General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
McLeod Center Loading Dock Canopy Repairs
Removal & replacement of the existing loading dock gypsum board canopy & supporting framing. Replace with new framing and 1" metal flush panel. Remove existing architectural composite metal panel fascia, waterproof the fascia and reinstall the existing panels; supplementing missing panels with new materials.
08/08/2019 07:00 PM UTC
Facilities Management North Parking Lot Reconstruction
Reconstruction of the Facilities Management North Parking Lot located at West 30th Street. Work includes removal and replacement of the existing parking lot pavement and installation of new Hot Mix Asphalt pavement, storm sewer piping and intakes, minor electrical conduit and junction box, and parking lot markings.
06/25/2019 07:00 PM UTC
Curris Business Building Replace Hall Lighting Updates
Removal of existing lighting fixtures and replacing them with new LED lighting, and the removal of existing acoustical ceiling tiles and replacing them with new acoustical ceiling tiles.
06/13/2019 07:00 PM UTC
Nielsen Field House Upgrades
Upgrades and renovations to the Nielsen Field House to support the efforts of the Military Science and the Child Development Center programs.
06/13/2019 07:00 PM UTC
Center for Energy and Environmental Education Window Replacement Phase 5
Replace existing clad wood windows with new fiberglass windows and replace existing flashing, metal trim, and wood trim with new.
06/11/2019 07:00 PM UTC
Admission Center
Renovation of the entry and upper levels of the Art 2 Building. The program calls for space for a presentation and gallery for campus tour groups and office space for admission staff. Compliance with accessibility will be achieved by a new main entry and elevator, as well as code upgrades to public space and restrooms. Additional modifications include mechanical upgrades and re-routing, wireless access points, and LED lighting.
06/06/2019 07:00 PM UTC
Center for Energy & Environmental Education Selective Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation, adhere/mechanically attached new insulation, adhere new coverboard and install new fully adhered TPA membrane or remove existing EPDM and mechanically fasten additional insulation adhere new coverboard and install new fully adhered TPA membrane.
06/06/2019 07:00 PM UTC
East Bartlett Study Abroad Renovation
Renovation of an existing office suite and lobby in East Bartlett. The renovation will include new walls, ceilings, lights, paint, carpet and doors throughout. Modifications to the existing HVAC, electrical and data will also take place.
05/23/2019 07:00 PM UTC
Curris Business Building Gas Suppression Fire System for Rooms 019 & 021
The provision of a clean agent (Novec 1230) fire suppression system within Rooms 019 and 021 at the Curris Business Building
04/30/2019 07:00 PM UTC
Parking Lot Reconstruction 2019
Reconstruction of north portions of the Gilchrist Parking Lot. Work will also include installation of 12" water main along 27th Street from Hudson Road east to Campus Street, storm sewer piping and intakes, full depth HM pavement, PCC Sidewalk, PCC Curb and Gutter, and PCC pavement.
04/30/2019 07:00 PM UTC
111 - 120 of 143 Solicitations