General Info

Business Logo

Milwaukee County

633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4953

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WY045606 Milwaukee County Department of Health & Human Services New Administration Building Bid Package #3 - Site and Parking Lots
Milwaukee County Department of Health & Human Services New Administration Building Bid Package #3 - Site and Parking Lots. PreBid Meeting: Rescheduled, now Tuesday, June 11 at 9:00 a.m at Coggs Building, Conference Room 104.
06/27/2024 07:00 PM UTC
WY012306 Parkway Drive Conversion to Bicycle & Pedestrian Trail
Milwaukee County will be converting existing Asphalt Roadways within the Lincoln Creek Parkway (from N.23rd Street to N.27th Street) and Little Menomonee River Parkway (From Appleton Avenue to Leon Terrace) to a pedestrian pathway/trail. Existing asphalt and concrete pavement, concrete curb and gutter, will be removed and replaced with a 10-foot-wide asphalt path with gravel shoulders. Proposed storm sewer culverts, structures, and piping will be installed at low points. Existing storm structures will remain with minor adjustments. Landscaping trees, turf grass restoration, bollards, stone barriers, pedestrian and bicycle trail signage will be installed as part of the project. Traffic control will be required at project locations. Pre Bid Meeting June 18, at 2:00 p.m. via Microsoft Teams - see advertisement for link
07/10/2024 07:00 PM UTC
C217-20206 Milwaukee County Courthouse Phase 3 Facade Repair
Courthouse Limestone Façade Repair – phase 3 encompasses the following base-bid work: Area of Work 1: East Elevation Complete façade repairs as shown on sheets A202-A204 and as designated during inspections by consultant/owner. Area of Work 2: (Low) East Entrances Rebuild/replace stone at East building Entrances. Refer to sheets A203 and A301. Area of Work 3: South Elevation Complete façade repairs as shown on sheet A205 and as designated during inspections by consultant/owner. Replace built-in copper gutter at sixth-floor cornice. Refer to sheet A205. Refer to photo no. 1 on sheet A501. Deductive Alternate No. 1: Deduction to base bid all associated costs included in Area of Work 2. Alternate A: East and South Elevation Cleaning Clean East and South Elevations 100% below fourth floor water table. Alternate B: 100% Façade Cleaning Clean 100% of the Limestone Facades at all Elevations. MANDATORY Pre-Bid Meeting June 21st, 2024, at 11:00 AM.- This will be a Virtual Teams Meeting – See Bid Documents for Meeting Link information. OPTIONAL Site Visit Tour June 24th, 2024 at 10:00 AM. Tour information available on Addendum One.
07/10/2024 09:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP1 (Demolition)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP2 (New Concourse E)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP3 (Fueling)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP4 (Boarding Bridges)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WO517-16436 -WAR MEMORIAL CENTER LOWER-LEVEL RESTROOMS
Contract Description: Demolition of existing restrooms and south doors, construction of new restrooms, locker room, storage area and entry. Pre-Bid Meeting: July 1, 2024, at 9am. Meet at the Lower Level, North entry, in the lobby in front of the help desk.
08/02/2024 09:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
T078-20074 MCTS KK Garage Bus Storage Building Roof Replacement
Contract 1: Roof Replacement Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
02/23/2022 08:00 PM UTC
T149- 20219 Fond du Lac Transportation Building Roof Replacement (Extended)
Contract 1: Roof Replacement Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
02/17/2022 08:00 PM UTC
T128-20218 KK Bus Garage Employee Parking Lot
Contract 1: Parking Lot Repavement Work of the Project includes milling the existing pavement, re-grading, and providing new asphalt pavement. Also includes chain-link fence and beam guard replacement as indicated in the project Bid documents .
02/16/2022 08:00 PM UTC
T149- 20219 Fond du Lac Transportation Building Roof Replacement
Contract 1: Roof Replacement Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
02/16/2022 07:00 PM UTC
P698-19613 Greenfield Park Oak Leaf Trail
Work of the Project consists of removing existing asphalt surface and providing new asphalt surface, culvert pipe and trail signs as indicated in the project Bid documents.
02/10/2022 08:00 PM UTC
O117-20066 Marcus Center for the Performing Arts Roof Replacement
Project consists of replacing existing Performing Arts Center Roof as indicated on Contract bidding documents.
02/09/2022 08:00 PM UTC
O189-20161 Countywide ADA Repairs - Phase 3, Courthouse
The project includes remodeling one men’s and one women’s restroom on one floor of the courthouse to create accessible restrooms on a floor that currently offers no accessible restrooms. This project will focus on renovating one existing men’s restroom and one existing women’s restroom on the Ground Floor of the Courthouse. An additional area shall be renovated on the Ground Floor of the Courthouse, adjacent to the women’s restroom, creating a family restroom. This family, or universal, restroom is to be a unisex restroom that is handicap accessible i.e., a separate facility which accommodates changing a baby, breastfeeding, and parents attending children of the opposite sex. Within this family restroom an adult size changing table shall be located. The adult changing table can raise and lower as needed by the user and/or caregiver.
02/09/2022 08:00 PM UTC
T141-20169 KK Bus Wash HVAC Replacement
Remove air Curtains, MUA unit and exhaust fans and install a new gas fired MUA unit, 2 new exhaust fans along with 2 new toilet exhaust fans
12/15/2021 08:00 PM UTC
V054-21204 -01 Sanitary Sewer Rehabilitation at Multiple Locations
Contract 1: Clean & CCTV Sewer Lines Work consists of furnishing all labor, materials, supplies, equipment, tools and other services necessary for providing the rehabilitation of sanitary sewer manholes and pipes, televising and cleaning of pipes, and abandonment of manholes and pipes as specified. Contractor shall perform this Work at multiple Milwaukee County locations including the County Grounds, Zoo, Parks, Airport, and House of Corrections. All Work shall be in accordance with Contract Drawings and Specifications. Pre-Bid Meeting: December 1ST, 2021 at 10:00am, meet at Milwaukee County, Architecture, Engineering, and Environmental Services Office, 633 West Wisconsin Avenue, Suite 1000, Milwaukee, WI 53203. Meetings will be conducted in small groups. Masks, Health Screenings, and Social Distancing are required.
12/08/2021 08:00 PM UTC
V054-21204 -02 Sanitary Sewer Rehabilitation at Multiple Locations
Contract 2: Sewer Manholes & Pipe Rehabilitation Work consists of furnishing all labor, materials, supplies, equipment, tools and other services necessary for providing the rehabilitation of sanitary sewer manholes and pipes, televising and cleaning of pipes, and abandonment of manholes and pipes as specified. Contractor shall perform this Work at multiple Milwaukee County locations including the County Grounds, Zoo, Parks, Airport, and House of Corrections. All Work shall be in accordance with Contract Drawings and Specifications. Pre-Bid Meeting: December 1ST, 2021 at 10:00am, meet at Milwaukee County, Architecture, Engineering, and Environmental Services Office, 633 West Wisconsin Avenue, Suite 1000, Milwaukee, WI 53203. Meetings will be conducted in small groups. Masks, Health Screenings, and Social Distancing are required.
12/08/2021 08:00 PM UTC
121 - 130 of 255 Solicitations
1 2 9 10 11 13 15 16 17 25 26