General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Capital Project No. CP3051
City of Lake Charles, Louisiana 2025 Citywide Striping Package Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3051 LEI Project No. 26-006 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. Southpark Road (McNeese Street to Smith Road) 2. 6th Avenue (12th Street to Broad Street) 3. Hodges Street (Alamo Street to Belden Street) 4. Bilbo Street (S. Railroad Avenue to Clarence Street) 5. Lake Street (Shell Beach Drive to Prien Lake Road) 6. Opelousas Street (Enterprise Boulevard to Highway 171) 7. Fitzenreiter Road (Riverside Park to Highway 171) 8. North Goos Boulevard (Knapp Street to Opelousas Street) 9. Medora Street (Simmons Street to Highway 171) 10. Shattuck Street (Broad Street to Moeling Street) 11. 18th Street (Lake Street to Ryan Street) 12. Enterprise Parkway (Interstate 10 to Katherine Street) 13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road) 14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road) 15. Enterprise Boulevard (12th Street to Prien Lake Road) 16. Broad Street (Lakeshore Drive to Enterprise Boulevard) 17. Moeling Street (Enterprise Boulevard to Highway 171) 18. 6th Street (4th Avenue to Highway 14) 19. Mill Street (Lakeshore Drive to Highway 14) 20. Common Street (McNeese Street to Prien Lake Road) 21. Lake Street (Prien Lake Road to McNeese Street) 22. Kirkman Street (Jackson Street to McNeese Street) 23. Alamo Street (Ryan Street to Enterprise Boulevard) 24. Oak Park Boulevard (Enterprise Boulevard to Highway 14) 25. 12th Street (Highway 14 to Hodges Street) 26. Sallier Street (Lake Street to Hodges Street) 27. Ernest Street (Sale Road to Sallier Street) 28. Jefferson Drive (University Drive to University Drive) 29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road) 30. General Doolittle Avenue (Highway 14 to General Twining Street) 31. Alvin Street (Sallier Street to Shell Beach Drive) 32. 18th Street (Enterprise Boulevard to Highway 14) 33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive) 34. Russell Street (12th Street to Hillcrest Drive) 35. Hillcrest Drive (Highway 14 to Russell Street) 36. N. Prater Street (Knapp Street to Fitzenreiter Road) 37. Pear Street (Knapp Street to Fitzenreiter Road) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
11/17/2026 08:45 PM UTC
2027-04
Maintenance of City of Lake Charles Customer-Owned Lighting
11/17/2026 08:45 PM UTC
Capital Project Number CP3453
CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3453 HMGP PROJECT NUMBER DR-4559-0043 I. Scope of Services: Contractor shall complete Work as specified and indicated in the Contract Documents for Lift Station Back-Up Power Improvements (Capital Project No. CP3453). This Work includes, but is not limited to, the following: • Install of Automatic Transfer Switches & Stand-By Diesel Generators at Lift Stations. • Miscellaneous Work including civil, mechanical, structural, & electrical components required to fully execute the Work.
11/17/2026 08:45 PM UTC
Capital Project No. 3508
City of Lake Charles, Louisiana Project No. 2024-745 Capital Project No. 3508 Riverside Park Shoreline Protection – Phase One The general scope of work for this project includes the restoration and protection of approximately 250 linear feet of shoreline near the entrance of Riverside Park. This restorative work includes placement of stone revetment to rebuild the riverbank, repair/replacement of existing decorative black fence compromised from erosion, and installation of approximately 100 linear feet of steel sheet pile for bank protection near the gate entrance.
