General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
35650800
2025 Annual Sewer Cleaning (Large Diameter) Project Description The project shall consist of the cleaning and televising of several aging and deteriorating sanitary sewer lines in the City of Findlay. The primary objective is to provide the City with a good visual inspection of the condition of the sewers. The Base Bid includes several sewer locations in different areas of the City. Some sewer lines are in close proximity of each other while others are somewhat isolated. The sizes to be cleaned include 15-inch, 20-inch, 24-inch, 30-inch, 36-inch, 42-inch, 45-inch, 48-inch, 51-inch and 66-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments. Incidental items include but are not limited to mobilization, bypass pumping, dewatering, traffic control, etc. Bidders are advised to pay close attention to the specific details in the General Notes and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders should be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Completion Date: October 3, 2025 Engineering Estimate (Base Bid Only): $220,000.00
06/24/2025 06:00 PM UTC
35652600
Sherry Street Sanitary Sewer Replacement This project consists of removing 257 feet of an existing 18” sanitary sewer pipe and replacing with SDR26 on Sherry Street from the first manhole south of Sixth Street North. A new manhole will be set 50 feet South of the existing manhole on the North side of Sixth Street. The sanitary sewer needs to be operational each night. There are also 7 laterals that will need to be tied in to this section of the new sanitary sewer. This project will also include a 10-foot spot repair on the existing 12” sanitary sewer on Sherry Street from the manhole North of Pearl Street to the next manhole North. This section of 12” sanitary sewer pipe will be replaced with SDR35. There are 2 laterals to reconnected in this section. Bidders are advised to visit the site before turning in price. If needed the Engineering Department will be available to meet on site to go over any specific questions. Bidders are advised to pay close attention to the specific details in the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. Bidders shall be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction. Specific Notes: 1. The existing 18” sanitary sewer is roughly 16 FT deep at the downstream manhole and 15 FT deep at the upstream manhole. 2. Sanitary service must be maintained during the project. Final Completion Date: October 17th, 2025 Engineering Estimate: $127,125.00
06/24/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
35633600
City of Findlay 2023 Sewer and Manhole Lining Program The project consists of no-dig rehabilitation of several deteriorating sanitary sewer lines and Manholes in the City of Findlay (hereinafter referred to as “City”). Incidental to the lining shall be the reinstatement of sewer service laterals without excavation. The Base Bid includes several sewer and manhole locations in different areas of the City. Some sewer lines and manholes to be lined are in close proximity of each other while others are somewhat isolated. The sizes to be lined include 8-inch, 10-inch, 12-inch, 15-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe and a unit price per vertical liner foot for manholes. If sizes, lengths, depths or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments. Completion Date: April 26, 2024 Engineering Estimate (Base Bid Only): $704,974.05
12/12/2023 07:00 PM UTC
Engineering Services RFQ TR230 Reconstruction
The City of Findlay desires to reconstruct TR230 between CR212 and TR99. Services will include assistance in right of way acquisition, widening TR230 from 2-lanes to 3-lanes with a center left turn lane and associated storm infrastructure, design of a traffic signal at the TR230 and CR212 intersection, utility coordination with private utility companies, extension of a 24-inch gravity sewer along TR99 from Howard Run to TR230 and a 16-inch waterline along TR230 from CR212 to TR99. The City will provide the topographical and boundary/right of way survey for this project. The intent of the Project is to provide access and utilities to the proposed SHEETZ Distribution Center under design west of TR230 between TR99 and CR212. Access and utilities must be provided by the end of 2024.
11/30/2023 07:00 PM UTC
Parker Training Facility/Airport Terminal Restroom Remodel
PARKER TRAINING/AIRPORT TERMINAL RESTROOM REMODEL The City of Findlay has recently completed renovation projects at the Parker Training Facility located at 315 South West Street (entrance off West Crawford Street) and the Airport Terminal located at 1205 Lima Avenue. These projects will complete the renovation projects by adding restrooms and removing the existing at the Parker Center and by renovating the restrooms at the Airport Terminal. Work will include all necessary ADA provisions. Engineering Estimate: $ 430,000
11/21/2023 07:00 PM UTC
1
Item #1-Pebble Lime Bulk - The City of Findlay is accepting proposals for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
3
Item #3-Liquid Sodium Permanganate - The City of Findlay is accepting proposals for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
7
Item #7-Liquid Carbon Dioxide (Bulk) - The City of Findlay is accepting proposals for Liquid Carbon Dioxide for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
8
Item #8-Activated Carbon - The City of Findlay is accepting proposals for Activated Carbon for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
11
Item #11-Soda Ash - The City of Findlay is accepting proposals for Soda Ash for the period January 1, 2024, to December 31, 2024.
10/17/2023 06:00 PM UTC
17
Item #17-Crushed Stone - The City of Findlay is accepting proposals for Crushed Stone for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
40
Item #40 - Elevator Maintenance - The City of Findlay is accepting proposals for Elevator Maintenance for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
61 - 70 of 307 Solicitations