General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
3219 Hudson Road Roof Replacement
Installation of new fluid applied roof membrane over an existing metal roof. Project includes preparation necessary before installation of coating.
07/31/2018 07:00 PM UTC
West Campus Recreation Field Enhancements
Construction of new recreation fields located east of the gravel road, PE Center Drive. New fields will be developed utilizing a balance site cut and fill approach. Site drainage, pedestrian access, irrigation of limited areas, and some fencing will be addressed. Additionally an existing metal storage building will be relocated.
06/28/2018 07:00 PM UTC
Kamerick Art Building Reroofing
Remove existing rock ballast and EPDM membrane, remove and/or reuse existing insulation, mechanically attach new insulation, adhere new coverboard and install new fully adhered EPDM membrane.
06/12/2018 07:00 PM UTC
Institutional Roads 2018
Reconstruction of Dakota Street (East of Missouri Street) and reconstruction of Missouri Street ( Campus Street to Gilchrist Drive).
04/12/2018 07:00 PM UTC
Steam Tunnel T-4 Pipe Anchor Repair
Replace the existing steam and condensate pipe anchors and repair portions of the Tunnel T-4 wall.
03/29/2018 07:00 PM UTC
Schindler Education Center Renovation - East Plaza
Demolition and reconstruction of an existing pedestrian plaza/walkway to the east of Schindler Education Center.
03/27/2018 07:00 PM UTC
Hillside Courts Demolition
The complete demolition and deconstruction of 26 building structures and related building components.
03/22/2018 07:00 PM UTC
Parking Lot Reconstruction 2018
Reconstruct portions of the ROTH C parking lot with new concrete pavement and rehabilitate portions of the Hagemann CP parking lot by milling existing asphalt pavement followed by a new hot mixed asphalt pavement overlay.
03/22/2018 07:00 PM UTC
McCollum Science Hall 112 Renovation
Renovation of existing Room 112, a laboratory classroom space, in McCollum Science Hall.
03/20/2018 07:00 PM UTC
Hillside Courts Demolition - Asbestos & Hazardous Materials Mitigation
Providing all asbestos and hazardous materials abatement services relating to the Hillside Courts Demolition.
03/20/2018 07:00 PM UTC
121 - 130 of 138 Solicitations
1 2 6 7 8 9 10 11 13