General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
DR002
City of Lake Charles, Louisiana Lake Charles Public Works New Facility Phase 2 DR002 Scope of Project Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
02/16/2026 08:45 PM UTC
LCR 401
City of Lake Charles, Louisiana Lock Park Inclusive Playground LCR 401 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to: PROJECT SUMMARY: • The scope of work that is considered base bid includes: o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking; o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees; o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system. • The scope of work that is considered alternates includes: o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle. o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
02/16/2026 08:45 PM UTC
2026-12
Millennium Park Fall Surface Replacement In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center. All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
03/03/2026 08:45 PM UTC
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749 CAPITAL PROJECT NO. 3309 HAM REID ROAD WATERLINE EXTENSION- ELLIOTT RD. TO BIG LAKE RD. CITY OF LAKE CHARLES, LA SCOPE OF WORK: The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
03/03/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
MAI Project No. B6-18063-DA, CP# 3312
City of Lake Charles, Louisiana 2017 CDBG Infrastructure – Asphalt Overlay of Various Streets MAI Project No. B6-18063-DA Capital Project No. CP3312
04/16/2019 07:45 PM UTC
Project No. 2018-682 Capital Project No. 3283
PROJECT NO. 2018-682 CAPITAL PROJECT NO. 3283 LEGENDRE STREET DRAINAGE PH II CITY OF LAKE CHARLES, LOUISIANA SCOPE OF WORK Project No. 2018-682 includes installation of approximately 470 linear feet of 8x7 box culvert on the East roadside ditch of Legendre Street starting at the downstream end near the Cell tower driveway and extending South tying into the existing box culvert at McNeese Street.
04/16/2019 07:45 PM UTC
Project No. 2019-684, Capital Project No. 3093
City of Lake Charles, Louisiana Project No. 2019-684 Capital Project No. 3093 Maidstone and Woodside Drive Drainage Pipe Rehabilitation The goal of this project is to rehabilitate existing reinforced concrete drain lines on Woodside Drive and Maidstone Drive in the City of Lake Charles, LA with cured-in-place pipe lining.
02/05/2019 08:45 PM UTC
Project No. 2018-672, Capital Project No. 3308
City of Lake Charles, Louisiana Project No. 2018-672 (Capital Project No. 3308) Streetscape – Mill and Division The goal of this project is to enhance pedestrian safety and beautify Mill and Division Streets along the new ERDACE Development from Ryan Street to Ann Street. This will be accomplished by the reconstruction of the sidewalks to include pavers. The scope of work shall also include overhead decorative lamp posts, litter receptacles, drainage and pavement markings.
01/15/2019 08:45 PM UTC
Project No. CP3304
City of Lake Charles, Louisiana College Oaks Park New Restroom Bldg. 3518 Ernest Street, Lake Charles, LA Capital Project Number CP 3304 Scope of Work: Provide a new restroom building at the existing developed park. The new building to be CMU Black walls with wood truss roof system and shingled roofing.
12/18/2018 08:45 PM UTC
CP 3264
City of Lake Charles, Louisiana INTERSTATE CORRIDOR BEAUTIFICATION PHASE II LaDoTD Permit No. 153754 Capital Project Number CP3264 The general scope of work for Project Interstate Corridor Beautification Phase II, Capital Project No. 3264, for LaDOTD Permitted Project No. 153754 for construction includes the following. Base bid of clearing and grubbing of selective trees, planting of trees, and shrubs. Add alternate no. 1 of maintenance operations of selective areas within the interchange by way mowing grass, weed control, volunteer vegetation growth removal, mulching for one year period. See ‘Exhibit A’ identifying the selective areas for maintenance operations.
11/20/2018 08:45 PM UTC
Project No. 2018-678 (PR0002)
City of Lake Charles, Louisiana Project No. 2018-678 (PR0002) North Beach Improvements - Erosion Repair North Beach to Promenade The scope of work includes revetment and shore erosion repair, drainage and piping installation, sidewalk repair, and gutter paving.
11/06/2018 08:45 PM UTC
Project No. CP3051, LEI Project No. 18-010
City of Lake Charles, Louisiana 2018 City Wide Striping Project City of Lake Charles Project No. CP3051 LEI Project No. 18-010 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. General Doolittle Street (Highway 14 to General Twinning Street) 2. Holly Hill Road (Chrysler Street to Sale Road) 3. 1st Avenue (Prien Lake Road to Broad Street) 4. 2nd Avenue (Prien Lake Road to Broad Street) 5. 3rd Avenue (Prien Lake Road to Broad Street) 6. 4th Avenue (Prien Lake Road to Broad Street) 7. 6th Avenue (12th Street to 6th Street) 8. 6th Street (4th Avenue to Highway 14) 9. 7th Avenue (Prien Lake Road to 12th Street) 10. Common Street (McNeese Street to Sale Road) 11. Lake Street (Prien Lake Road to Shell Beach Drive) 12. Lake Street (McNeese Street to Sale Road) 13. Louisiana Avenue (Mill Street to 6th Street) 14. North Goos Boulevard (Opelousas Street to Knapp Street) 15. Sallier Street (Lake Street to Hodges Street) 16. 14th Street (Highway 14 to 4th Avenue) 17. School Street (Louisiana Avenue to Lake Street) 18. Power Center Parkway (Highway 14 to 5th Avenue) 19. Pine Street (Lakeshore Drive to Hodges Street) 20. Pryce Street (Lakeshore Drive to Enterprise Boulevard) 21. South Division Street (Kirkman Street to Enterprise Boulevard) 22. Enterprise Parkway (Interstate 10 to Katherine Street) 23. Bord du Lac Drive (Lakeshore Drive to North Lakeshore Drive) 24. 5th Avenue (570 linear feet at new bridge) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
11/06/2018 08:45 PM UTC
Capital Project Number CP3256
City of Lake Charles, Louisiana Comeaux Street Drainage Improvements and Overlay Project North Grace Street to Dead End Capital Project Number CP3256 ~ I. Scope of Services: The City of Lake Charles desires to construct a closed drainage system and perform an asphalt overlay of Comeaux Street consisting of the following: • Installing 15”, 18” and 24” RCP culverts in existing ditches; • Constructing drop inlets as shown on plans; • Installing a 2 ½“asphalt overlay and other incidentals as required.
10/16/2018 07:45 PM UTC
Capital Project No. CP#3298
CITY OF LAKE CHARLES, LOUISIANA Common St. and Legion Street Lift St. Rehabilitation Capital Project No. CP#3298 ~ I. Scope of Services: A. Common St. 1. Replace the two existing pumps with new dry pit submersible pumps. 2. Replace all discharge piping and valves. 3. Demolish existing wooden fence and replace with green slatted hurricane fence. 4. Electrical improvements. 5. Coat wet well. B. Legion 1. Replace the two existing pumps with new submersible pumps on a rail system. 2. Replace all discharge piping and valves. 3. Demolish existing top deck and replace with new reinforced concrete top deck with access hatch. 4. Demolish existing hurricane fence and replace with green slatted hurricane fence. 5. Electrical improvements. 6. Coat wet well.
10/16/2018 07:45 PM UTC
251 - 260 of 389 Solicitations
1 2 22 23 24 26 28 29 30 38 39