Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2027, to December 31, 2027.
| 11/12/2026 07:00 PM UTC |
|
35664600
This project consists of removing an existing 12” water line and a 15” sanitary line out of the existing 36” storm sewer. To remove the existing 12” water line from the storm sewer it will need to be lowered under the storm sewer. It will need to be lowered roughly 5 feet. To remove the existing 15” out of the storm sewer the manholes on both ends will need to be lowered. The existing manholes will be removed, and the new manholes will be roughly 3 feet lower than the existing ones. There will be a new 18” sanitary sewer that is ran from the two new manholes that goes under the existing storm sewer, that is 408 LF. This project will also include attaching all other existing lines to the new manholes. The south manhole will also need a 58 LF of 18” sanitary sewer to be attached to the existing pipe that is to southeast.
The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer.
Bidders are advised to pay close attention to the specific details of the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction.
Specific Notes:
1. Rock Elevation: 781.00’ +/-
2. Remove 12” Water line and 15” Sanitary Sewer from existing 36” Storm Sewer including existing vaults, Reestablish flow in 36” RCP.
FINAL COMPLETION DATE: May 28, 2027
ENGINEER’S ESTIMATE: $ 271,380
| 11/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
68
Item #68 - Copper Sulfate Pentahydrate Liquid - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Liquid for the period January 1, 2025 to December 31, 2025.
| 10/16/2025 06:00 PM UTC |
|
6
Item #6 - Ferrous Chloride- The City of Findlay is accepting proposals for Fluorosilicic Acid for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
|
33
Item #33 - Airport Fuel- The City of Findlay is accepting proposals for Airport Fuel for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
|
6
Item #6 - Ferrous Chloride- The City of Findlay is accepting proposals for Fluorosilicic Acid for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
|
33
Item #33 - Airport Fuel- The City of Findlay is accepting proposals for Airport Fuel for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
|
68
Item #68 - Copper Sulfate Pentahydrate Liquid - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Liquid for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
|
35753100
This project consists of the replacement of the water main in Morrical Boulevard between Bliss Ave. and Lima Ave. and in Lima Avenue between Morrical Blvd. and Byal Ave. The project will include but not be limited to approximately 3,929 LF of 12-inch C900 waterline, 224 LF of 8-inch C900 waterline, 82 LF of 6-inch C900 waterline, 6-inch, 8-inch and 10-inch connections, ten fire hydrants and various fittings. Abandoning of the existing water system including removal of valves and fire hydrants, grading & seeding, maintenance of traffic and asphalt pavement repair, as required, are also included. The existing system must remain in service until the system is complete, including service connections by City forces. Rock excavation will be required. Estimated Cost: $1,194,400
| 09/09/2025 06:00 PM UTC |
|
35751700
Edgehill Waterline Replacement, Project No. 35751700
This Project consists of installing a new 6-inch C909 waterline on Edgehill Road, running in the south side of the roadway, from Northridge Road to Westmoor Road. Once the waterline installation is complete, the south half of Edgehill Road will be resurfaced. This project shall consist of, but not limited to, 1,240 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, hydrant assembly, waterline abandonments, misc. fittings, pavement planning, asphalt resurfacing, curb replacement and seeding and mulching.
This project is funded by City of Findlay Water Fund. Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
Final Completion Date: May 1, 2026
Engineer’s Estimate: $304,543.25
| 08/21/2025 06:00 PM UTC |
|
RFQ Municipal Courtroom Renovations
The proposed Design-Build Project is the renovations of the Municipal Courtrooms in Findlay City Hall. The courtrooms were first constructed in 1984. Renovations include but are not limited to: judges bench area including security, jury box, judicial assistant, flooring, ceiling including acoustical tiles, casework throughout, gallery area, ADA accessibility issues and refinishing of doors and gallery pews. Architectural renderings of all work shall be included for approval prior to construction. There are two courtrooms requiring identical services; however, one courtroom shall remain functional at all times.
| 07/29/2025 06:00 PM UTC |
|
35650800
2025 Annual Sewer Cleaning (Large Diameter)
Project Description
The project shall consist of the cleaning and televising of several aging and deteriorating sanitary sewer lines in the City of Findlay. The primary objective is to provide the City with a good visual inspection of the condition of the sewers. The Base Bid includes several sewer locations in different areas of the City. Some sewer lines are in close proximity of each other while others are somewhat isolated. The sizes to be cleaned include 15-inch, 20-inch, 24-inch, 30-inch, 36-inch, 42-inch, 45-inch, 48-inch, 51-inch and 66-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments. Incidental items include but are not limited to mobilization, bypass pumping, dewatering, traffic control, etc.
Bidders are advised to pay close attention to the specific details in the General Notes and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders should be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project.
Completion Date: October 3, 2025
Engineering Estimate (Base Bid Only): $220,000.00
| 06/24/2025 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.