11/17/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Project No. CP 3316
City of Lake Charles, Louisiana Mallard Golf Club Lake Charles Clubhouse & Pro Shop CP 3316 New 7000 SF Clubhouse facility will include Pro Shop, Offices, Restrooms, Dinning/Bar and Kitchen
07/06/2021 07:45 PM UTC
HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the chemical feed systems at the Center East, Center West, Chennault, and McNeese Water Treatment Plants, to the point where the systems are not operational. This project will serve to re‐instate operation of ALL chemical feed systems and return the water system to its pre‐storm operation. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of mechanical and electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR‐4559‐LA), to reinstate the damaged systems to pre‐storm conditions and to upgrade these existing systems to coincide with newly applicable codes, standards, and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Center East Water Treatment Plant (3207 Center Street) • Chlorine Feed System (Insurance SOV #101) o Remove and Replace Exterior Door w/Panic Hardware and Inspection Window o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4) • Fluoride Feed System (Insurance SOV #102) o Removal and Disposal of ~600 Gallons of Diluted Chemical o Repair Apparent Leak on Bulk Storage Discharge Line (1‐Inch) o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Phosphate Feed System (Insurance SOV #104) o Removal and Disposal of ~700 Gallons of Diluted Chemical o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure o Remove and Replace Damaged Exhaust Fan on Fiberglass Enclosure o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Caustic Feed System (Insurance SOV #108) o Removal and Disposal of ~700 Gallons of Diluted Chemical o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Remove and Replace Seal Fittings on Existing Junction Box (TYP. of 3, 3/4”) o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity Center West Water Treatment Plant (3208 Center Street) • Caustic Feed System (Insurance SOV #103) o Removal and Disposal of ~1,300 Gallons of Diluted Chemical o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Remove and Replace Damaged Isolation Valve on Bulk Storage Discharge (1‐Inch) o Furnish and Install 200 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Phosphate Feed System (Insurance SOV #105) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports o Re‐Terminate Electrical Service from Pump Building and Well Controls o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Fluoride Feed System (Insurance SOV #106) o Removal and Disposal of ~1,100 Gallons of Diluted Chemical o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity Chennault Water Treatment Plant (1501 W. Main Street) • Caustic Feed System (Insurance SOV #95) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Furnish and Install Electrical Wiring/Conduit for Electrical Service and Controls o Terminate Electrical Service into Existing Low Voltage Panelboard and QDS PLC o Furnish/Install/Relocate Fiberglass Enclosure w/Appurtenances o Re‐Terminate into Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 150 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Chlorine Feed System (Insurance SOV #96) o Remove and Replace Exterior Door w/Panic Hardware and Inspection Window o Remove and Replace Damaged Exterior Windows (TYP. of 3) o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4) • Fluoride Feed System (Insurance SOV #98) o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Phosphate Feed System (Insurance SOV #99) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Furnish and Install Electrical Wiring/Conduit for Electrical Service and Controls o Terminate Electrical Service into Existing Low Voltage Panelboard and QDS PLC o Furnish/Install/Relocate Fiberglass Enclosure w/Appurtenances o Re‐Terminate into Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity McNeese Water Treatment Plant (617 E. McNeese Street) • Caustic Feed System (Insurance SOV #110) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install New Bulk Storage Fill Line (2‐Inch) o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height) o Furnish and Install 200 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Chlorine Feed System (Insurance SOV #112) o Remove and Replace Damaged Electrical Conduit & Wiring w/Support Brackets o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4) o Remove/Replace/Anchor Fiberglass Enclosure w/Appurtenances • Fluoride Feed System (Insurance SOV #113) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports o Re‐Terminate Electrical Service from Pump Building and Well Controls o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity • Phosphate Feed System (Insurance SOV #114) o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports o Re‐Terminate Electrical Service from Pump Building and Well Controls o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch) o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch) o Furnish and Install Duplex Metering Pump Skid o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1) o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch) o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
07/06/2021 07:45 PM UTC
Repair Project HL-SOV-081
City of Lake Charles WWTP A Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-081 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP A 1. Remove and dispose of settled debris in Digester No. 1 (SOV 81.F.1). 2. Remove and dispose of settled debris in Digester No. 2 (SOV 81.F.2). 3. Remove and dispose of settled debris in Aeration Basin No. 1 (SOV 81.G.1). 4. Remove and dispose of settled debris in Aeration Basin No. 2 (SOV 81.G.2). 5. Remove and dispose of settled debris in Aeration Basin No. 3 (SOV 81.G.3). 6. Remove and dispose of settled debris in Aeration Basin No. 4 (SOV 81.G.4).
