General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Capital Project No. CP3051
City of Lake Charles, Louisiana 2025 Citywide Striping Package Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3051 LEI Project No. 26-006 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. Southpark Road (McNeese Street to Smith Road) 2. 6th Avenue (12th Street to Broad Street) 3. Hodges Street (Alamo Street to Belden Street) 4. Bilbo Street (S. Railroad Avenue to Clarence Street) 5. Lake Street (Shell Beach Drive to Prien Lake Road) 6. Opelousas Street (Enterprise Boulevard to Highway 171) 7. Fitzenreiter Road (Riverside Park to Highway 171) 8. North Goos Boulevard (Knapp Street to Opelousas Street) 9. Medora Street (Simmons Street to Highway 171) 10. Shattuck Street (Broad Street to Moeling Street) 11. 18th Street (Lake Street to Ryan Street) 12. Enterprise Parkway (Interstate 10 to Katherine Street) 13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road) 14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road) 15. Enterprise Boulevard (12th Street to Prien Lake Road) 16. Broad Street (Lakeshore Drive to Enterprise Boulevard) 17. Moeling Street (Enterprise Boulevard to Highway 171) 18. 6th Street (4th Avenue to Highway 14) 19. Mill Street (Lakeshore Drive to Highway 14) 20. Common Street (McNeese Street to Prien Lake Road) 21. Lake Street (Prien Lake Road to McNeese Street) 22. Kirkman Street (Jackson Street to McNeese Street) 23. Alamo Street (Ryan Street to Enterprise Boulevard) 24. Oak Park Boulevard (Enterprise Boulevard to Highway 14) 25. 12th Street (Highway 14 to Hodges Street) 26. Sallier Street (Lake Street to Hodges Street) 27. Ernest Street (Sale Road to Sallier Street) 28. Jefferson Drive (University Drive to University Drive) 29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road) 30. General Doolittle Avenue (Highway 14 to General Twining Street) 31. Alvin Street (Sallier Street to Shell Beach Drive) 32. 18th Street (Enterprise Boulevard to Highway 14) 33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive) 34. Russell Street (12th Street to Hillcrest Drive) 35. Hillcrest Drive (Highway 14 to Russell Street) 36. N. Prater Street (Knapp Street to Fitzenreiter Road) 37. Pear Street (Knapp Street to Fitzenreiter Road) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
11/17/2026 08:45 PM UTC
2027-04
Maintenance of City of Lake Charles Customer-Owned Lighting
11/17/2026 08:45 PM UTC
Capital Project Number CP3453
CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3453 HMGP PROJECT NUMBER DR-4559-0043 I. Scope of Services: Contractor shall complete Work as specified and indicated in the Contract Documents for Lift Station Back-Up Power Improvements (Capital Project No. CP3453). This Work includes, but is not limited to, the following: • Install of Automatic Transfer Switches & Stand-By Diesel Generators at Lift Stations. • Miscellaneous Work including civil, mechanical, structural, & electrical components required to fully execute the Work.
11/17/2026 08:45 PM UTC
Capital Project No. 3508
City of Lake Charles, Louisiana Project No. 2024-745 Capital Project No. 3508 Riverside Park Shoreline Protection – Phase One The general scope of work for this project includes the restoration and protection of approximately 250 linear feet of shoreline near the entrance of Riverside Park. This restorative work includes placement of stone revetment to rebuild the riverbank, repair/replacement of existing decorative black fence compromised from erosion, and installation of approximately 100 linear feet of steel sheet pile for bank protection near the gate entrance.
11/17/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Project No. CP 3271
Project No. CP 3271 Country Club Water Looping - Weaver Road to Jensen Lane City of Lake Charles, LA ~ The work for this project includes, but not limited to, installation of approximately 1,550 feet of 12 inch water main on Country Club Road. The proposed waterline will connect the existing 12 inch water main that terminates near the hydrant at 2099 Country Club Road to the existing 12 inch water main that runs along the west side of Weaver Road.
12/17/2019 08:45 PM UTC
Capital Project Number CP3295
City of Lake Charles, Louisiana Southwest Water Treatment Plant New Ground Storage Tank #2 Capital Project Number CP3295 I. Scope of Services: The City of Lake Charles desires to replace the existing 3.0 MG steel at the Southwest Water Treatment Plant which is being demolished due to structural failures. In place the existing 3.0 MG GST the City would like to construct a new 2.0 MG concrete ground storage tank to expand the finished water capacity available on site. This Work will include but is not limited to the following: 1. Demolition of the remaining concrete ring wall foundation 2. Excavation of existing subgrade and installation of select fill or granular materials in as defined by the geotechnical investigation. 3. Construction of a new 2.0 MG AWWA D110 Type III concrete ground storage tank. 4. Installation of fill and draw piping to and from the ground storage tank 5. Installation of a remote level indicator and associated instrumentation and controls for tank monitoring and plant control. 6. Miscellaneous site and drainage improvements to accommodate the construction of the new tank.
