General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
8587 - Tenney Park Beach Shelter
8587 - Tenney Park Beach Shelter
07/13/2023 07:00 PM UTC
8876 - Wexford Pond Dredging
This project is located on the parcel at 1005 N. High Point Rd., Madison, WI.
07/13/2023 07:00 PM UTC
8659 - Hudson Ave., Miller Ave., Willard Ave., Center Ave., and Sommers Ave. Assessment District - 2023
Work shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, and replacement of storm sewer main and storm sewer structures, excavation, base preparation. curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
07/13/2023 07:00 PM UTC
9333 - Robin Greenway Storm and Grading
9333 - Robin Greenway Storm and Grading
07/13/2023 07:00 PM UTC
9297 - Goodman Library Lighting Upgrade
Complete installation of all building components; the accepted testing, and commissioning of all systems; and the completion, and turn-in of all deliverables as outlined in the plans and specifications.
07/06/2023 07:00 PM UTC
9326 - Door Creek Park Shelter
Door Creek Park Shelter
06/22/2023 07:00 PM UTC
8728 - IT Fiber Install 2023
8728 - IT Fiber Install 2023
06/22/2023 07:00 PM UTC
9327 - 2023 Penn Park Courts
2023 Penn Park Courts
06/08/2023 07:00 PM UTC
8732 - Repairing and Sealing Pavement Cracks - Major Streets 2023
Repairing and Sealing Pavement Cracks - Major Streets 2023
06/08/2023 07:00 PM UTC
8731 - Repairing and Sealing Pavement Cracks - Local Streets 2023
Repairing and Sealing Pavement Cracks - Local Streets 2023
06/08/2023 07:00 PM UTC
181 - 190 of 1107 Solicitations
1 2 15 16 17 19 21 22 23 110 111