University of Northern Iowa
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
| 05/06/2025 07:00 PM UTC |
Number | Deadline |
---|---|
3219 Hudson Road Roof Replacement
Installation of new fluid applied roof membrane over an existing metal roof. Project includes preparation necessary before installation of coating.
| 07/31/2018 07:00 PM UTC |
West Campus Recreation Field Enhancements
Construction of new recreation fields located east of the gravel road, PE Center Drive. New fields will be developed utilizing a balance site cut and fill approach. Site drainage, pedestrian access, irrigation of limited areas, and some fencing will be addressed. Additionally an existing metal storage building will be relocated.
| 06/28/2018 07:00 PM UTC |
Kamerick Art Building Reroofing
Remove existing rock ballast and EPDM membrane, remove and/or reuse existing insulation, mechanically attach new insulation, adhere new coverboard and install new fully adhered EPDM membrane.
| 06/12/2018 07:00 PM UTC |
Institutional Roads 2018
Reconstruction of Dakota Street (East of Missouri Street) and reconstruction of Missouri Street ( Campus Street to Gilchrist Drive).
| 04/12/2018 07:00 PM UTC |
Steam Tunnel T-4 Pipe Anchor Repair
Replace the existing steam and condensate pipe anchors and repair portions of the Tunnel T-4 wall.
| 03/29/2018 07:00 PM UTC |
Schindler Education Center Renovation - East Plaza
Demolition and reconstruction of an existing pedestrian plaza/walkway to the east of Schindler Education Center.
| 03/27/2018 07:00 PM UTC |
Hillside Courts Demolition
The complete demolition and deconstruction of 26 building structures and related building components.
| 03/22/2018 07:00 PM UTC |
Parking Lot Reconstruction 2018
Reconstruct portions of the ROTH C parking lot with new concrete pavement and rehabilitate portions of the Hagemann CP parking lot by milling existing asphalt pavement followed by a new hot mixed asphalt pavement overlay.
| 03/22/2018 07:00 PM UTC |
McCollum Science Hall 112 Renovation
Renovation of existing Room 112, a laboratory classroom space, in McCollum Science Hall.
| 03/20/2018 07:00 PM UTC |
Hillside Courts Demolition - Asbestos & Hazardous Materials Mitigation
Providing all asbestos and hazardous materials abatement services relating to the Hillside Courts Demolition.
| 03/20/2018 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.