General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
HAN Blanchard Street Bridge Rehab
The services include preparation of construction contract plans for HAN Blanchard Street Bridge Rehab as well as assisting in obtaining Municipal Bridge Grant Funds.
04/16/2026 06:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
1601
Item #1601-Ready Mix Concrete - The City of Findlay is accepting proposals for Ready Mix Concrete for the period January 1, 2025 to December 31, 2025.
10/10/2024 06:00 PM UTC
2
Item #2 - FLUOROSILICIC ACID - The City of Findlay is accepting proposals for Fluorosilicic Acid for the period January 1, 2025 to December 31, 2025.
10/10/2024 06:00 PM UTC
67
Item #67 -SODIUM PERCARBONATE PEROXYDRATE GRANULES - The City of Findlay is accepting proposals for Sodium Percarbonate Peroxydrate Granules for the period January 1, 2025 to December 31, 2025.
10/10/2024 06:00 PM UTC
69
Item #69 -Large Diameter and Gate Valve The City of Findlay is accepting proposals for Large Diameter and Gate Valves with electric actuators, for the period January 1, 2025 to December 31, 2025.
10/10/2024 06:00 PM UTC
1603
Item #1603-Class C Concrete - The City of Findlay is accepting proposals for Class C Concrete for the period January 1, 2025 to December 31, 2025.
10/10/2024 06:00 PM UTC
25
Item #25 -Type K Soft Copper Tubbing- The City of Findlay is accepting proposals for Type K Soft Copper Tubbing for the period January 1, 2025 to December 31, 2025.
10/10/2024 12:00 PM UTC
27
Item #27 - Waterline Gate Valves - The City of Findlay is accepting proposals for various sizes and quantities of waterline gate valves to be supplied and delivered for the period of January 1, 2025 to December 31, 2025.
10/10/2024 06:00 AM UTC
32821400
City of Findlay HAN-Interstate & FHS Trail, PID115232 Construct a multi-use path in the City of Findlay that will link to the existing and under design multiuse paths. The Interstate Trail section will begin at the southwest corner of Broad Avenue and Howard Street and at the rear entrance to Walmart. The FHS Trail section will start at the northwest corner of Broad Avenue and Howard Street and end at the north entrance to Findlay High School, which also aligns with Foulke Avenue. The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy This project will include an optional bid for the multiuse path material. Option A will include an asphalt and concrete 10-ft wide multiuse path, and option B will include all concrete 10-ft wide multiuse path. One Option must be selected when bidding, this project will be awarded off of the lowest base bid price utilizing Option A or Option B. Final Completion: on or before August 8, 2025 Engineering Estimate: Option A (Concrete and Asphalt Trial) $1,165,529.67 Option B (Concrete Trail) $1,228,322.37
08/14/2024 06:00 PM UTC
32852700
HAN-Western & Sandusky Traffic Signal/ Railroad Interconnect PID100233 (Rebid) Located within the City of Findlay this project will consist of installing new mast arm traffic signals at the intersection of Western Avenue and Sandusky Street. The intersection is including interconnect for railroad preemption. Norforlk Southern Railroad crossings include: Western Avenue 476820N, Sandusky Street 476821V and Sandusky Street 920845H. Additional Improvements include a 2 Ft widening to the north of the west leg of Sandusky Street, along with curb ramp and sidewalk improvements at the project intersection. Final Completion: May 2, 2025 Engineer Estimate: $580,769.43
08/08/2024 06:00 PM UTC
35512100
Washington Ave. Storm Sewer Upgrade, PH. I This project consists of storm sewer improvements to Washington Avenue between Olive and Sixth Streets. Included in the storm sewer improvement, but not limited to, is approximately 788 LF of 10-inch storm sewer, 548 LF of 12-inch storm sewer, storm manhole installations, and catch basins. The project also includes asphalt pavement trench repair as required. Final grading & seeding is also included. Final Completion: Dec. 12, 2024 Engineering Estimate: $450,000
07/17/2024 07:00 PM UTC
81 - 90 of 352 Solicitations
1 2 5 6 7 9 11 12 13 35 36