General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Admission Center
Renovation of the entry and upper levels of the Art 2 Building. The program calls for space for a presentation and gallery for campus tour groups and office space for admission staff. Compliance with accessibility will be achieved by a new main entry and elevator, as well as code upgrades to public space and restrooms. Additional modifications include mechanical upgrades and re-routing, wireless access points, and LED lighting.
06/06/2019 07:00 PM UTC
Center for Energy & Environmental Education Selective Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation, adhere/mechanically attached new insulation, adhere new coverboard and install new fully adhered TPA membrane or remove existing EPDM and mechanically fasten additional insulation adhere new coverboard and install new fully adhered TPA membrane.
06/06/2019 07:00 PM UTC
East Bartlett Study Abroad Renovation
Renovation of an existing office suite and lobby in East Bartlett. The renovation will include new walls, ceilings, lights, paint, carpet and doors throughout. Modifications to the existing HVAC, electrical and data will also take place.
05/23/2019 07:00 PM UTC
Curris Business Building Gas Suppression Fire System for Rooms 019 & 021
The provision of a clean agent (Novec 1230) fire suppression system within Rooms 019 and 021 at the Curris Business Building
04/30/2019 07:00 PM UTC
Parking Lot Reconstruction 2019
Reconstruction of north portions of the Gilchrist Parking Lot. Work will also include installation of 12" water main along 27th Street from Hudson Road east to Campus Street, storm sewer piping and intakes, full depth HM pavement, PCC Sidewalk, PCC Curb and Gutter, and PCC pavement.
04/30/2019 07:00 PM UTC
Institutional Roads 2019
Reconstruction of Panther Parkway ( W. 31st Street to W. 27th Street) - Phase 1 and reconstruction of West 27th Street (East of Minnesota Street). Scope of work will include existing pavement removals, earth work, subsurface drainage, storm sewer and intake construction, new PC Concrete pavement and sidewalks and turf reconstruction.
04/09/2019 07:00 PM UTC
Towers Center Moisture Repairs
The work includes replacement of gypsum board wall surfaces, new carpet tile, new cabinetry, resurfacing of existing laminate cabinetry/tables, minor floor tile work, painting, and suspended acoustic tile ceiling.
04/04/2019 07:00 PM UTC
Noehren Roof (SE Wings) and Noehren and Shull Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation, adhere/mechanically attach new insulation, adhere new coverboard and install new fully adhered TPA membrane.
03/28/2019 07:00 PM UTC
Steam Distribution System Replacement Phase 2A - Campbell Hall to Towers Center
Replace approximately 900 feet of existing direct buried steam and condensate piping from Campbell Hall to Towers Center with new pre-engineered direct buried steam and condensate piping. All pre-insulated piping is OWNER-furnished.
03/12/2019 07:00 PM UTC
Noehren Hall Student Room Remodel - Phase 1
Remodeling of student rooms located on floors 1 through 4 of Noehren Hall. Replacement of millwork, flooring and painting as well as plumbing, power, lighting, fire alarm, data & wifi work. Corridor and lounge upgrades.
10/30/2018 07:00 PM UTC
111 - 120 of 138 Solicitations
1 2 6 7 8 9 10 12 14