Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WU0301012 (Previously WO0643012) War Memorial Center Flood Mitigation
Work of the Project includes construction services to decouple the existing sewer connection. A new vault will be installed to house 4 stormwater pumps that will connect to an existing manhole located to the south. Project will include all associated plumbing and electrical work to ensure the new system runs properly.
MANDATORY Pre-Bid Meeting: May 12, 2025 at 10am. 750 N Lincoln Memorial Dr., Milwaukee, WI 53202 Meet at Lower-Level, North Entrance near the security desk.
Questions due: 05/19/2025
Responses due: 06/02/2025
| 06/11/2025 07:00 PM UTC |
Number | Deadline |
---|---|
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 09D Acoustical Ceilings
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 09C Tiling
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 09B Resinous Flooring
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 09A Interior Studs & Drywall
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 08C Glass & Glazing
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 08B Overhead Coiling Doors
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 08A Animal Caging & Containment Doors
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 07B Fireproofing
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 07A Roofing
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
WZ0141 Milwaukee County Zoo - Adventure Africa Phase III - Rhino Exhibit - BP 06A Carpentry & Specialties
Renovation and expansion of 50,000 SF in the existing 1950’s Pachyderm Complex located at the heart of the Adventure Africa experience. This project will consist of a full renovation of 10 holdings stalls while combining the two separate buildings with a new enclosed viewing barn featuring flexible interior/exterior yard space to shift rhinos, hippos, and hoofstock.
Non-Mandatory Pre-Bid Meeting: March 7th from 11am – 12:30pm.
Enter through the Zoofari Contractor Entrance.
Meet in the Flamingo Room located in the Administration Building.
DEADLINES:
RFIs Due: March 14th, send to jstenz@gilbaneco.com
RFI Round 2 Due: March 28th, send to jstenz@gilbaneco.com
Milwaukee County Contractor Pre-Qualification: Before March 22nd
Final Addendum: April 2nd
After bid review, bid award to be posted on Milwaukee County website: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs/Active/WZ0141-Milwaukee-County-Zoo---Adventure-Africa-Phase-III---Rhino-Exhibit
| 04/05/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.