General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Institutional Roads 2019
Reconstruction of Panther Parkway ( W. 31st Street to W. 27th Street) - Phase 1 and reconstruction of West 27th Street (East of Minnesota Street). Scope of work will include existing pavement removals, earth work, subsurface drainage, storm sewer and intake construction, new PC Concrete pavement and sidewalks and turf reconstruction.
04/09/2019 07:00 PM UTC
Towers Center Moisture Repairs
The work includes replacement of gypsum board wall surfaces, new carpet tile, new cabinetry, resurfacing of existing laminate cabinetry/tables, minor floor tile work, painting, and suspended acoustic tile ceiling.
04/04/2019 07:00 PM UTC
Noehren Roof (SE Wings) and Noehren and Shull Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation, adhere/mechanically attach new insulation, adhere new coverboard and install new fully adhered TPA membrane.
03/28/2019 07:00 PM UTC
Steam Distribution System Replacement Phase 2A - Campbell Hall to Towers Center
Replace approximately 900 feet of existing direct buried steam and condensate piping from Campbell Hall to Towers Center with new pre-engineered direct buried steam and condensate piping. All pre-insulated piping is OWNER-furnished.
03/12/2019 07:00 PM UTC
Noehren Hall Student Room Remodel - Phase 1
Remodeling of student rooms located on floors 1 through 4 of Noehren Hall. Replacement of millwork, flooring and painting as well as plumbing, power, lighting, fire alarm, data & wifi work. Corridor and lounge upgrades.
10/30/2018 07:00 PM UTC
3219 Hudson Road Roof Replacement
Installation of new fluid applied roof membrane over an existing metal roof. Project includes preparation necessary before installation of coating.
07/31/2018 07:00 PM UTC
West Campus Recreation Field Enhancements
Construction of new recreation fields located east of the gravel road, PE Center Drive. New fields will be developed utilizing a balance site cut and fill approach. Site drainage, pedestrian access, irrigation of limited areas, and some fencing will be addressed. Additionally an existing metal storage building will be relocated.
06/28/2018 07:00 PM UTC
Kamerick Art Building Reroofing
Remove existing rock ballast and EPDM membrane, remove and/or reuse existing insulation, mechanically attach new insulation, adhere new coverboard and install new fully adhered EPDM membrane.
06/12/2018 07:00 PM UTC
Institutional Roads 2018
Reconstruction of Dakota Street (East of Missouri Street) and reconstruction of Missouri Street ( Campus Street to Gilchrist Drive).
04/12/2018 07:00 PM UTC
Steam Tunnel T-4 Pipe Anchor Repair
Replace the existing steam and condensate pipe anchors and repair portions of the Tunnel T-4 wall.
03/29/2018 07:00 PM UTC
121 - 130 of 143 Solicitations
1 2 7 8 9 10 11 13 15