University of Northern Iowa
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
| 05/06/2025 07:00 PM UTC |
Number | Deadline |
---|---|
Maucker Union Roof Monitors
Removal of four (4) existing skylights on the four (4) roof monitors location on the Maucker Union.
| 11/17/2020 08:00 PM UTC |
UNI-Dome Football Team Room
Construction of a 120 seat football team room and support spaces in the northeast corner of the UNI-Dome
| 11/10/2020 08:00 PM UTC |
Towers Center Loading Dock Repairs
Repair of grade beam and replacement of floor slab over mechanical room at loading dock area of Towers Center.
| 03/31/2020 07:00 PM UTC |
UNI-Dome Fabric Roof Repairs
Installing several new fall arrest protection systems for select areas of the roof as well as repairing discrete areas of distress at the PYFE membrane skylight.
| 03/19/2020 07:00 PM UTC |
Institutional Roads 2020
Reconstruction of Panther Parkway (W. 31st Street to W. 27th Street) - Phase 2. The 2020 project also includes pavement maintenance of Institutional Roads at several campus locations.
| 03/12/2020 07:00 PM UTC |
Redeker Center North Plaza
A pedestrian plaza improvement project including but not limited to the demolition of existing paving, placement of new paving, ADA ramps with handrails, removal and relocation of pedestrian area lighting, planting beds, overstory & ornamental trees and storm and water service improvements.
| 03/05/2020 08:00 PM UTC |
Steam Distribution System Replacement Phase 2B - West Campus
Construction of approx. 920 ft. of cast-in-place utility tunnel with new steam & condensate piping & supporting electrical & misc. services. Replacement of piping expansion joints & related modifications within the UNI-Dome. Installation of approx. 780 ft. of direct-buried , pre-insulated, Owner furnished steam & condensate piping.
| 02/20/2020 08:00 PM UTC |
Power Plant Cooling Tower Replacement
Replace existing field-erected cooling tower. Will also upgrade associated auxiliary systems, including condenser water pumping, electrical service, and the process control system.
| 02/11/2020 08:00 PM UTC |
McCollum Science Hall Exterior South Deck Railing Repairs
Demolition of the existing concrete railing and plaza level concrete topping slab along with removal of the existing egress stair. A new waterproofing membrane and concrete topping slab. A new guardrail assembly and egress stair.
| 01/28/2020 08:00 PM UTC |
Hagemann Hall and Hagemann & Rider Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation (except for Roof Area 4), adhere/mechanically attach new insulation, adhere new coverboard and install new fully adhered Fleecebacked TPA membrane.
| 01/28/2020 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.