City of Sidney
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
24-08
24-08 WWTP Raw Water Pump #4 Replacement
The project consists of the replacement of existing raw water pump #4 with a new water pump per specifications contained within the online Bidding Documents.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $70,000
| 04/11/2024 07:00 PM UTC |
24-07
24-07 WWTP Screen Building Make-Up Air Unit Replacements
The project consists of the replacement of existing Reznor Make-Up Air (MUA) Units 2 & 3 with new 460 volt gas-fired MUA units to include: disconnecting & removing the existing units and furnishing & installing new units.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $86,250
| 04/11/2024 06:30 PM UTC |
24-09
24-09 Fourth Avenue Sanitary Sewer Replacement
The project consists of the replacement of approximately 2270 l.f. of 8” sanitary sewer on Fourth Avenue between Michigan Street and Paul Street; abandonment of approximately 185 l.f. of 8” sanitary sewer along Park Street; and replacement of active sanitary laterals from sanitary sewer main to right-of-way line within the project limits.
State of Ohio prevailing wage rates apply.
Engineer's Estimate: $724,515
| 04/11/2024 03:30 PM UTC |
24-06
24-06 St. Marys Avenue & Hoewisher Road Traffic Signal
The project includes the installation of a new mast arm traffic signal at the intersection of St. Marys Avenue & Hoewisher Road. The project schedule requires that the Contractor complete all underground work and signal pole foundations from June 2024 to August 2024 and in coordination with the General Contractor for the Burr Oak Subdivision. Final completion of the project will be July 25, 2025.
State of Ohio Prevailing Wage Rates apply.
Estimate: $355,862
| 04/04/2024 03:30 PM UTC |
CDD 2024-01
CDD 2024-01 301 N. Ohio Avenue Demolition & Site Clearing
The work includes furnishing of all labor, materials, transportation, tools, supplies, equipment, appurtenances, mobilization/demobilization, and bonding necessary to complete the demolition, removal, and disposal of the existing building at 301 N. Ohio Avenue, Sidney, Ohio.
A Non-Mandatory Pre-Bid Meeting will be held for prospective bidders onsite Thursday, March 21, 2024, at 3:00 p.m. (EST) at 301 N. Ohio Avenue, Sidney, Ohio 45365.
State of Ohio Prevailing Wage Rates will not apply unless project costs are over the threshold of $75,000.
Budget Estimate: $50,000
| 03/28/2024 07:00 PM UTC |
24-05 2024 Street Resurfacing
24-05 2024 STREET RESURFACING
The project includes planning of asphalt, placement of asphalt surface course, asphalt concrete surface course, and thermoplastic paint markings.
Construction Estimate: $281,270.88
| 03/07/2024 04:30 PM UTC |
24-04 ODOT Urban Paving Curb & Gutter Replacement
24-04
ODOT URBAN PAVING CURB & GUTTER REPLACEMENT
The project will consist of the removal & replacement of curb & gutter along State Route 29 (St. Marys Avenue, Pike Street, & Ohio Avenue) in advance of roadway asphalt resurfacing.
Construction Estimate: $634,840.00
State of Ohio Prevailing Wages will apply.
| 02/29/2024 07:30 PM UTC |
24-03 Curb & Gutter Replacement
24-03
2024 CURB & GUTTER REPLACEMENT
The project consists of the removal & replacement of curb & gutter and curb ramps with truncated domes and also includes the reconnection of drain tiles and site restoration.
Construction Estimate: $87,256.00
State of Ohio Prevailing Wages will apply.
| 02/29/2024 04:30 PM UTC |
24-02 2024 Sidewalk Program
24-02 2024 Sidewalk Program
The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching.
State of Ohio Prevailing Wage Rates apply.
Construction Estimate: $290,702
| 02/15/2024 04:30 PM UTC |
24-01 St Marys Avenue Storm Sewer Replacement
24-01 St. Marys Avenue Storm Sewer Replacement
The project consists of the replacement of storm sewer on St. Marys Avenue near Harmon Park.
State of Ohio Prevailing Wage Rates apply.
Estimate: $73,902
| 02/01/2024 04:30 PM UTC |