General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Redeker Center North Plaza
A pedestrian plaza improvement project including but not limited to the demolition of existing paving, placement of new paving, ADA ramps with handrails, removal and relocation of pedestrian area lighting, planting beds, overstory & ornamental trees and storm and water service improvements.
03/05/2020 08:00 PM UTC
Steam Distribution System Replacement Phase 2B - West Campus
Construction of approx. 920 ft. of cast-in-place utility tunnel with new steam & condensate piping & supporting electrical & misc. services. Replacement of piping expansion joints & related modifications within the UNI-Dome. Installation of approx. 780 ft. of direct-buried , pre-insulated, Owner furnished steam & condensate piping.
02/20/2020 08:00 PM UTC
Power Plant Cooling Tower Replacement
Replace existing field-erected cooling tower. Will also upgrade associated auxiliary systems, including condenser water pumping, electrical service, and the process control system.
02/11/2020 08:00 PM UTC
McCollum Science Hall Exterior South Deck Railing Repairs
Demolition of the existing concrete railing and plaza level concrete topping slab along with removal of the existing egress stair. A new waterproofing membrane and concrete topping slab. A new guardrail assembly and egress stair.
01/28/2020 08:00 PM UTC
Hagemann Hall and Hagemann & Rider Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation (except for Roof Area 4), adhere/mechanically attach new insulation, adhere new coverboard and install new fully adhered Fleecebacked TPA membrane.
01/28/2020 08:00 PM UTC
Dancer Hall Restroom and Corridor Improvements
Interior renovation of an existing thirteen story tower providing ADA compliant restrooms, and new finishes and lighting within restrooms, corridors and lounges.
01/07/2020 08:00 PM UTC
East Bartlett Rooms 105-140 Office and Restroom Renovation
Renovation of a portion of the 1st Floor of East Bartlett. The renovation includes remodel of two restrooms and modifications to several walls to reconfigure office space.
12/19/2019 08:00 PM UTC
Power Plant Turbine Oil Fire Protection System
Install a foam fire protection system and associated containment for the steam turbine generator oil lubrication system area located underneath the steam turbine generator.
12/17/2019 08:00 PM UTC
Curris Business Building Gas Suppression Fire System For Rooms 019 & 021
The provision of a clean agent (Novec 1230) fire suppression system within Rooms 019 and 021 at the Curris Business Building.
11/21/2019 08:00 PM UTC
Noehren Hall Student Room Remodel - Phase 2
A facelift to all of the student rooms located on Floors 1 through 5 of the south, east and center two wings of Noehren Hall. Also included is the east end of the ground floor as well as the main floor lounge and office support spaces.
09/24/2019 07:00 PM UTC
101 - 110 of 143 Solicitations
1 2 7 8 9 11 13 14 15