Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WU0301012 (Previously WO0643012) War Memorial Center Flood Mitigation
Work of the Project includes construction services to decouple the existing sewer connection. A new vault will be installed to house 4 stormwater pumps that will connect to an existing manhole located to the south. Project will include all associated plumbing and electrical work to ensure the new system runs properly.
MANDATORY Pre-Bid Meeting: May 12, 2025 at 10am. 750 N Lincoln Memorial Dr., Milwaukee, WI 53202 Meet at Lower-Level, North Entrance near the security desk.
Questions due: 05/19/2025
Responses due: 06/02/2025
| 06/18/2025 07:00 PM UTC |
WP037201 McKinley Park Flushing Channel
Replacement and rehabilitation of seawall along flushing channel near McKinley Marina. Includes installation of steel sheet piling, fiber reinforced polymer panels, grading, plumbing, electrical, landscaping, custom railing, and concrete seawall walkway.
Optional Pre-Bid Meeting: Wednesday, June 11th, 2025, at 10AM. Meet outside at the Milwaukee Yacht Club Gate, McKinley Park, Milwaukee, WI. This onsite walkthrough and meeting is for contractors to visualize project. This meeting is to explain requirements and ask questions.
| 06/25/2025 07:00 PM UTC |
WP077801 Bender Park Sediment Abatement
Work consists of dredging sediment from the Bender Park boat launch and relocating it within the designated area of Bender Park as indicated in the project bid documents. Additional work consists of dewatering, erosion control, grading, planting, and plant maintenance.
A similar project was bid, though not awarded, in May of 2025. This project differs from that one in that there are alternatives for less dredged volume and a longer timeframe to complete the work.
Pre-Bid Meeting (Optional): Wednesday June 18th, 2025 at 2:00PM. Meeting to be held virtually on Microsoft Teams. Please request an invite to this meeting by emailing Jack Sudar at jack.sudar@milwaukeecountywi.gov
| 07/02/2025 07:00 PM UTC |
WS0149012 Clinton Rose Senior Center Renovation
Work of the project includes predominately interior renovations to the senior center. Scope generally includes demolition of selected existing conditions and construction of new kitchen, computer lab, health rooms, activity rooms, and office space. Finish updates (flooring, walls, cabinetry, ceilings) throughout. HVAC, electrical, and plumbing updates throughout. ADA updates and reconfiguration to restrooms and entryway. The project will also include installing new curb and concrete sidewalk for accessible route from parking lot and other related infrastructure improvements as specified in the bid documents.
Optional Pre-Bid Meeting: June 17th at 10:30 - 11:30am. Meet in person at Clinton Rose Senior Center, 3045 N Dr Martin Luther King Jr Dr Milwaukee.
| 07/02/2025 07:00 PM UTC |
Number | Deadline |
---|---|
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 05A Structural Steel & Misc. Metals
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 04A Masonry
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03C Artificial Rockwork & Theming
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03B Precast
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 03A Concrete
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 02A Demolition
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0160: Milwaukee County Zoo Admin Building Roof Replacement
Replacement of approximately 11,070 Square Feet of the Administration Building Roof.
Non-Mandatory Pre-Bid Meeting: Wednesday, March 13th from 9:00 – 10:00 AM at the Milwaukee County Zoo’s Administration Building.
| 04/03/2024 07:00 PM UTC |
WA0295 (Expansion Joint Replacement), WA0411 (Traffic Bearing Membrane/Sealer), WA0432 (Post Tensioned Anchorages)
This project includes the repair or replacement of existing expansion joints, concrete column repairs, beam repairs, concrete crack repair, post tensioned concrete repair work, concrete membrane/sealer placement, post tensioned anchorage waterproofing repair/inspection/sealing at the MKE Airport Parking Structure. WA0295 Expansion Joint Replacement includes one Base Bid and Two Alternates. WA0411 Traffic Bearing Membrane includes a Base Bid and Three Alternates. WA0432 Post Tensioned Anchorages includes one Base Bid and One Alternate.
Project Completion:
If the Base Bids and any of the six (6) alternatives are awarded, the contractor shall have a total of 194 consecutive calendar days to substantially complete the project, excluding punch list. If any or all additive alternatives are not awarded, the total contract time shall be as follows:
Base Bids Only = 140 Calendar Days.
Pre-Bid Meeting: Wednesday March 20th, 2024 at 8:30AM., held in the Sijan Conference Room, in the GMIA Terminal (Located before security in hallway behind Museum / USO), 5300 South Howell Avenue, Milwaukee, Wisconsin.
| 04/03/2024 07:00 PM UTC |
WP0706 - South Shore Breakwater North Section - Phase 2
Contract Description: Work consists of constructing a temporary access, to relocate existing armor stones as needed to provide suitable base for new armor stones and to supply new armor stone to specified elevations and provide a smooth transition between new armor stones and existing stones on the breakwater.
Optional Pre-Bid Meeting: March 20, 2024, 11:00 AM, meet at the South Shore Yacht Club
| 04/03/2024 07:00 PM UTC |
WY012305: Parks Golf Course Irrigation and Golf Cart Construction - Whitnall Golf Course Well Pump Station
Whitnall Park Pump Station project proposes to furnish and install a new pump station to service the Whitnall Park Golf Course Irrigation System. The pump will be installed in the existing pumphouse. In addition, the contractor will also be responsible for furnishing and installing the proposed 12" water main to connect with an existing 8" main using appropriate connections and thrust blocking, in accordance with the plans and specifications. After construction, the contractor shall be responsible to provide restoration to improvement and access areas damaged during the project’s installation.
Pre-Bid Meeting: March 13th, 2024, at 11:00am. Meet via Microsoft Teams. Meeting link available in Bid Advertisement
| 03/29/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.