Student Health Center Updates Rooms 005, 016, & 103A
Renovation of the ground floor reception area and Room 005. Enclose Room 103A.
| 03/11/2021 08:00 PM UTC |
Power Plant Roof Replacements
Replace roofs 3, 4, and 6 on the Power Plant building. Include addition of Roof Safety items. Bid alternates will include roofs 8 and 10.
| 02/11/2021 08:00 PM UTC |
Power Plant Boiler #3 Electrical Infrastructure
Removal of the existing motor control centers panels, transformers and equipment feeders and their replacement with new distribution equipment, feeders and wiring. Removal and replacement of existing main Boiler #3 switchgear, its feeders, and its branch feeders.
| 01/21/2021 08:00 PM UTC |
Power Plant Cooling Tower Condenser Piping Replacement
Replacing aging 24-inch cooling tower condenser water supply & return piping headers from the cooling towers to the steam turbine surface condenser.
| 12/22/2020 08:00 PM UTC |
Steam Distribution System Replacement Phase 2C - South Campus and Tunnel T5 Vault Repairs
Installation of direct-buried, pre-insulated, steam and condensate piping. Additionally, work includes the construction of two(2) new utility vaults.
| 12/17/2020 08:00 PM UTC |
Maucker Union Roof Monitors
Removal of four (4) existing skylights on the four (4) roof monitors location on the Maucker Union.
| 11/17/2020 08:00 PM UTC |
UNI-Dome Football Team Room
Construction of a 120 seat football team room and support spaces in the northeast corner of the UNI-Dome
| 11/10/2020 08:00 PM UTC |
Towers Center Loading Dock Repairs
Repair of grade beam and replacement of floor slab over mechanical room at loading dock area of Towers Center.
| 03/31/2020 07:00 PM UTC |
UNI-Dome Fabric Roof Repairs
Installing several new fall arrest protection systems for select areas of the roof as well as repairing discrete areas of distress at the PYFE membrane skylight.
| 03/19/2020 07:00 PM UTC |
Institutional Roads 2020
Reconstruction of Panther Parkway (W. 31st Street to W. 27th Street) - Phase 2. The 2020 project also includes pavement maintenance of Institutional Roads at several campus locations.
| 03/12/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.