2025 Annual Sewer Cleaning (Large Diameter)
Project Description
The project shall consist of the cleaning and televising of several aging and deteriorating sanitary sewer lines in the City of Findlay. The primary objective is to provide the City with a good visual inspection of the condition of the sewers. The Base Bid includes several sewer locations in different areas of the City. Some sewer lines are in close proximity of each other while others are somewhat isolated. The sizes to be cleaned include 15-inch, 20-inch, 24-inch, 30-inch, 36-inch, 42-inch, 45-inch, 48-inch, 51-inch and 66-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments. Incidental items include but are not limited to mobilization, bypass pumping, dewatering, traffic control, etc.
Bidders are advised to pay close attention to the specific details in the General Notes and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders should be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project.
Completion Date: October 3, 2025
Engineering Estimate (Base Bid Only): $220,000.00
| 06/24/2025 06:00 PM UTC |
35652600
Sherry Street Sanitary Sewer Replacement
This project consists of removing 257 feet of an existing 18” sanitary sewer pipe and replacing with SDR26 on Sherry Street from the first manhole south of Sixth Street North. A new manhole will be set 50 feet South of the existing manhole on the North side of Sixth Street. The sanitary sewer needs to be operational each night. There are also 7 laterals that will need to be tied in to this section of the new sanitary sewer. This project will also include a 10-foot spot repair on the existing 12” sanitary sewer on Sherry Street from the manhole North of Pearl Street to the next manhole North. This section of 12” sanitary sewer pipe will be replaced with SDR35. There are 2 laterals to reconnected in this section. Bidders are advised to visit the site before turning in price. If needed the Engineering Department will be available to meet on site to go over any specific questions.
Bidders are advised to pay close attention to the specific details in the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. Bidders shall be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project.
After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction.
Specific Notes:
1. The existing 18” sanitary sewer is roughly 16 FT deep at the downstream manhole and 15 FT deep at the upstream manhole.
2. Sanitary service must be maintained during the project.
Final Completion Date: October 17th, 2025
Engineering Estimate: $127,125.00
| 06/24/2025 06:00 PM UTC |
Number | Deadline |
---|---|
25
Item #25 -Type K Soft Copper Tubbing- The City of Findlay is accepting proposals for Type K Soft Copper Tubbing for the period January 1, 2025 to December 31, 2025.
| 10/10/2024 12:00 PM UTC |
27
Item #27 - Waterline Gate Valves - The City of Findlay is accepting proposals for various sizes and quantities of waterline gate valves to be supplied and delivered for the period of January 1, 2025 to December 31, 2025.
| 10/10/2024 06:00 AM UTC |
32821400
City of Findlay HAN-Interstate & FHS Trail, PID115232
Construct a multi-use path in the City of Findlay that will link to the existing and under design multiuse paths. The Interstate Trail section will begin at the southwest corner of Broad Avenue and Howard Street and at the rear entrance to Walmart. The FHS Trail section will start at the northwest corner of Broad Avenue and Howard Street and end at the north entrance to Findlay High School, which also aligns with Foulke Avenue.
The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply.
The DBE goal for this project is 7%.
All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy
This project will include an optional bid for the multiuse path material. Option A will include an asphalt and concrete 10-ft wide multiuse path, and option B will include all concrete 10-ft wide multiuse path. One Option must be selected when bidding, this project will be awarded off of the lowest base bid price utilizing Option A or Option B.
Final Completion: on or before August 8, 2025
Engineering Estimate:
Option A (Concrete and Asphalt Trial) $1,165,529.67
Option B (Concrete Trail) $1,228,322.37
| 08/14/2024 06:00 PM UTC |
32852700
HAN-Western & Sandusky Traffic Signal/ Railroad Interconnect PID100233 (Rebid)
Located within the City of Findlay this project will consist of installing new mast arm traffic signals at the intersection of Western Avenue and Sandusky Street. The intersection is including interconnect for railroad preemption. Norforlk Southern Railroad crossings include: Western Avenue 476820N, Sandusky Street 476821V and Sandusky Street 920845H. Additional Improvements include a 2 Ft widening to the north of the west leg of Sandusky Street, along with curb ramp and sidewalk improvements at the project intersection.
