General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Dancer Hall Restroom and Corridor Improvements
Interior renovation of an existing thirteen story tower providing ADA compliant restrooms, and new finishes and lighting within restrooms, corridors and lounges.
01/07/2020 08:00 PM UTC
East Bartlett Rooms 105-140 Office and Restroom Renovation
Renovation of a portion of the 1st Floor of East Bartlett. The renovation includes remodel of two restrooms and modifications to several walls to reconfigure office space.
12/19/2019 08:00 PM UTC
Power Plant Turbine Oil Fire Protection System
Install a foam fire protection system and associated containment for the steam turbine generator oil lubrication system area located underneath the steam turbine generator.
12/17/2019 08:00 PM UTC
Curris Business Building Gas Suppression Fire System For Rooms 019 & 021
The provision of a clean agent (Novec 1230) fire suppression system within Rooms 019 and 021 at the Curris Business Building.
11/21/2019 08:00 PM UTC
Noehren Hall Student Room Remodel - Phase 2
A facelift to all of the student rooms located on Floors 1 through 5 of the south, east and center two wings of Noehren Hall. Also included is the east end of the ground floor as well as the main floor lounge and office support spaces.
09/24/2019 07:00 PM UTC
McLeod Center Loading Dock Canopy Repairs
Removal & replacement of the existing loading dock gypsum board canopy & supporting framing. Replace with new framing and 1" metal flush panel. Remove existing architectural composite metal panel fascia, waterproof the fascia and reinstall the existing panels; supplementing missing panels with new materials.
08/08/2019 07:00 PM UTC
Facilities Management North Parking Lot Reconstruction
Reconstruction of the Facilities Management North Parking Lot located at West 30th Street. Work includes removal and replacement of the existing parking lot pavement and installation of new Hot Mix Asphalt pavement, storm sewer piping and intakes, minor electrical conduit and junction box, and parking lot markings.
06/25/2019 07:00 PM UTC
Curris Business Building Replace Hall Lighting Updates
Removal of existing lighting fixtures and replacing them with new LED lighting, and the removal of existing acoustical ceiling tiles and replacing them with new acoustical ceiling tiles.
06/13/2019 07:00 PM UTC
Nielsen Field House Upgrades
Upgrades and renovations to the Nielsen Field House to support the efforts of the Military Science and the Child Development Center programs.
06/13/2019 07:00 PM UTC
Center for Energy and Environmental Education Window Replacement Phase 5
Replace existing clad wood windows with new fiberglass windows and replace existing flashing, metal trim, and wood trim with new.
06/11/2019 07:00 PM UTC
101 - 110 of 138 Solicitations
1 2 6 7 8 9 11 13 14