12/17/2019 08:45 PM UTC
Project No. CP3300
City of Lake Charles, Louisiana 2018 Sidewalk Construction CP 3300 The work for this project includes, but not limited to, installation of a five-foot (5’) sidewalk along the south side of Sale Road between Lake Street and Ryan Street along the existing curb and installation of a six-foot (6’) sidewalk along the south side of Lisle Peters Road between E. St. Charles Avenue and Big Lake Road (LA 384). It also includes the installation of subsurface drainage systems along Lisle Peters Road and the removal and installation of driveways impacted by sidewalk placement.
11/19/2019 08:45 PM UTC
Project No. 2019-691 Capital Project No. 3072
City of Lake Charles, Louisiana Project No. 2019-691 Capital Project No. 3072 Riverside Park Boat Dock Rehabilitation The general scope of work includes: 1. Removal of existing wooden pier including a portion of existing concrete sidewalk. 2. Installation of new fixed pier and connecting concrete sidewalk. 3. Installation of new gangway, floating concrete dock assembly, and pipe piles.
11/05/2019 08:45 PM UTC
Project No. OP 7306 - Fire Station No. 1
City of Lake Charles, Louisiana Fire Station No. 1 Repairs OP 7306 Demolition of the East end of the existing fire station project, to include relocation of existing technology equipment; removal of existing radio tower, antenna, and communication equipment; asbestos abatement; removal of existing foundation and designated concrete paving; patching of the roof and walls of existing building at connections where the building is removed; fencing, grading, and site work following demo to finish the area of work.
11/05/2019 08:45 PM UTC
Project CP3264
INTERSTATE CORRIDOR BEAUTIFICATION PHASE III CAPITAL PROJECT NO. 3264 INTERSTATE 210 / HWY. 14 - LaDOTD PERMIT 153883 SCOPE OF WORK The general scope of work for Project Interstate Corridor Beautification Phase III, Capital Project No. 3264, for LaDOTD Permitted Project No. 153883 for construction includes the following. Base bid of planting of selective trees, shrubs and performing one (1) maintenance operations per plans and specification for a 90 calendar day construction period.
10/15/2019 07:45 PM UTC
Project #OP7306
City of Lake Charles, Louisiana Fire Station #3 Remodel Days to Complete Project – 180 Days Liquidated Damages - $270 Per Calendar Day Plans – No Charge The project scope consists of the replacement of finishes throughout the existing fire station. New flooring, painted sheetrock walls, tiles showers, doors & frames, suspended grid ceilings, millwork, and a HVAC system will be provided.
10/15/2019 07:45 PM UTC
Capital Project #CP9778
City of Lake Charles, Louisiana Arcade Amphitheater LED Lighting and Power Improvements Capital Project Number CP #9788 Lake Charles Civic Center Amphitheater Enhancements (LED Lighting & Power Improvements) ADG #18355-A The scope of work for the above mentioned project is as follows: a) Provide 2-200 Amp 3 phase power sources for Amphitheater “show power”. b) Provide 4 new vendor power pedestals (one each near 4 existing in-ground power boxes). c) Provide new area lighting as the West End of Millennium Park is lacking illumination. Remove HID Fixtures and poles. All new lighting to be LED.
10/15/2019 07:45 PM UTC
CP3343
City of Lake Charles, Louisiana 2019 Lift Station Rehabilitation CP3343 The project scope of work shall consist of the following: 1. Brentwood • Replace pumps. • Replace valves and valve vault. Add bypass connection. • Replace wet well top slab. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Fence station. Pour concrete inside fence. 2. Third & McNabb • Replace pumps. • Replace valves and valve vault. Add bypass connection. • Replace wet well access hatch. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Add bollards to protect new electrical rack. • Fence station. Pour concrete inside fence. 3. Fitzenreiter. • Replace pumps. • Replace valves. Add bypass connection. • Replace wet well access hatch. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Extend aggregate driveway to new station fence. • Fence station. Pour concrete inside fence. • Add slope protection around station.
10/15/2019 07:45 PM UTC
Project No. 2019-692 Capital Project No. 3177
City of Lake Charles, Louisiana Project No. 2019-692 Capital Project No. 3177 W. Prien Lake Road Widening (Cove Lane to Ihles Road) Clearing and Grubbing The general scope of work for Project No. 2019-692, W. Prien Lake Widening Cove Lane to Ihles Road – Clearing and Grubbing Phase, is defined as follows: • The clearing of trees and shrubs located within the existing or newly acquired servitudes and road rights of way located along W. Prien Lake Road between Cove Lane and Ihles Rd and also along Sale Rd from W. Prien Lake to Burton Lane. • The demolition of the five (5) homes located at 2804 Henderson Forest Lane, 2803 & 2804 S. Locke Point Drive, and 2801 & 2802 N. Locke Point Drive. As well as the associated removal of driveways, sidewalks, pools, sheds, fencing, etc required to completely clear the lots. All of the work identified above is being done in anticipation of the project to relocate utilities and reconstruct and widen W. Prien Lake Road and Sale Road within the same area.
09/17/2019 07:45 PM UTC
251 - 260 of 408 Solicitations
1 2 … 22 23 24 26 28 29 30 … 40 41