General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
RFP #2026-25
Request for Proposals for Entertainment, Food and Beverage Establishment on the Lakefront
07/14/2026 07:45 PM UTC
Capital Project Number 3544
City of Lake Charles Hodges Street Waterline Extension Capital Project Number 3544 I. Background: Homes along Hodges Street are experiencing ongoing low water pressure issues. Existing infrastructure along this section of the distribution system is undersized and unable to adequately meet current household demand, resulting in inconsistent and insufficient water pressure within several homes. By extending and upgrading the waterline, the project will improve system capacity, enhance water flow, and provide more reliable service to affected properties. This improvement is intended to ensure adequate water pressure for daily use and to support long-term reliability of the neighborhood’s water distribution system. II. Project Scope of Work: Design and implementation of ~1,500 feet of 6-inch diameter waterline including a looping connection on W. Prien Lake Road and a looping connection on E. Hale Street. Design Services shall be as per the City of Lake Charles A&E Manual.
08/04/2026 07:45 PM UTC
Capital Project No. CP2894
City of Lake Charles, Louisiana WWTP A McNabb and Cline Street Emergency Sewer System Rehabilitation Capital Project No. CP2894 I. Background: Waggoner Engineering, Inc. (Waggoner) was retained by the City of Lake Charles, Louisiana to evaluate and address deficiencies within the existing sanitary sewer collection system along McNabb Street between Broad Street and Cline Street. Approximately 2,250 linear feet of existing 18-inch reinforced concrete sanitary sewer pipe along McNabb Street has been identified as being in poor structural condition. Observed deficiencies include cracking and joint separation. Due to the severity and extent of the deterioration, the sewer line is no longer suitable for spot repairs or lining and requires full replacement. Rehabilitation of this segment will be performed using pipe bursting methods to install new 18-inch high-density polyethylene (HDPE) pipe, minimizing surface disruption while significantly improving the long-term performance and reliability of the sanitary sewer system. II. Project Scope of Work: Design and construction services for the repair and rehabilitation of the existing 18-inch gravity sanitary sewer collection system along McNabb Street, between Broad Street and Cline Street, to address documented system deterioration. Design services shall be as per the City of Lake Charles A&E Manual. The work will include, but is not limited to, the following: • Replacement of the existing 18-inch gravity sewer main via pipe bursting installation. • Reinstating of existing sanitary sewer service laterals to the rehabilitated main. • Furnishing, installation, operation, and maintenance of temporary bypass pumping to maintain continuous sewer service during construction.
08/04/2026 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP 3303
City of Lake Charles, LA New Transit Bus Storage Facility CP 3303 The project consists of the new construction of a 7500 square foot pre-engineered metal canopy building and associated site improvements. The contract duration is 180 days with liquidated assessed at a rate of $270.00 dollars per calendar a day.
06/04/2019 07:45 PM UTC
CP3297
City of Lake Charles, Louisiana WWTP A BASIN A-03 REHABILITATION PROJECT CP3297 I. Scope of Services: A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-03. The Work includes, but is not necessarily limited to, the following: 1. Pipe bursting 8080 linear feet of existing 8” and 10” sewer to new 8” and 10”. 2. 30 point repairs to 8” sewer pipe at varying depths 0-12’. 3. 70’ of open cut replacement, 4 point repairs to 18” sewer pipe. 4. Replacement of approximately 132 active sewer service laterals. 5. Coating approximately 350 vertical feet of existing and new manholes. 6. Furnish and Install 3 new manholes.
05/14/2019 07:45 PM UTC
Project No. 2018-680 Capital Project No. 3252
City of Lake Charles, Louisiana Project No. 2018-680 Capital Project No. 3252 2018 CDBG South Roosevelt Drainage Improvements Phase Two ~ The general scope of work for Project No. 2018-680 includes installation of reinforced concrete pipe and catch basins for drainage improvements and pavement work.
04/30/2019 07:45 PM UTC
MAI Project No. B6-18063-DA, CP# 3312
City of Lake Charles, Louisiana 2017 CDBG Infrastructure – Asphalt Overlay of Various Streets MAI Project No. B6-18063-DA Capital Project No. CP3312
04/16/2019 07:45 PM UTC
Project No. 2018-682 Capital Project No. 3283
PROJECT NO. 2018-682 CAPITAL PROJECT NO. 3283 LEGENDRE STREET DRAINAGE PH II CITY OF LAKE CHARLES, LOUISIANA SCOPE OF WORK Project No. 2018-682 includes installation of approximately 470 linear feet of 8x7 box culvert on the East roadside ditch of Legendre Street starting at the downstream end near the Cell tower driveway and extending South tying into the existing box culvert at McNeese Street.
04/16/2019 07:45 PM UTC
Project No. 2019-684, Capital Project No. 3093
City of Lake Charles, Louisiana Project No. 2019-684 Capital Project No. 3093 Maidstone and Woodside Drive Drainage Pipe Rehabilitation The goal of this project is to rehabilitate existing reinforced concrete drain lines on Woodside Drive and Maidstone Drive in the City of Lake Charles, LA with cured-in-place pipe lining.
02/05/2019 08:45 PM UTC
Project No. 2018-672, Capital Project No. 3308
City of Lake Charles, Louisiana Project No. 2018-672 (Capital Project No. 3308) Streetscape – Mill and Division The goal of this project is to enhance pedestrian safety and beautify Mill and Division Streets along the new ERDACE Development from Ryan Street to Ann Street. This will be accomplished by the reconstruction of the sidewalks to include pavers. The scope of work shall also include overhead decorative lamp posts, litter receptacles, drainage and pavement markings.
01/15/2019 08:45 PM UTC
Project No. CP3304
City of Lake Charles, Louisiana College Oaks Park New Restroom Bldg. 3518 Ernest Street, Lake Charles, LA Capital Project Number CP 3304 Scope of Work: Provide a new restroom building at the existing developed park. The new building to be CMU Black walls with wood truss roof system and shingled roofing.
12/18/2018 08:45 PM UTC
CP 3264
City of Lake Charles, Louisiana INTERSTATE CORRIDOR BEAUTIFICATION PHASE II LaDoTD Permit No. 153754 Capital Project Number CP3264 The general scope of work for Project Interstate Corridor Beautification Phase II, Capital Project No. 3264, for LaDOTD Permitted Project No. 153754 for construction includes the following. Base bid of clearing and grubbing of selective trees, planting of trees, and shrubs. Add alternate no. 1 of maintenance operations of selective areas within the interchange by way mowing grass, weed control, volunteer vegetation growth removal, mulching for one year period. See ‘Exhibit A’ identifying the selective areas for maintenance operations.
11/20/2018 08:45 PM UTC
Project No. 2018-678 (PR0002)
City of Lake Charles, Louisiana Project No. 2018-678 (PR0002) North Beach Improvements - Erosion Repair North Beach to Promenade The scope of work includes revetment and shore erosion repair, drainage and piping installation, sidewalk repair, and gutter paving.
11/06/2018 08:45 PM UTC
261 - 270 of 402 Solicitations