General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Hillside Courts Demolition
The complete demolition and deconstruction of 26 building structures and related building components.
03/22/2018 07:00 PM UTC
Parking Lot Reconstruction 2018
Reconstruct portions of the ROTH C parking lot with new concrete pavement and rehabilitate portions of the Hagemann CP parking lot by milling existing asphalt pavement followed by a new hot mixed asphalt pavement overlay.
03/22/2018 07:00 PM UTC
McCollum Science Hall 112 Renovation
Renovation of existing Room 112, a laboratory classroom space, in McCollum Science Hall.
03/20/2018 07:00 PM UTC
Hillside Courts Demolition - Asbestos & Hazardous Materials Mitigation
Providing all asbestos and hazardous materials abatement services relating to the Hillside Courts Demolition.
03/20/2018 07:00 PM UTC
Power Plant Switchgear Protective Relay Replacements - Phase 1
Medium voltage protective relay replacements including new front doors at three (3) existing 1200-amp, 15-kV vacuum circuit breakers (5-total cubicles) in Power Plant Switchgear.
02/22/2018 08:00 PM UTC
Jennings Court Improvements Phase 2
Replacement of windows, siding, gutters, exterior doors, exterior signage, exterior light fixtures, coax cable, stairs, handrails and guardrails on three (3) buildings (24 apartment units) at Jennings Court.
02/15/2018 08:00 PM UTC
McCollum Science Hall 267 Fume Hood Replacement
Replacement of three (3) fume hoods, exhaust fan and associated ductwork.
02/06/2018 08:00 PM UTC
Jennings Courts Interior Improvements Phase 1
Renovation of six (6) units within Jennings Courts. Improvements will include new flooring, casework, doors, light fixtures, shower surround, paint, and vinyl base.
01/11/2018 08:00 PM UTC
Art 2 - Storm Damage 6/15/17 - Replace Roof Top Unit
Remove existing roof top unit at Facilities Planning Building, 2601 Campus Street. Install new roof top unit on existing structural steel frame. Install/commission new Siemens DDC temperature controls.
01/09/2018 08:00 PM UTC
Latham Hall Roof Replacement
All components of the existing roof assembly will be removed down to the structural steel roof deck. 060 EPDM will be adhered to the mechanically attached tapered insulation with a gypsum cover board set in low-rise insulation. Roof related architectural sheet metal will also be part of the overall project scope.
01/04/2018 08:00 PM UTC
141 - 150 of 152 Solicitations
1 2 8 9 10 11 12 13 15