Ave
9674PlanHolders09052025.pdf (89.4 KB)
Contract 9674 - 346 E. Lakeside Demolition
9679PlanHolders09052025.pdf (87.7 KB)
Contract 9679 - Olin Park Bridge Replacement
9681PlanHolders09052025.pdf (88.6 KB)
Contract 9681 - Dairy Drive Campground
9687PlanHolders09052025.pdf (86 KB)
Contract 9687 - Country Grove Singletrack Trail
6 Documents

Upcoming Solicitations

Number Deadline
9674 - 346 E. Lakeside Demolition
This project includes the demolition of the house at 346 E. Lakeside Street and the restoration of the site to turf and a gravel path. The house is located on Lake Monona between another residential property and existing park property. Major features to be removed include: the house, garage, deck, fence lines, concrete path, asphalt drive, and existing vegetation.
09/18/2025 07:00 PM UTC
9687 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
09/18/2025 07:00 PM UTC
9679 - Olin Park Pedestrian Bridge Replacement
This project consists of the replacement of a pedestrian bridge at Olin Park in Madison, WI including but not limited to the following: • Removal of existing bridge • Bridge fabrication, delivery and installation of new bridge on existing abutments
09/18/2025 07:00 PM UTC
8801 - Troy Drive Green Avenue Sanitary Sewer with Resurfacing Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, installation sanitary sewer main and laterals, adjustment of water valves, and storm inlets, pulverize and shape the existing asphalt pavement, full width grinding of the existing pavement, bus pad installation, and spot replacement of curb and gutter and sidewalks, and new pavement marking.
09/18/2025 07:00 PM UTC
9681-Dairy Drive Campground Demo and Site Restoration
This contract is for the demolition of structures, site features and asphalt and/or concrete paving located 3202 Dairy Dr.
09/25/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8706 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 18) By the Common Council
Perform repair work primarily throughout Aldermanic District 18. This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
02/23/2023 08:00 PM UTC
9280 - Fire Station 10 Lighting Retrofit
Fire Station 10 is located at 1517 Troy Drive in Madison, WI. This bid shall include the complete installation of all building components; the accepted testing, and commissioning of all systems; and the completion, and turn-in of all deliverables as outlined in the plans and specifications.
02/09/2023 08:00 PM UTC
9269 - 2023 Sport Court Resurfacings
2023 Sport Court Resurfacings
02/09/2023 08:00 PM UTC
8583 - Halo Lane and Twilight Trail Resurfacing Assessment District - 2023
The work shall include, but is not limited to, replacing sanitary sewer, replacing and/or improving storm sewer, removing and replacing concrete curb and gutter, sidewalk and drive aprons, excavation cut, crushed aggregate base course, and asphalt pavement as noted in specifications and plans.
02/09/2023 08:00 PM UTC
8641 - Braxton Place and La Mariposa Lane Assessment District - 2022
The new street construction project limits on La Mariposa Lane are between West Washington Avenue and Braxton Place. The project is approximately 450 ft. in length. The new shared-use path construction project limits are between Braxton Place and Regent Street. The project is approximately 360 ft. in length.
01/26/2023 08:00 PM UTC
9243 - 2023 Semi-Permanent Epoxy Pavement Marking
2023 Semi-Permanent Epoxy Pavement Marking
01/26/2023 08:00 PM UTC
9437 - East Towne Detention Basin Improvements
9437 - East Towne Detention Basin Improvements
01/26/2023 08:00 PM UTC
8692 - Felland Road Reconstruction Assessment District - 2022
8692 - Felland Road Reconstruction Assessment District - 2022
01/26/2023 08:00 PM UTC
9262 - CIPP Wet Lining Rehab of Sanitary Sewers - 2021 (Rebid)
CIPP Wet Lining Rehab of Sanitary Sewers - 2021 (Rebid)
12/22/2022 08:00 PM UTC
8716 - East-West Bus Rapid Transit
8716 - East-West Bus Rapid Transit
12/15/2022 08:00 PM UTC
181 - 190 of 1062 Solicitations
1 2 15 16 17 19 21 22 23 106 107