Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana
Project No. 2024-746
Capital Project No. 3502
Kirby and Hodges Street Sidewalk Repairs
The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
| 07/01/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Project No. 2017-667 Capital Project No. 3270
Project No. 2017-667
Capital Project No. 3270
CDBG 5th Avenue Sidewalk Improvements
City of Lake Charles, LA ~
The general scope of work for Project No. 2017-667, Capital Project No. 3270, CDBG - 5th Avenue Sidewalk Improvements, includes installation of new concrete sidewalks, complete with ADA compliant surfaces at select locations.
| 04/17/2018 07:45 PM UTC |
Project No. 2017-668 Capital Project No. 3207
City of Lake Charles, Louisiana
Project No. 2017-668
Capital Project No. 3207
Enterprise Blvd. Paving and Drainage Rehabilitation
Phase 1
The general scope of work for Project No. 2017-668 includes rehabilitation of portions of the existing drainage system on Enterprise Boulevard, including removal and replacement of pipe, pipe bursting, cured-in-place pipe lining (CIPP), and catch basin construction between 12th Street and Broad Street in the City of Lake Charles, Louisiana.
| 04/03/2018 07:45 PM UTC |
Project No. 2017-669 Capital Project No. 3283
Project No. 2017-669
Capital Project No. 3283
Legendre Street Drainage Improvements - Contraband Bayou to McNeese Street Phase One
City of Lake Charles, LA ~
The scope of work for Project No. 2017-669 includes installation of approximately 675 linear feet of 8’ x 7’ Reinforced Concrete Box Culverts (RCB) and drainage inlets in the East roadside ditch of Legendre Street starting at the downstream end near Contraband Bayou and proceeding South to the Cell Tower drive (approximately 260 feet South of Badger Drive).
| 03/06/2018 08:45 PM UTC |
Project No. 2016-658, Capital Project No. 3288
Project No. 2016-658
Capital Project No. 3288
48” CIPP Lining from The Holly Hill Road/Prien Lake Road Roundabout
North to the Contraband Bayou Lift Station
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-658, Capital Project No. 3288, includes the rehabilitation of approximately 2600 feet of 48 inch sewer main by cured-in-place (CIPP) lining from the Holly Hill Road/Prien Lake Road Roundabout North to the Contraband Bayou Lift Station. A system for bypass pumping to manage sewage flow must be furnished and maintained. Manhole tops will require removal and re construction to facilitate liner installation. Concrete and/or brick manholes will also be rehabilitated with new interior liners.
| 02/20/2018 08:45 PM UTC |
Capital Project Number CP3302
Capital Project Number CP3302
Southwest Water Treatment Plant
Horizontal Pressure Filter Rehabilitation
City of Lake Charles, LA ~
I. Scope of Services:
The City of Lake Charles desires to rehabilitate the six (6) existing horizontal pressure filters at the Southwest Water Treatment Plant. This Work will include but is not limited to the following:
1. Removal and replacement of the Filter Media within Filters #1 – 6
a. Estimated Total Volume Needed: 4,320 ft.3
b. 24” Layer of Manganese Greensand & 12” Layer of Anthracite
2. Removal and replacement of the Existing Gravel Bed and Retaining Screen
3. Removal and replacement of the Existing Underdrain Valves
4. Removal and replacement of additional Filter Internals as Required
5. Removal and replacement of the existing air scour piping and discharge nozzles.
6. Removal and replacement of the existing backwash water flow meter.
| 02/20/2018 08:45 PM UTC |
Project No. 2016-650, Capital Project No. 3268
Project No. 2016-650
Capital Project No. CP3268
Nelson Road Sewer Force Main Upgrade
Country Club Road to Linden Lane
City of Lake Charles, LA ~
This scope of work for Project No. 2016-650, Nelson Road Sewer Force Main Upgrade – Country Club Road to Linden Lane, includes the installation of a new 10 inch diameter force main from the intersection of Nelson Road and Country Club Road South to tie into an existing 10 inch diameter force main North of Linden Lane. This new force main will service the existing Pecan Acres sewer lift station and will include a connection for the option of receiving flow from the Nelson Pointe Apartments sewer lift station.
| 02/06/2018 08:45 PM UTC |
Capital Project No. CP3128
WWTP B/C Expansion and Rehabilitation Project
Phase I Demolition
Capital Project Number CP3128
City of Lake Charles, LA ~
I. Scope of Services:
A. A new WWTP B/C facility is currently under construction for The City of Lake Charles. Decommissioning of the existing WWTP B/C has been divided into two phases.