06/01/2021 07:45 PM UTC
Repair Project HL-SOV-029
City of Lake Charles WWTP B/C Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-029 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP B/C 1. Remove and dispose of debris in Digester No. 1 (SOV 29). 2. Remove and dispose of debris in Aeration Basin No. 1 (SOV 29.A.1).
06/01/2021 07:45 PM UTC
Repair Project HL-SOV-126
City of Lake Charles WWTP D Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-126 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP D 1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2). 3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3). 4. Remove and dispose of debris in Oxidation Ditch No. 1 (SOV 126.A.1). 5. Remove and dispose of debris in Oxidation Ditch No. 2 (SOV 126.A.2). 6. Remove and dispose of debris in Oxidation Ditch No. 3 (SOV 126.A.3). 7. Remove and dispose of debris in Anoxic Tank No. 1 (SOV 126.A.4). 8. Remove and dispose of debris in Anoxic Tank No. 2 (SOV 126.A.5).
06/01/2021 07:45 PM UTC
2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
06/01/2021 07:45 PM UTC
Various Fire Stations Interior & Exterior Repairs
City of Lake Charles, Louisiana Various Fire Stations Interior & Exterior Repairs Project #HL-56, HL-57, HL-58, HL-59, HL-62, HL-119, HL-121, HL-122 Scope of work: Repairs to water damage at interior of buildings consisting of removing and replacing painted sheetrock, ceiling tiles and other items at select stations. Exterior work will consist of fastener replacement at metal roofs and fence / gate replacement.
04/13/2021 07:45 PM UTC
Repair Project HL-SOV-081
City of Lake Charles WWTP A Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-081 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Remove storm blown debris from open top wastewater tanks. 2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill. 3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant. 4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill. 5. The landfilled product shall have a minimum solids content of 16%. 6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP A 1. Remove and dispose of debris in Digester No. 1 (SOV 81.F.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 81.F.2). 3. Pump water/debris from Aeration Basin No. 1 (SOV 81.G.1) to head of plant. 4. Pump water/debris from Aeration Basin No. 2 (SOV 81.G.2) to head of plant. 5. Pump water/debris from Aeration Basin No. 3 (SOV 81.G.3) to head of plant. 6. Pump water/debris from Aeration Basin No. 4 (SOV 81.G.4) to head of plant.
04/13/2021 07:45 PM UTC
Repair Project HL-SOV-029
City of Lake Charles WWTP B/C Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-029 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Remove storm blown debris from open top wastewater tanks. 2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill. 3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant. 4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill. 5. The landfilled product shall have a minimum solids content of 16%. 6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP B/C 1. Remove and dispose of debris in Digester No. 1 (SOV 29). 2. Pump water/debris from Aeration Basin No. 1 (SOV 29.A.1) to head of plant.
04/13/2021 07:45 PM UTC
Repair Project HL-SOV-126
City of Lake Charles WWTP D Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-126 I. Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Remove storm blown debris from open top wastewater tanks. 2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill. 3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant. 4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill. 5. The landfilled product shall have a minimum solids content of 16%. 6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP D 1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2). 3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3). 4. Pump water/debris from Oxidation Ditch No. 1 (SOV 126.A.1) to head of the plant. 5. Pump water/debris from Oxidation Ditch No. 2 (SOV 126.A.2) to head of the plant. 6. Pump water/debris from Oxidation Ditch No. 3 (SOV 126.A.3) to head of the plant. 7. Pump water/debris from Anoxic Tank No. 1 (SOV 126.A.4) to head of the plant. 8. Pump water/debris from Anoxic Tank No. 2 (SOV 126.A.5) to head of the plant. 9. Pump water/debris from Anoxic Tank No. 3 (SOV 126.A.6) to head of the plant.
04/13/2021 07:45 PM UTC
181 - 190 of 408 Solicitations
1 2 … 15 16 17 19 21 22 23 … 40 41