General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana Project No. 2024-746 Capital Project No. 3502 Kirby and Hodges Street Sidewalk Repairs The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
07/01/2025 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Project No. 2018-683 Capital Project No. 3315
City of Lake Charles, Louisiana Project No. 2018-683 Capital Project No. 3315 Broadmoor Terrace Drainage Improvements Broadmoor to 9th Avenue The general scope for Project No. 2018-683, Broadmoor Terrace Drainage Improvements - Broadmoor to 9th Avenue, is the Installation of a storm collection system from the Southeast corner of East Broadmoor Drive Easterly to the Ninth Avenue storm drainage system. The work involves 18 and 15 inch diameter storm drainage pipe, drainage inlets, roadway pavement, and sidewalk removal and replacement, including utility and fence adjustments as needed.
08/20/2019 07:45 PM UTC
Project No. 2019-690 Capital Project No. 3335
PROJECT NO. 2019-690 CAPITAL PROJECT NO. 3335 KIRKMAN STREET DRAINAGE REHABILITATION CITY OF LAKE CHARLES, LA SCOPE OF WORK The general scope of work for Project No. 2019-690 includes the replacement of the existing drainage line on the East side of Kirkman Street from Pine Street North to Pryce Street. This existing line is undersized and in poor condition. It will be replaced with new 18” diameter RCP and catch basins. The scope of work also includes the replacement of the sidewalk on the East side of Kirkman and the associated street pavement work.
08/20/2019 07:45 PM UTC
Project No. 2019-688 Capital Project No. 3334
City of Lake Charles, Louisiana Project No. 2019-688 Capital Project No. 3334 Henderson Bayou Bridge Rehabilitation The general scope of work includes the installation of grout-filled encasement jackets around timber piles, pile bent bracing replacement, and spall repairs on the concrete bridge structure.
08/06/2019 07:45 PM UTC
Capital Project No. CP3313
City of Lake Charles, Louisiana Shattuck Street Bridge Lake Charles City Capital Project No. CP 3313 Project scope consists of lifting the ends of six 62 foot long Type III girders at the expansion joints (bents 7, 11, 12, 15, 18, and 21) to remove the existing bearing pads and replace them with new bearing pads. Each Type III girder will be lifted at one expansion joint at a time using ten (10) Enerpac RAC-502 (or equivalent) 50 ton hydraulic jacks.
08/06/2019 07:45 PM UTC
Project No. 2019-689 Capital Project No. 3024
City of Lake Charles, Louisiana Project No. 2019-689 Capital Project No. 3024 Russell Street Bridge Rehabilitation ~ The general scope of work for Project No. 2019-689, Capital Project No. 2968, Russell Street Bridge Piling Rehabilitation, includes the following: (a) Bridge piling rehabilitation with grout-filled jackets; (b) Bridge piling rehabilitation with new pile splices with galvanized channel bracing; (c) Spall repair on underside of concrete bridge structure; (d) Sway bracing removal and placement; (e) Erecting and maintaining signage and barricades for detour routing; (f) Approach slab removal and replacement.
07/16/2019 07:45 PM UTC
Project No. 2019-687 Capital Project No. 3332
City of Lake Charles, Louisiana Project No. 2019-687 Capital Project No. 3332 Port Wonder Utilities Extension The general scope of work includes the extension of a 12” diameter water main from the Northwest corner of the Old Harrah’s Parking Garage Tract West approximately 630 feet to the East property line of the City of Lake Charles Alligator Pond Tract, including fire hydrant assemblies and service connection points for the future Port Wonder Development, and the extension of a 10” diameter sewer main from the Northeast corner of the Old Harrah’s asphalt parking lot West approximately 1100 feet, including manholes. Pavement removed at the Port Wonder site will not be replaced. Pavement removed at the Old Harrah’s site will be replaced.
06/18/2019 07:45 PM UTC
CP 3303
City of Lake Charles, LA New Transit Bus Storage Facility CP 3303 The project consists of the new construction of a 7500 square foot pre-engineered metal canopy building and associated site improvements. The contract duration is 180 days with liquidated assessed at a rate of $270.00 dollars per calendar a day.
06/04/2019 07:45 PM UTC
CP3297
City of Lake Charles, Louisiana WWTP A BASIN A-03 REHABILITATION PROJECT CP3297 I. Scope of Services: A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-03. The Work includes, but is not necessarily limited to, the following: 1. Pipe bursting 8080 linear feet of existing 8” and 10” sewer to new 8” and 10”. 2. 30 point repairs to 8” sewer pipe at varying depths 0-12’. 3. 70’ of open cut replacement, 4 point repairs to 18” sewer pipe. 4. Replacement of approximately 132 active sewer service laterals. 5. Coating approximately 350 vertical feet of existing and new manholes. 6. Furnish and Install 3 new manholes.
05/14/2019 07:45 PM UTC
Project No. 2018-680 Capital Project No. 3252
City of Lake Charles, Louisiana Project No. 2018-680 Capital Project No. 3252 2018 CDBG South Roosevelt Drainage Improvements Phase Two ~ The general scope of work for Project No. 2018-680 includes installation of reinforced concrete pipe and catch basins for drainage improvements and pavement work.
04/30/2019 07:45 PM UTC
MAI Project No. B6-18063-DA, CP# 3312
City of Lake Charles, Louisiana 2017 CDBG Infrastructure – Asphalt Overlay of Various Streets MAI Project No. B6-18063-DA Capital Project No. CP3312
04/16/2019 07:45 PM UTC
231 - 240 of 378 Solicitations
1 2 20 21 22 24 26 27 28 37 38