CP 3492
City of Lake Charles, Louisiana
Mallard Golf Driving Range
CP 3492
1. Four covered hitting bays totaling 1,333 SF with integrated hitting surfaces, rough ins for ball tracing technology by owner, integrated hitting surfaces, dining area behind each station, heating, and architecture matching the existing clubhouse.
2. Bar area totaling 1,178 SF with fold-up doors on all sides, serving bar, and seating area, architecture consistent with existing clubhouse.
3. Paved hitting area at the driving range with 5’ x 5’ hitting mats.
4. Two additional charging stations at existing cart facility serving 12 golf carts and a paved night hitting area with durable hitting mats.
| 09/15/2026 07:45 PM UTC |
|
CP 3537
City of Lake Charles, Louisiana
Goosport Recreation Splash Pad
CP 3537
Remove the existing splash pad and build a new splash pad and putting green and other work as noted in the project plans and project manual.
| 09/15/2026 07:45 PM UTC |
|
Capital Project No. CP3051
City of Lake Charles, Louisiana
2025 Citywide Striping Package
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3051
LEI Project No. 26-006
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. Southpark Road (McNeese Street to Smith Road)
2. 6th Avenue (12th Street to Broad Street)
3. Hodges Street (Alamo Street to Belden Street)
4. Bilbo Street (S. Railroad Avenue to Clarence Street)
5. Lake Street (Shell Beach Drive to Prien Lake Road)
6. Opelousas Street (Enterprise Boulevard to Highway 171)
7. Fitzenreiter Road (Riverside Park to Highway 171)
8. North Goos Boulevard (Knapp Street to Opelousas Street)
9. Medora Street (Simmons Street to Highway 171)
10. Shattuck Street (Broad Street to Moeling Street)
11. 18th Street (Lake Street to Ryan Street)
12. Enterprise Parkway (Interstate 10 to Katherine Street)
13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road)
14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road)
15. Enterprise Boulevard (12th Street to Prien Lake Road)
16. Broad Street (Lakeshore Drive to Enterprise Boulevard)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. 6th Street (4th Avenue to Highway 14)
19. Mill Street (Lakeshore Drive to Highway 14)
20. Common Street (McNeese Street to Prien Lake Road)
21. Lake Street (Prien Lake Road to McNeese Street)
22. Kirkman Street (Jackson Street to McNeese Street)
23. Alamo Street (Ryan Street to Enterprise Boulevard)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. 12th Street (Highway 14 to Hodges Street)
26. Sallier Street (Lake Street to Hodges Street)
27. Ernest Street (Sale Road to Sallier Street)
28. Jefferson Drive (University Drive to University Drive)
29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road)
30. General Doolittle Avenue (Highway 14 to General Twining Street)
31. Alvin Street (Sallier Street to Shell Beach Drive)
32. 18th Street (Enterprise Boulevard to Highway 14)
33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive)
34. Russell Street (12th Street to Hillcrest Drive)
35. Hillcrest Drive (Highway 14 to Russell Street)
36. N. Prater Street (Knapp Street to Fitzenreiter Road)
37. Pear Street (Knapp Street to Fitzenreiter Road)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 09/15/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
Repair Project HL-SOV-029
City of Lake Charles
WWTP B/C Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-029
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP B/C
1. Remove and dispose of debris in Digester No. 1 (SOV 29).
2. Remove and dispose of debris in Aeration Basin No. 1 (SOV 29.A.1).
| 06/01/2021 07:45 PM UTC |
|
Repair Project HL-SOV-126
City of Lake Charles
WWTP D Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-126
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP D
1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1).
2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2).
3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3).
