Schindler Education Center Renovation - East Plaza
Demolition and reconstruction of an existing pedestrian plaza/walkway to the east of Schindler Education Center.
03/27/2018 07:00 PM UTC
Hillside Courts Demolition
The complete demolition and deconstruction of 26 building structures and related building components.
03/22/2018 07:00 PM UTC
Parking Lot Reconstruction 2018
Reconstruct portions of the ROTH C parking lot with new concrete pavement and rehabilitate portions of the Hagemann CP parking lot by milling existing asphalt pavement followed by a new hot mixed asphalt pavement overlay.
03/22/2018 07:00 PM UTC
McCollum Science Hall 112 Renovation
Renovation of existing Room 112, a laboratory classroom space, in McCollum Science Hall.
03/20/2018 07:00 PM UTC
Hillside Courts Demolition - Asbestos & Hazardous Materials Mitigation
Providing all asbestos and hazardous materials abatement services relating to the Hillside Courts Demolition.
03/20/2018 07:00 PM UTC
Power Plant Switchgear Protective Relay Replacements - Phase 1
Medium voltage protective relay replacements including new front doors at three (3) existing 1200-amp, 15-kV vacuum circuit breakers (5-total cubicles) in Power Plant Switchgear.
02/22/2018 08:00 PM UTC
Jennings Court Improvements Phase 2
Replacement of windows, siding, gutters, exterior doors, exterior signage, exterior light fixtures, coax cable, stairs, handrails and guardrails on three (3) buildings (24 apartment units) at Jennings Court.
02/15/2018 08:00 PM UTC
McCollum Science Hall 267 Fume Hood Replacement
Replacement of three (3) fume hoods, exhaust fan and associated ductwork.
02/06/2018 08:00 PM UTC
Jennings Courts Interior Improvements Phase 1
Renovation of six (6) units within Jennings Courts. Improvements will include new flooring, casework, doors, light fixtures, shower surround, paint, and vinyl base.
01/11/2018 08:00 PM UTC
Art 2 - Storm Damage 6/15/17 - Replace Roof Top Unit
Remove existing roof top unit at Facilities Planning Building, 2601 Campus Street. Install new roof top unit on existing structural steel frame. Install/commission new Siemens DDC temperature controls.
01/09/2018 08:00 PM UTC