General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Maucker Union Roof Monitors
Removal of four (4) existing skylights on the four (4) roof monitors location on the Maucker Union.
11/17/2020 08:00 PM UTC
UNI-Dome Football Team Room
Construction of a 120 seat football team room and support spaces in the northeast corner of the UNI-Dome
11/10/2020 08:00 PM UTC
Towers Center Loading Dock Repairs
Repair of grade beam and replacement of floor slab over mechanical room at loading dock area of Towers Center.
03/31/2020 07:00 PM UTC
UNI-Dome Fabric Roof Repairs
Installing several new fall arrest protection systems for select areas of the roof as well as repairing discrete areas of distress at the PYFE membrane skylight.
03/19/2020 07:00 PM UTC
Institutional Roads 2020
Reconstruction of Panther Parkway (W. 31st Street to W. 27th Street) - Phase 2. The 2020 project also includes pavement maintenance of Institutional Roads at several campus locations.
03/12/2020 07:00 PM UTC
Redeker Center North Plaza
A pedestrian plaza improvement project including but not limited to the demolition of existing paving, placement of new paving, ADA ramps with handrails, removal and relocation of pedestrian area lighting, planting beds, overstory & ornamental trees and storm and water service improvements.
03/05/2020 08:00 PM UTC
Steam Distribution System Replacement Phase 2B - West Campus
Construction of approx. 920 ft. of cast-in-place utility tunnel with new steam & condensate piping & supporting electrical & misc. services. Replacement of piping expansion joints & related modifications within the UNI-Dome. Installation of approx. 780 ft. of direct-buried , pre-insulated, Owner furnished steam & condensate piping.
02/20/2020 08:00 PM UTC
Power Plant Cooling Tower Replacement
Replace existing field-erected cooling tower. Will also upgrade associated auxiliary systems, including condenser water pumping, electrical service, and the process control system.
02/11/2020 08:00 PM UTC
McCollum Science Hall Exterior South Deck Railing Repairs
Demolition of the existing concrete railing and plaza level concrete topping slab along with removal of the existing egress stair. A new waterproofing membrane and concrete topping slab. A new guardrail assembly and egress stair.
01/28/2020 08:00 PM UTC
Hagemann Hall and Hagemann & Rider Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation (except for Roof Area 4), adhere/mechanically attach new insulation, adhere new coverboard and install new fully adhered Fleecebacked TPA membrane.
01/28/2020 08:00 PM UTC
91 - 100 of 138 Solicitations
1 2 6 7 8 10 12 13 14