University of Northern Iowa
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Schindler Education Center Renovation - East Plaza
Demolition and reconstruction of an existing pedestrian plaza/walkway to the east of Schindler Education Center.
| 03/27/2018 07:00 PM UTC |
Hillside Courts Demolition
The complete demolition and deconstruction of 26 building structures and related building components.
| 03/22/2018 07:00 PM UTC |
Parking Lot Reconstruction 2018
Reconstruct portions of the ROTH C parking lot with new concrete pavement and rehabilitate portions of the Hagemann CP parking lot by milling existing asphalt pavement followed by a new hot mixed asphalt pavement overlay.
| 03/22/2018 07:00 PM UTC |
McCollum Science Hall 112 Renovation
Renovation of existing Room 112, a laboratory classroom space, in McCollum Science Hall.
| 03/20/2018 07:00 PM UTC |
Hillside Courts Demolition - Asbestos & Hazardous Materials Mitigation
Providing all asbestos and hazardous materials abatement services relating to the Hillside Courts Demolition.
| 03/20/2018 07:00 PM UTC |
Power Plant Switchgear Protective Relay Replacements - Phase 1
Medium voltage protective relay replacements including new front doors at three (3) existing 1200-amp, 15-kV vacuum circuit breakers (5-total cubicles) in Power Plant Switchgear.
| 02/22/2018 08:00 PM UTC |
Jennings Court Improvements Phase 2
Replacement of windows, siding, gutters, exterior doors, exterior signage, exterior light fixtures, coax cable, stairs, handrails and guardrails on three (3) buildings (24 apartment units) at Jennings Court.
| 02/15/2018 08:00 PM UTC |
McCollum Science Hall 267 Fume Hood Replacement
Replacement of three (3) fume hoods, exhaust fan and associated ductwork.
| 02/06/2018 08:00 PM UTC |
Jennings Courts Interior Improvements Phase 1
Renovation of six (6) units within Jennings Courts. Improvements will include new flooring, casework, doors, light fixtures, shower surround, paint, and vinyl base.
| 01/11/2018 08:00 PM UTC |
Art 2 - Storm Damage 6/15/17 - Replace Roof Top Unit
Remove existing roof top unit at Facilities Planning Building, 2601 Campus Street. Install new roof top unit on existing structural steel frame. Install/commission new Siemens DDC temperature controls.
| 01/09/2018 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.