General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana Project No. 2024-746 Capital Project No. 3502 Kirby and Hodges Street Sidewalk Repairs The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
07/01/2025 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Project No. CP 3271
Project No. CP 3271 Country Club Water Looping - Weaver Road to Jensen Lane City of Lake Charles, LA ~ The work for this project includes, but not limited to, installation of approximately 1,550 feet of 12 inch water main on Country Club Road. The proposed waterline will connect the existing 12 inch water main that terminates near the hydrant at 2099 Country Club Road to the existing 12 inch water main that runs along the west side of Weaver Road.
12/17/2019 08:45 PM UTC
Capital Project Number CP3295
City of Lake Charles, Louisiana Southwest Water Treatment Plant New Ground Storage Tank #2 Capital Project Number CP3295 I. Scope of Services: The City of Lake Charles desires to replace the existing 3.0 MG steel at the Southwest Water Treatment Plant which is being demolished due to structural failures. In place the existing 3.0 MG GST the City would like to construct a new 2.0 MG concrete ground storage tank to expand the finished water capacity available on site. This Work will include but is not limited to the following: 1. Demolition of the remaining concrete ring wall foundation 2. Excavation of existing subgrade and installation of select fill or granular materials in as defined by the geotechnical investigation. 3. Construction of a new 2.0 MG AWWA D110 Type III concrete ground storage tank. 4. Installation of fill and draw piping to and from the ground storage tank 5. Installation of a remote level indicator and associated instrumentation and controls for tank monitoring and plant control. 6. Miscellaneous site and drainage improvements to accommodate the construction of the new tank.
12/17/2019 08:45 PM UTC
Project No. CP3300
City of Lake Charles, Louisiana 2018 Sidewalk Construction CP 3300 The work for this project includes, but not limited to, installation of a five-foot (5’) sidewalk along the south side of Sale Road between Lake Street and Ryan Street along the existing curb and installation of a six-foot (6’) sidewalk along the south side of Lisle Peters Road between E. St. Charles Avenue and Big Lake Road (LA 384). It also includes the installation of subsurface drainage systems along Lisle Peters Road and the removal and installation of driveways impacted by sidewalk placement.
11/19/2019 08:45 PM UTC
Project No. 2019-691 Capital Project No. 3072
City of Lake Charles, Louisiana Project No. 2019-691 Capital Project No. 3072 Riverside Park Boat Dock Rehabilitation The general scope of work includes: 1. Removal of existing wooden pier including a portion of existing concrete sidewalk. 2. Installation of new fixed pier and connecting concrete sidewalk. 3. Installation of new gangway, floating concrete dock assembly, and pipe piles.
11/05/2019 08:45 PM UTC
Project No. OP 7306 - Fire Station No. 1
City of Lake Charles, Louisiana Fire Station No. 1 Repairs OP 7306 Demolition of the East end of the existing fire station project, to include relocation of existing technology equipment; removal of existing radio tower, antenna, and communication equipment; asbestos abatement; removal of existing foundation and designated concrete paving; patching of the roof and walls of existing building at connections where the building is removed; fencing, grading, and site work following demo to finish the area of work.
11/05/2019 08:45 PM UTC
Project CP3264
INTERSTATE CORRIDOR BEAUTIFICATION PHASE III CAPITAL PROJECT NO. 3264 INTERSTATE 210 / HWY. 14 - LaDOTD PERMIT 153883 SCOPE OF WORK The general scope of work for Project Interstate Corridor Beautification Phase III, Capital Project No. 3264, for LaDOTD Permitted Project No. 153883 for construction includes the following. Base bid of planting of selective trees, shrubs and performing one (1) maintenance operations per plans and specification for a 90 calendar day construction period.
10/15/2019 07:45 PM UTC
Project #OP7306
City of Lake Charles, Louisiana Fire Station #3 Remodel Days to Complete Project – 180 Days Liquidated Damages - $270 Per Calendar Day Plans – No Charge The project scope consists of the replacement of finishes throughout the existing fire station. New flooring, painted sheetrock walls, tiles showers, doors & frames, suspended grid ceilings, millwork, and a HVAC system will be provided.
10/15/2019 07:45 PM UTC
Capital Project #CP9778
City of Lake Charles, Louisiana Arcade Amphitheater LED Lighting and Power Improvements Capital Project Number CP #9788 Lake Charles Civic Center Amphitheater Enhancements (LED Lighting & Power Improvements) ADG #18355-A The scope of work for the above mentioned project is as follows: a) Provide 2-200 Amp 3 phase power sources for Amphitheater “show power”. b) Provide 4 new vendor power pedestals (one each near 4 existing in-ground power boxes). c) Provide new area lighting as the West End of Millennium Park is lacking illumination. Remove HID Fixtures and poles. All new lighting to be LED.
10/15/2019 07:45 PM UTC
CP3343
City of Lake Charles, Louisiana 2019 Lift Station Rehabilitation CP3343 The project scope of work shall consist of the following: 1. Brentwood • Replace pumps. • Replace valves and valve vault. Add bypass connection. • Replace wet well top slab. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Fence station. Pour concrete inside fence. 2. Third & McNabb • Replace pumps. • Replace valves and valve vault. Add bypass connection. • Replace wet well access hatch. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Add bollards to protect new electrical rack. • Fence station. Pour concrete inside fence. 3. Fitzenreiter. • Replace pumps. • Replace valves. Add bypass connection. • Replace wet well access hatch. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Extend aggregate driveway to new station fence. • Fence station. Pour concrete inside fence. • Add slope protection around station.
10/15/2019 07:45 PM UTC
Project No. 2019-692 Capital Project No. 3177
City of Lake Charles, Louisiana Project No. 2019-692 Capital Project No. 3177 W. Prien Lake Road Widening (Cove Lane to Ihles Road) Clearing and Grubbing The general scope of work for Project No. 2019-692, W. Prien Lake Widening Cove Lane to Ihles Road – Clearing and Grubbing Phase, is defined as follows: • The clearing of trees and shrubs located within the existing or newly acquired servitudes and road rights of way located along W. Prien Lake Road between Cove Lane and Ihles Rd and also along Sale Rd from W. Prien Lake to Burton Lane. • The demolition of the five (5) homes located at 2804 Henderson Forest Lane, 2803 & 2804 S. Locke Point Drive, and 2801 & 2802 N. Locke Point Drive. As well as the associated removal of driveways, sidewalks, pools, sheds, fencing, etc required to completely clear the lots. All of the work identified above is being done in anticipation of the project to relocate utilities and reconstruct and widen W. Prien Lake Road and Sale Road within the same area.
09/17/2019 07:45 PM UTC
221 - 230 of 378 Solicitations
1 2 19 20 21 23 25 26 27 37 38