General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED**** This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
04/02/2026 07:01 PM UTC
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
04/07/2026 07:01 PM UTC
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
04/14/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
04/16/2026 07:01 PM UTC
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
CP965420-Jack Trice Stadium-Press Box Elevator-Improvements
This project includes, but is not limited to, modernizing the elevator controller, hoisting equipment, and door operations.
02/22/2024 08:01 PM UTC
CP1197515-Farm House-Roof Replacement
This project includes, but is not limited to, the replacement of the existing cedar shake shingles and ridge vent, painting the wood soffits and fascia, new gutters, flashing at the chimney, wood trim replacement at the dormer, and restoring wood trim and accent railings and both the North, West, and South porches, all in compliance with historical preservation practices and methods. Work will include lead abatement and architectural work.
02/08/2024 08:01 PM UTC
CP1000679-Friley Residence Hall-Courtyard Roof-Improvements
The Friley Residence Hall courtyard is both an outdoor seating area and a structural roof over food service and dining areas below the courtyard. The courtyard consists of a concrete deck, which is now deteriorated. This project includes, but is not limited to, repairs to the deck and installing a new protective waterproof membrane. A new pedestal-mounted paver system will be installed over the membrane to provide a courtyard walking surface.
02/06/2024 08:01 PM UTC
CP1123016-Oak-Elm Residence Hall-First Floor Elm-Remodel
This project includes, but is not limited, to the remodeling of existing bathrooms and an adjacent, vacant, resident assistant suite into an enlarged shared resident bathroom and a single-stall public bathroom. Also included is the redesign of an exterior entrance vestibule to create hallway space to provide integration of student housing areas. Two vacant resident rooms and corridors will also be remodeled to match standard modern dorm room finishes. Mechanical, ventilation, electrical, and plumbing upgrades will be made to accommodate all remodeled spaces.
01/25/2024 08:01 PM UTC
CP1010421-Patterson Hall-Roof Replacement-Sections C, D, G, X, and W
This project includes, but is not limited to, the replacement of the existing roof systems at roof sections C, D, G, X, and W. All existing ballast, membranes, flashings, fiberboards, and insulation will be removed and replaced with a new, fully adhered, EPDM roof system with new insulation below. The new roof system is designed to have a minimum useful life expectancy of 30 years. New walk pads and appropriate safety equipment will also be included to meet university standards. The existing termination bar sealant at the perimeter of roof section D as well as the asphalt layer beneath roof sections X and W contain asbestos and will be properly abated.
01/04/2024 08:01 PM UTC
CP002649-Black Engineering-Emergency Power Transfer Switch-Replacement
This project will install one or more new emergency and standby power transfer switches, associated cabling, and new electrical distribution equipment to replace the existing transfer switch and existing electrical distribution equipment in their current location in the basement main electrical room of Black Engineering.
12/21/2023 08:01 PM UTC
CP1010421-Patterson Hall-Roof Replacement-Sections C, D, G, X, and W
This project includes, but is not limited to, the replacement of the existing roof systems at roof sections C, D, G, X, and W. All existing ballast, membranes, flashings, fiberboards, and insulation will be removed and replaced with a new, fully adhered, EPDM roof system with new insulation below. The new roof system is designed to have a minimum useful life expectancy of 30 years. New walk pads and appropriate safety equipment will also be included to meet university standards. The existing termination bar sealant at the perimeter of roof section D as well as the asphalt layer beneath roof sections X and W contain asbestos and will be properly abated.
12/21/2023 08:01 AM UTC
CP1118937-MacKay Hall-Roof Replacement-Section F and Parapet Wall Repair
This project will replace roof Section F and repair the parapet wall at MacKay Hall. This section of the roof is a built-up roof (BUR) and is over 25 years old with a history of leaks. This project includes, but is not limited to: • Replacement of the roof with a system designed for a minimum life expectancy of 30 years • Roof insulation to meet current energy codes • Roof safety improvements as needed to meet current university standards • Repair, tuckpointing, or caulking of all features, roof curbs, and parapet walls above the roofline to prevent water infiltration through these critical connections • Addition of a roof access door
12/19/2023 08:01 PM UTC
CP1146627-Agronomy Hall-Room 2050-Remodel
This project includes, but is not limited to, remodeling of flooring, lighting, walls, ceilings, and furniture in the existing classroom. Also included are new diffusers, ductwork, and technology upgrades.
12/14/2023 08:01 PM UTC
CP1004288-CYTown-Parking and Infrastructure-Phase 2
This project includes, but is not limited to, construction of replacement parking with new lighting and installation of underground infrastructure, which would include new water, power, gas, telecommunications, storm sewer, and sanitary lines to support future development. The project would also relocate the CyRide Transit Hub and raise a portion of the site above 100-year flood plain of Ioway Creek.
12/14/2023 08:01 PM UTC
91 - 100 of 395 Solicitations