32821400
City of Findlay HAN-Interstate & FHS Trail, PID115232 Construct a multi-use path in the City of Findlay that will link to the existing and under design multiuse paths. The Interstate Trail section will begin at the southwest corner of Broad Avenue and Howard Street and at the rear entrance to Walmart. The FHS Trail section will start at the northwest corner of Broad Avenue and Howard Street and end at the north entrance to Findlay High School, which also aligns with Foulke Avenue. The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy Final Completion: on or before September 13, 2024 Engineering Estimate: $ 1,165,529.67
05/15/2024 06:00 PM UTC
35740500
BLANCHARD STREET WATERLINE REPLACEMENT, PHASE II (OPWC) This project consists of installing a new 16-inch C905 waterline on South Blanchard Street, running along the east side of the roadway, from Sixth Street to E. Hobart Ave. This project shall consist of, but not limited to, 2,705 LF of 16-inch C905 waterline, 30 LF of 8-inch C909 waterline, 50 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching. This project is funded by City of Findlay Water Funds as well as Ohio Public Works Commission (OPWC). Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. Final Completion Date: August 2, 2024 Engineer’s Estimate: $1,115,000.00
05/06/2024 06:00 PM UTC
356425000
West Park Sanitary Sewer Extension- Newell Street The base bid consists of installing a new 8-inch sanitary sewer on Newell St and a section on the north side of Lima Ave running towards Blaine Ave. Included in the base bid, but not limited to, is the addition of new service laterals for residents, sanitary structures, rock excavation, asphalt trench repair, sidewalk replacement, grading, and seeding. The base bid consists of installing 667 LF of 8-inch sanitary sewer and 134 LF of 6-inch sanitary sewer. The majority of the new sanitary line will be under pavement sections and will need premium backfill. Final Completion: October 4, 2024 Engineering Estimate: $262,470
05/01/2024 06:00 PM UTC
35631500
This project consists of the widening of Township Road 230 between and County Road 212 and Township Road 99 as well as a sanitary sewer along TR 99 from Howard Run Ditch to TR 230. The project widening is from 2-lanes to 3-lanes with the addition of a fourth lane at CR 212. The project also includes installing storm sewer and concrete curb & gutter the length of the TR 230 project. Included in the storm sewer improvement, but not limited to, is 1,042 LF of 24-inch storm sewer, 10 LF of 18-inch storm sewer, 367 LF of 15-inch storm sewer, 665 LF of 12-inch storm sewer, storm manhole installations, and catch basins. The sanitary sewer improvement is 3,605 LF of 18-inch sanitary sewer, sanitary manhole, and asphalt pavement trench repair as required. Grading & seeding is also included. Estimated Cost: $3,631,000
04/30/2024 06:00 PM UTC
Cold Storage Building D/B Qualifications
The Council for the City of Findlay, Ohio is requesting statements of qualifications pursuant to Ohio Revised Code Section 153.65, et seq., from firms to provide design-build services for its Cold Storage Building Project. Requests for Qualifications may be obtained from Lee P. Rausch, PE, Assistant City Engineer at lrausch@findlayohio.gov. Qualifications will be accepted until 2:00 p.m., local time, April 11, 2024.
04/18/2024 06:00 PM UTC
35723800
SMALL WATERLINE UPGRADES This project consists of installing a new 6-inch C909 waterlines on Allen Avenue, Midland Avenue, Garfield Avenue and George Street from Main Street to the railroad to the East and in the North/South alley running from Allen Avenue to Garfield Avenue. The new waterline will need to be directional drilled underneath Main Street at all four intersections. This project shall consist of, but not limited to, 5,435 LF of 6-inch C909 waterline, 260 LF of 6-inch directional drill, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings and seeding and mulching. This project is funded by City of Findlay Water Fund Funds as well as Community Development Block Grant (CDBG) Grants. Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the Davis Bacon Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. Final Completion Date: August 31, 2024 Engineer’s Estimate: $1,069,630.00
04/04/2024 06:00 PM UTC
35234500
City of Findlay Airport Runway 7-25 PAPI and REIL Lighting System Replacement The scope of this project includes removal and replacement of existing PAPI and REIL equipment on existing foundations and wiring. The existing PAPI Lighting System needs replacement due to the consistent maintenance needs and the age of the equipment. The existing REIL System is currently non-functional due to the lightning strike. The specific work elements include the following: - Removal of Existing PAPI Lighting System - Removal of Existing REIL Lighting System - Removal of Existing Wiring - Installation of new conduit for PAPI wiring - Installation of New PAPI Lighting System and Wiring - Installation of New REIL Lighting System and Wiring - Restoration of disturbed area Pre-Bid Meeting will be held on Wednesday, March 6, 2024 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840. Engineer's Estimate (Base Bid)- $429,045 Completion Date: 45 Days After the Start Date of Construction
03/13/2024 06:00 PM UTC
26
Item #26 - Fire Hydrants - The City of Findlay is accepting proposals for Fire Hydrants for the period January 1, 2024 to December 31, 2024.
03/11/2024 06:00 PM UTC
32840100-B
City of Findlay 2024 Annual Resurfacing Program-Contract B (Asphalt) This contract is for asphalt work only, consisting of pavement planning (approximately 34,221 SY) and asphalt resurfacing (approximately 1,732 CY) on various streets within the City of Findlay or Hancock County. Incidental items include, but not limited to, are adjustment of manholes, and joint sealing. Other minor work is described in the details for each segment of pavement. The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. The project is funded through the City of Findlay’s Capital Improvements Fund. State prevailing wages and the City of Findlay income taxes shall apply. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Projected Start Date: On or Before July 12, 2024 Final Completion: On or Before September 13, 2024 Engineering Estimate: $ 472,000 (Base Bid)
02/22/2024 07:00 PM UTC
32840100-A
City of Findlay 2024 Annual Resurfacing Program-Contract A (Concrete) PROJECT DESCRIPTION This project consists of nearly 22,458 (LF) of curb removal and replacement on various streets within the City of Findlay in Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 19,861 SF), concrete drive replacement (approximately 1,489 SY), adjustment of manholes and catch basins, grading and seeding. Other minor work is described in the details for each segment of roadway. The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. The project is funded through the City of Findlay’s Capital Improvements Fund. State prevailing wages and the City of Findlay income taxes shall apply. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Final Completion: July 12, 2024 Engineering Estimate: $ 1,072,000 (Base Bid)