B. This scope of work covers Phase I of the demolition. The Work includes, but is not necessarily limited to, the following:
1. Removal and disposal of mechanical and electrical equipment from existing tankage at existing WWTPs B and C.
2. Demolition and filling of existing tankage at existing WWTPs B and C.
3. Installation of approximately 250 linear feet of 8-inch PVC, 20 linear feet of 24-inch ductile iron pipe, 90 linear feet of 30-inch HDPE, 372 linear feet of 48-inch ductile iron pipe, one new reinforced cast in place concrete collection box, and one 8-ft diameter FRP manhole.
4. Coating of two existing manholes and one new reinforced cast in place concrete collection box.
| 01/16/2018 08:45 PM UTC |
Capital Project No. CP3264
Capital Project No. CP3264
Interstate Corridor Beautification Project Phase I
REBID
City of Lake Charles, LA ~
NORTH I-10 EXIT RAMP 30 B AND SERVICE ROAD- LaDOTD PERMIT 153562
SOUTH I-10 SERVICE ROAD LaDOTD PERMIT 153565
COVE LANE AND ROUNDABOUT- LaDOTD PERMIT 153586
SCOPE OF WORK
The general scope of work for Project Interstate Corridor Beautification Phase I, Capital Project No. 3264, includes the following.
North I-10 Exit Ramp 30 B and Service Road - Installation of trees, palms, and shrubs.
South I-10 Service Road - Installation of trees, palms, and shrubs.
Cove Lane and Roundabout - installation of trees, palms, shrubs, and installation within the roundabout borrow fill material, concrete curbing, aluminum edging, and decorative stone with binding solution.
| 01/16/2018 08:45 PM UTC |
Project No. CP3264 Interstate Corridor Beautification Phase I (REBID)
Capital Project No. CP3264
Interstate Corridor Beautification Project Phase I
REBID
City of Lake Charles, LA ~
NORTH I-10 EXIT RAMP 30 B AND SERVICE ROAD- LaDOTD PERMIT 153562
SOUTH I-10 SERVICE ROAD LaDOTD PERMIT 153565
COVE LANE AND ROUNDABOUT- LaDOTD PERMIT 153586
SCOPE OF WORK
The general scope of work for Project Interstate Corridor Beautification Phase I, Capital Project No. 3264, includes the following.
North I-10 Exit Ramp 30 B and Service Road - Installation of trees, palms, and shrubs.
South I-10 Service Road - Installation of trees, palms, and shrubs.
Cove Lane and Roundabout - installation of trees, palms, shrubs, and installation within the roundabout borrow fill material, concrete curbing, aluminum edging, and decorative stone with binding solution.
| 01/16/2018 08:45 AM UTC |
Capital Project Number OP 0601
Capital Project Number OP 0601
Chennault Water Treatment Plant
400,000 Gallon Elevated Water Storage Tank Rehabilitation
City of Lake Charles, LA ~
I. Scope of Services:
A. The City of Lake Charles Water Division currently owns and operates the 400,000 Gallon Elevated Storage Tank at the Chennault Water Treatment Plant. Rehabilitation of the existing tank in general includes:
a. Drainage improvements around the tank
b. Erection and maintenance of a temporary containment system to contain sand blasting and paint debris from falling on adjacent properties and vehicles.
c. Light sand blasting of the tank exterior and appurtenances and applying a three coat exterior coating system to the entire tank exterior.
d. Sandblasting interior tank walls and appurtenances and applying 3 coat interior coating system to these surfaces.
e. Perform the necessary adjustments to windages/sway rods to return the tank to its original erect, design conformance.
f. Furnish and install repairs and improvements to the interior roof, vent, roof ladder, etc.
g. Remove and dispose of existing overflow piping within tank riser and buried vault. Install new, exterior overflow piping to discharge into a closed drainage
system to be routed to the adjacent ditch.
| 01/02/2018 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.