Final Completion: May 2, 2025
Engineer Estimate: $580,769.43
| 08/08/2024 06:00 PM UTC |
35512100
Washington Ave. Storm Sewer Upgrade, PH. I
This project consists of storm sewer improvements to Washington Avenue between Olive and Sixth Streets. Included in the storm sewer improvement, but not limited to, is approximately 788 LF of 10-inch storm sewer, 548 LF of 12-inch storm sewer, storm manhole installations, and catch basins. The project also includes asphalt pavement trench repair as required. Final grading & seeding is also included.
Final Completion: Dec. 12, 2024
Engineering Estimate: $450,000
| 07/17/2024 07:00 PM UTC |
35242900
City of Findlay Airport Runway 7-25 Rehabilitate Runway 7-25
This project will rehabilitate Runway 7-25 consisting of 5,883 feet by 100 feet, Runway 7 displaced threshold of 324 feet by 100 feet, Runway 25 displaced threshold of 999 feet by 100 feet, design a conforming turnaround runway 25 end, select portions of the associated taxiway connector system, and replacement of the High Intensity Runway Lights. This rehabilitation will include cold milling, and re-paving of the runway, isolated pavement repair, drainage and electrical improvements, seal coating a portion of the runway intersection and new pavement markings.
Pre-Bid Meeting will be held on Tuesday, July 2, 2024 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840.
This project has a DBE goal of 3.99% and a WBE goal of 6.9%
Engineer's Estimate (Base Bid)- $4,875,100
Completion Date: September 26, 2025
| 07/11/2024 06:00 PM UTC |
32852700
HAN-Western & Sandusky Traffic Signal/ Railroad Interconnect PID100233
Located within the City of Findlay this project will consist of installing new mast arm traffic signals at the intersection of Western Avenue and Sandusky Street. The intersection is including interconnect for railroad preemption. Norforlk Southern Railroad crossings include: Western Avenue 476820N, Sandusky Street 476821V and Sandusky Street 920845H. Additional Improvements include a 2 Ft widening to the north of the west leg of Sandusky Street, along with curb ramp and sidewalk improvements at the project intersection.
Final Completion: May 2, 2025
Engineer Estimate: $580,769.43
| 06/27/2024 06:00 PM UTC |
32821400
City of Findlay HAN-Interstate & FHS Trail, PID115232
Construct a multi-use path in the City of Findlay that will link to the existing and under design multiuse paths. The Interstate Trail section will begin at the southwest corner of Broad Avenue and Howard Street and at the rear entrance to Walmart. The FHS Trail section will start at the northwest corner of Broad Avenue and Howard Street and end at the north entrance to Findlay High School, which also aligns with Foulke Avenue.
The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply.
The DBE goal for this project is 7%.
All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy
Final Completion: on or before September 13, 2024
Engineering Estimate: $ 1,165,529.67
| 05/15/2024 06:00 PM UTC |
35740500
BLANCHARD STREET WATERLINE REPLACEMENT, PHASE II (OPWC)
This project consists of installing a new 16-inch C905 waterline on South Blanchard Street, running along the east side of the roadway, from Sixth Street to E. Hobart Ave.
This project shall consist of, but not limited to, 2,705 LF of 16-inch C905 waterline, 30 LF of 8-inch C909 waterline, 50 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching.
This project is funded by City of Findlay Water Funds as well as Ohio Public Works Commission (OPWC). Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
Final Completion Date: August 2, 2024
Engineer’s Estimate: $1,115,000.00
| 05/06/2024 06:00 PM UTC |
356425000
West Park Sanitary Sewer Extension- Newell Street
The base bid consists of installing a new 8-inch sanitary sewer on Newell St and a section on the north side of Lima Ave running towards Blaine Ave. Included in the base bid, but not limited to, is the addition of new service laterals for residents, sanitary structures, rock excavation, asphalt trench repair, sidewalk replacement, grading, and seeding. The base bid consists of installing 667 LF of 8-inch sanitary sewer and 134 LF of 6-inch sanitary sewer. The majority of the new sanitary line will be under pavement sections and will need premium backfill.
Final Completion: October 4, 2024
Engineering Estimate: $262,470
| 05/01/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.