General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Power Plant Switchgear Protective Relay Replacements - Phase 1
Medium voltage protective relay replacements including new front doors at three (3) existing 1200-amp, 15-kV vacuum circuit breakers (5-total cubicles) in Power Plant Switchgear.
02/22/2018 08:00 PM UTC
Jennings Court Improvements Phase 2
Replacement of windows, siding, gutters, exterior doors, exterior signage, exterior light fixtures, coax cable, stairs, handrails and guardrails on three (3) buildings (24 apartment units) at Jennings Court.
02/15/2018 08:00 PM UTC
McCollum Science Hall 267 Fume Hood Replacement
Replacement of three (3) fume hoods, exhaust fan and associated ductwork.
02/06/2018 08:00 PM UTC
Jennings Courts Interior Improvements Phase 1
Renovation of six (6) units within Jennings Courts. Improvements will include new flooring, casework, doors, light fixtures, shower surround, paint, and vinyl base.
01/11/2018 08:00 PM UTC
Art 2 - Storm Damage 6/15/17 - Replace Roof Top Unit
Remove existing roof top unit at Facilities Planning Building, 2601 Campus Street. Install new roof top unit on existing structural steel frame. Install/commission new Siemens DDC temperature controls.
01/09/2018 08:00 PM UTC
Latham Hall Roof Replacement
All components of the existing roof assembly will be removed down to the structural steel roof deck. 060 EPDM will be adhered to the mechanically attached tapered insulation with a gypsum cover board set in low-rise insulation. Roof related architectural sheet metal will also be part of the overall project scope.
01/04/2018 08:00 PM UTC
Noehren Hall Restroom Renovation Phase 1
The renovation of existing community restrooms at Noehren Hall into a group of eight individual use bathrooms on each of the four floors. A new energy recovery unit will be installed along with the required plumbing and electrical.
12/07/2017 08:00 PM UTC
Strayer-Wood Theatre Lighting
New theatre lighting, construction of a dimmer room and all associated electrical panels, pathways and power.
11/28/2017 08:00 PM UTC
131 - 138 of 138 Solicitations
1 2 6 7 8 9 10 11 12 14 Next →