City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP 3492
City of Lake Charles, Louisiana
Mallard Golf Driving Range
CP 3492
1. Four covered hitting bays totaling 1,333 SF with integrated hitting surfaces, rough ins for ball tracing technology by owner, integrated hitting surfaces, dining area behind each station, heating, and architecture matching the existing clubhouse.
2. Bar area totaling 1,178 SF with fold-up doors on all sides, serving bar, and seating area, architecture consistent with existing clubhouse.
3. Paved hitting area at the driving range with 5’ x 5’ hitting mats.
4. Two additional charging stations at existing cart facility serving 12 golf carts and a paved night hitting area with durable hitting mats.
| 09/15/2026 07:45 PM UTC |
|
CP 3537
City of Lake Charles, Louisiana
Goosport Recreation Splash Pad
CP 3537
Remove the existing splash pad and build a new splash pad and putting green and other work as noted in the project plans and project manual.
| 09/15/2026 07:45 PM UTC |
|
Capital Project No. CP3051
City of Lake Charles, Louisiana
2025 Citywide Striping Package
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3051
LEI Project No. 26-006
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. Southpark Road (McNeese Street to Smith Road)
2. 6th Avenue (12th Street to Broad Street)
3. Hodges Street (Alamo Street to Belden Street)
4. Bilbo Street (S. Railroad Avenue to Clarence Street)
5. Lake Street (Shell Beach Drive to Prien Lake Road)
6. Opelousas Street (Enterprise Boulevard to Highway 171)
7. Fitzenreiter Road (Riverside Park to Highway 171)
8. North Goos Boulevard (Knapp Street to Opelousas Street)
9. Medora Street (Simmons Street to Highway 171)
10. Shattuck Street (Broad Street to Moeling Street)
11. 18th Street (Lake Street to Ryan Street)
12. Enterprise Parkway (Interstate 10 to Katherine Street)
13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road)
14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road)
15. Enterprise Boulevard (12th Street to Prien Lake Road)
16. Broad Street (Lakeshore Drive to Enterprise Boulevard)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. 6th Street (4th Avenue to Highway 14)
19. Mill Street (Lakeshore Drive to Highway 14)
20. Common Street (McNeese Street to Prien Lake Road)
21. Lake Street (Prien Lake Road to McNeese Street)
22. Kirkman Street (Jackson Street to McNeese Street)
23. Alamo Street (Ryan Street to Enterprise Boulevard)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. 12th Street (Highway 14 to Hodges Street)
26. Sallier Street (Lake Street to Hodges Street)
27. Ernest Street (Sale Road to Sallier Street)
28. Jefferson Drive (University Drive to University Drive)
29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road)
30. General Doolittle Avenue (Highway 14 to General Twining Street)
31. Alvin Street (Sallier Street to Shell Beach Drive)
32. 18th Street (Enterprise Boulevard to Highway 14)
33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive)
34. Russell Street (12th Street to Hillcrest Drive)
35. Hillcrest Drive (Highway 14 to Russell Street)
36. N. Prater Street (Knapp Street to Fitzenreiter Road)
37. Pear Street (Knapp Street to Fitzenreiter Road)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 09/15/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project No. CP3313
City of Lake Charles, Louisiana
Shattuck Street Bridge
Lake Charles City Capital Project No. CP 3313
Project scope consists of lifting the ends of six 62 foot long Type III girders at the expansion joints (bents 7, 11, 12, 15, 18, and 21) to remove the existing bearing pads and replace them with new bearing pads. Each Type III girder will be lifted at one expansion joint at a time using ten (10) Enerpac RAC-502 (or equivalent) 50 ton hydraulic jacks.
| 08/06/2019 07:45 PM UTC |
|
Project No. 2019-689 Capital Project No. 3024
City of Lake Charles, Louisiana
Project No. 2019-689
Capital Project No. 3024
Russell Street Bridge Rehabilitation ~
The general scope of work for Project No. 2019-689, Capital Project No. 2968, Russell Street Bridge Piling Rehabilitation, includes the following:
(a) Bridge piling rehabilitation with grout-filled jackets;
(b) Bridge piling rehabilitation with new pile splices with galvanized channel bracing;
(c) Spall repair on underside of concrete bridge structure;
(d) Sway bracing removal and placement;
(e) Erecting and maintaining signage and barricades for detour routing;
(f) Approach slab removal and replacement.
