University of Northern Iowa
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Redeker Center North Plaza
A pedestrian plaza improvement project including but not limited to the demolition of existing paving, placement of new paving, ADA ramps with handrails, removal and relocation of pedestrian area lighting, planting beds, overstory & ornamental trees and storm and water service improvements.
| 03/05/2020 08:00 PM UTC |
Steam Distribution System Replacement Phase 2B - West Campus
Construction of approx. 920 ft. of cast-in-place utility tunnel with new steam & condensate piping & supporting electrical & misc. services. Replacement of piping expansion joints & related modifications within the UNI-Dome. Installation of approx. 780 ft. of direct-buried , pre-insulated, Owner furnished steam & condensate piping.
| 02/20/2020 08:00 PM UTC |
Power Plant Cooling Tower Replacement
Replace existing field-erected cooling tower. Will also upgrade associated auxiliary systems, including condenser water pumping, electrical service, and the process control system.
| 02/11/2020 08:00 PM UTC |
McCollum Science Hall Exterior South Deck Railing Repairs
Demolition of the existing concrete railing and plaza level concrete topping slab along with removal of the existing egress stair. A new waterproofing membrane and concrete topping slab. A new guardrail assembly and egress stair.
| 01/28/2020 08:00 PM UTC |
Hagemann Hall and Hagemann & Rider Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation (except for Roof Area 4), adhere/mechanically attach new insulation, adhere new coverboard and install new fully adhered Fleecebacked TPA membrane.
| 01/28/2020 08:00 PM UTC |
Dancer Hall Restroom and Corridor Improvements
Interior renovation of an existing thirteen story tower providing ADA compliant restrooms, and new finishes and lighting within restrooms, corridors and lounges.
| 01/07/2020 08:00 PM UTC |
East Bartlett Rooms 105-140 Office and Restroom Renovation
Renovation of a portion of the 1st Floor of East Bartlett. The renovation includes remodel of two restrooms and modifications to several walls to reconfigure office space.
| 12/19/2019 08:00 PM UTC |
Power Plant Turbine Oil Fire Protection System
Install a foam fire protection system and associated containment for the steam turbine generator oil lubrication system area located underneath the steam turbine generator.
| 12/17/2019 08:00 PM UTC |
Curris Business Building Gas Suppression Fire System For Rooms 019 & 021
The provision of a clean agent (Novec 1230) fire suppression system within Rooms 019 and 021 at the Curris Business Building.
| 11/21/2019 08:00 PM UTC |
Noehren Hall Student Room Remodel - Phase 2
A facelift to all of the student rooms located on Floors 1 through 5 of the south, east and center two wings of Noehren Hall. Also included is the east end of the ground floor as well as the main floor lounge and office support spaces.
| 09/24/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.