City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9593PlanHolders04012026.pdf (90 KB) |
Contract 9593 - Pressure Zone 4 Crossing
| |
| 9694PlanHolders04012026.pdf (90.3 KB) |
Contract 9694 - Warner & Worthington Park Courts
| |
| 9726PlanHolders04012026.pdf (97.4 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9740PlanHolders04012026.pdf (96.7 KB) |
Contract 9740 - Unit Well 12 Upgrade
| |
| 9751PlanHolders04012026.pdf (86.4 KB) |
Contract 9751 - 2026 Parking Garage Maintenance
| |
| 9757PlanHolders04012026.pdf (88.3 KB) |
Contract 9757 - Imagination Center Fiber
| |
| 9766PlanHolders04012026.pdf (88.9 KB) |
Contract 9766 - Metro Transit Kennedy Bus Charger
| |
| Number | Deadline |
|---|---|
|
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
| 04/02/2026 07:00 PM UTC |
|
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
| 04/02/2026 07:00 PM UTC |
|
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex.
The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
| 04/02/2026 07:00 PM UTC |
|
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
| 04/02/2026 07:00 PM UTC |
|
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
| 04/02/2026 07:00 PM UTC |
|
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 04/23/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
| 04/06/2023 07:00 PM UTC |
|
9249 - Madison Senior Center Courtyard
Renovation of the courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials; the project also includes lighting and storm sewer.
| 03/09/2023 08:00 PM UTC |
|
9285 - CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
Trenchless rehabilitation of approximately 12,653 linear feet of sanitary sewer piplelines ranging in size from 6" to 8" diameter using Ultraviolet light cure CIPP system.
Prequalification in Category #399 UV Sewer Lining is required.
| 03/09/2023 08:00 PM UTC |
|
9286 - CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
Trenchless rehabilitation of approximately 8,406 linear feet of sanitary sewer pipelines ranging in size from 8" to 18" diameter using Ultraviolet light cure CIPP system.
Contractor performing work is required to be prequalified under Category #399, UV Sewer Lining.
| 03/09/2023 08:00 PM UTC |
|
8875 - Lower Badger Mill Creek Flood Mitigation
Work includes, but is not limited to: Clearing & grubbing, channel excavation, pond excavation and dredging, maintenance path base course, installation of storm pipe and structures, installation of box culvert wingwalls and apron, bridge construction, and restoration.
| 03/09/2023 08:00 PM UTC |
|
9299 - 2023 Semi-Permanent Epoxy Pavement Marking
Furnishing and application or removal of epoxy pavement markings at location throughout the City of Madison.
| 03/09/2023 08:00 PM UTC |
|
8713 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 18) - 2023
Repair work primarily throughout the 18th Aldermanic District. Horizontally sawcut/grind sidewalk to eliminate trip hazards. Additional horizontal sawcutting/grinding may be required within the project limits of City of Madison Reconstruction Projects and may be city wide as part of the Sidewalk Request Program.
| 03/09/2023 08:00 PM UTC |
|
8727 - Bridge Repairs 2022/2023 - Painting Alicia Ashman Pedestrian Bridge
Repainting the Alicia Ashman pedestrian bridge over Campus Drive and Wisconsin and Southern Railroad. Preparation and repainting of all exposed surfaces of carbon steel items on the bridge and approach ramps. See Section 104 of the Contract for Scope of Work.
| 03/09/2023 08:00 PM UTC |
|
8705 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 12) by the Common Council
Repair work primarily throughout Aldermanic District 12. Replace defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by City of Madison) and associated work. Install new sidewalk and concrete bus pads at locations designated by the Common Council, as directed by the Engineer.
| 03/09/2023 08:00 PM UTC |
|
8701 - Chip Sealing 2023 - North
8701 - Chip Sealing 2023 - North
| 03/09/2023 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.