| 07/16/2019 07:45 PM UTC |
|
Project No. 2019-687 Capital Project No. 3332
City of Lake Charles, Louisiana
Project No. 2019-687
Capital Project No. 3332
Port Wonder Utilities Extension
The general scope of work includes the extension of a 12” diameter water main from the Northwest corner of the Old Harrah’s Parking Garage Tract West approximately 630 feet to the East property line of the City of Lake Charles Alligator Pond Tract, including fire hydrant assemblies and service connection points for the future Port Wonder Development, and the extension of a 10” diameter sewer main from the Northeast corner of the Old Harrah’s asphalt parking lot West approximately 1100 feet, including manholes. Pavement removed at the Port Wonder site will not be replaced. Pavement removed at the Old Harrah’s site will be replaced.
| 06/18/2019 07:45 PM UTC |
|
CP 3303
City of Lake Charles, LA
New Transit Bus Storage Facility
CP 3303
The project consists of the new construction of a 7500 square foot pre-engineered metal canopy building and associated site improvements. The contract duration is 180 days with liquidated assessed at a rate of $270.00 dollars per calendar a day.
| 06/04/2019 07:45 PM UTC |
|
CP3297
City of Lake Charles, Louisiana
WWTP A BASIN A-03 REHABILITATION PROJECT
CP3297
I. Scope of Services:
A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed.
C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-03. The Work includes, but is not necessarily limited to, the following:
1. Pipe bursting 8080 linear feet of existing 8” and 10” sewer to new 8” and 10”.
2. 30 point repairs to 8” sewer pipe at varying depths 0-12’.
3. 70’ of open cut replacement, 4 point repairs to 18” sewer pipe.
4. Replacement of approximately 132 active sewer service laterals.
5. Coating approximately 350 vertical feet of existing and new manholes.
6. Furnish and Install 3 new manholes.
| 05/14/2019 07:45 PM UTC |
|
Project No. 2018-680 Capital Project No. 3252
City of Lake Charles, Louisiana
Project No. 2018-680
Capital Project No. 3252
2018 CDBG South Roosevelt Drainage Improvements Phase Two ~
The general scope of work for Project No. 2018-680 includes installation of reinforced concrete pipe and catch basins for drainage improvements and pavement work.
| 04/30/2019 07:45 PM UTC |
|
MAI Project No. B6-18063-DA, CP# 3312
City of Lake Charles, Louisiana
2017 CDBG Infrastructure – Asphalt Overlay of Various Streets
MAI Project No. B6-18063-DA
Capital Project No. CP3312
| 04/16/2019 07:45 PM UTC |
|
Project No. 2018-682 Capital Project No. 3283
PROJECT NO. 2018-682
CAPITAL PROJECT NO. 3283
LEGENDRE STREET DRAINAGE PH II
CITY OF LAKE CHARLES, LOUISIANA
SCOPE OF WORK
Project No. 2018-682 includes installation of approximately 470 linear feet of 8x7 box culvert on the East roadside ditch of Legendre Street starting at the downstream end near the Cell tower driveway and extending South tying into the existing box culvert at McNeese Street.
| 04/16/2019 07:45 PM UTC |
|
Project No. 2019-684, Capital Project No. 3093
City of Lake Charles, Louisiana
Project No. 2019-684
Capital Project No. 3093
Maidstone and Woodside Drive Drainage Pipe Rehabilitation
The goal of this project is to rehabilitate existing reinforced concrete drain lines on Woodside Drive and Maidstone Drive in the City of Lake Charles, LA with cured-in-place pipe lining.
| 02/05/2019 08:45 PM UTC |
|
Project No. 2018-672, Capital Project No. 3308
City of Lake Charles, Louisiana
Project No. 2018-672 (Capital Project No. 3308)
Streetscape – Mill and Division
The goal of this project is to enhance pedestrian safety and beautify Mill and Division Streets along the new ERDACE Development from Ryan Street to Ann Street. This will be accomplished by the reconstruction of the sidewalks to include pavers. The scope of work shall also include overhead decorative lamp posts, litter receptacles, drainage and pavement markings.
| 01/15/2019 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.