General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Towers Center Moisture Repairs
The work includes replacement of gypsum board wall surfaces, new carpet tile, new cabinetry, resurfacing of existing laminate cabinetry/tables, minor floor tile work, painting, and suspended acoustic tile ceiling.
04/04/2019 07:00 PM UTC
Noehren Roof (SE Wings) and Noehren and Shull Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation, adhere/mechanically attach new insulation, adhere new coverboard and install new fully adhered TPA membrane.
03/28/2019 07:00 PM UTC
Steam Distribution System Replacement Phase 2A - Campbell Hall to Towers Center
Replace approximately 900 feet of existing direct buried steam and condensate piping from Campbell Hall to Towers Center with new pre-engineered direct buried steam and condensate piping. All pre-insulated piping is OWNER-furnished.
03/12/2019 07:00 PM UTC
Noehren Hall Student Room Remodel - Phase 1
Remodeling of student rooms located on floors 1 through 4 of Noehren Hall. Replacement of millwork, flooring and painting as well as plumbing, power, lighting, fire alarm, data & wifi work. Corridor and lounge upgrades.
10/30/2018 07:00 PM UTC
3219 Hudson Road Roof Replacement
Installation of new fluid applied roof membrane over an existing metal roof. Project includes preparation necessary before installation of coating.
07/31/2018 07:00 PM UTC
West Campus Recreation Field Enhancements
Construction of new recreation fields located east of the gravel road, PE Center Drive. New fields will be developed utilizing a balance site cut and fill approach. Site drainage, pedestrian access, irrigation of limited areas, and some fencing will be addressed. Additionally an existing metal storage building will be relocated.
06/28/2018 07:00 PM UTC
Kamerick Art Building Reroofing
Remove existing rock ballast and EPDM membrane, remove and/or reuse existing insulation, mechanically attach new insulation, adhere new coverboard and install new fully adhered EPDM membrane.
06/12/2018 07:00 PM UTC
Institutional Roads 2018
Reconstruction of Dakota Street (East of Missouri Street) and reconstruction of Missouri Street ( Campus Street to Gilchrist Drive).
04/12/2018 07:00 PM UTC
Steam Tunnel T-4 Pipe Anchor Repair
Replace the existing steam and condensate pipe anchors and repair portions of the Tunnel T-4 wall.
03/29/2018 07:00 PM UTC
Schindler Education Center Renovation - East Plaza
Demolition and reconstruction of an existing pedestrian plaza/walkway to the east of Schindler Education Center.
03/27/2018 07:00 PM UTC
131 - 140 of 152 Solicitations
1 2 8 9 10 11 12 14 16