4. Remove and dispose of debris in Oxidation Ditch No. 1 (SOV 126.A.1).
5. Remove and dispose of debris in Oxidation Ditch No. 2 (SOV 126.A.2).
6. Remove and dispose of debris in Oxidation Ditch No. 3 (SOV 126.A.3).
7. Remove and dispose of debris in Anoxic Tank No. 1 (SOV 126.A.4).
8. Remove and dispose of debris in Anoxic Tank No. 2 (SOV 126.A.5).
| 06/01/2021 07:45 PM UTC |
|
2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
| 06/01/2021 07:45 PM UTC |
|
Various Fire Stations Interior & Exterior Repairs
City of Lake Charles, Louisiana
Various Fire Stations Interior & Exterior Repairs
Project #HL-56, HL-57, HL-58, HL-59, HL-62, HL-119, HL-121, HL-122
Scope of work: Repairs to water damage at interior of buildings consisting of removing and replacing painted sheetrock, ceiling tiles and other items at select stations. Exterior work will consist of fastener replacement at metal roofs and fence / gate replacement.
| 04/13/2021 07:45 PM UTC |
|
Repair Project HL-SOV-081
City of Lake Charles
WWTP A Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-081
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Remove storm blown debris from open top wastewater tanks.
2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill.
3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant.
4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill.
5. The landfilled product shall have a minimum solids content of 16%.
6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP A
1. Remove and dispose of debris in Digester No. 1 (SOV 81.F.1).
2. Remove and dispose of debris in Digester No. 2 (SOV 81.F.2).
3. Pump water/debris from Aeration Basin No. 1 (SOV 81.G.1) to head of plant.
4. Pump water/debris from Aeration Basin No. 2 (SOV 81.G.2) to head of plant.
5. Pump water/debris from Aeration Basin No. 3 (SOV 81.G.3) to head of plant.
6. Pump water/debris from Aeration Basin No. 4 (SOV 81.G.4) to head of plant.
| 04/13/2021 07:45 PM UTC |
|
Repair Project HL-SOV-029
City of Lake Charles
WWTP B/C Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-029
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Remove storm blown debris from open top wastewater tanks.
2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill.
3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant.
4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill.
5. The landfilled product shall have a minimum solids content of 16%.
6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP B/C
1. Remove and dispose of debris in Digester No. 1 (SOV 29).
2. Pump water/debris from Aeration Basin No. 1 (SOV 29.A.1) to head of plant.
| 04/13/2021 07:45 PM UTC |
|
Repair Project HL-SOV-126
City of Lake Charles
WWTP D Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-126
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Remove storm blown debris from open top wastewater tanks.
2. Sludge material in digesters to be dewatered, hauled, and disposed of at an approved landfill.
3. For all other tanks, contractor shall dewater and pump product through a 1-inch screen and discharge to a manhole at the head of the plant.
4. When the pumped sludge becomes too laborious to pass through a 1-inch screen, contractor shall remove the product and dispose of off-site at an approved landfill.
5. The landfilled product shall have a minimum solids content of 16%.
6. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP D
1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1).
2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2).
3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3).
4. Pump water/debris from Oxidation Ditch No. 1 (SOV 126.A.1) to head of the plant.
5. Pump water/debris from Oxidation Ditch No. 2 (SOV 126.A.2) to head of the plant.
6. Pump water/debris from Oxidation Ditch No. 3 (SOV 126.A.3) to head of the plant.
7. Pump water/debris from Anoxic Tank No. 1 (SOV 126.A.4) to head of the plant.
8. Pump water/debris from Anoxic Tank No. 2 (SOV 126.A.5) to head of the plant.
9. Pump water/debris from Anoxic Tank No. 3 (SOV 126.A.6) to head of the plant.
| 04/13/2021 07:45 PM UTC |
|
Project No. HL-201
City of Lake Charles, Louisiana
City of Lake Charles Emergency Traffic Control Signals
HL-201
The work consists of the installation of new traffic signals, complete and operable,
including but not limited to actuated traffic controller, pull boxes, poles, mast arms,
foundations, conduits, luminaire support, cables, wire, connection fees, coordination with
Entergy and City of Lake Charles Traffic Department, and the removal of existing traffic
signals. This new equipment is to be installed at the intersection as shown on the plans.
Unless otherwise specified, all materials shall be new.
Existing equipment to be removed shall be removed in such manner as to avoid damage
to said equipment, and proper care and protection shall be exercised after its removal.
All incidental parts which are not shown on the plans, or specified herein or in the Special
Provisions, and which are necessary to complete the traffic signal or other electrical
systems or required for modifying existing systems, shall be furnished and installed as
though such parts were shown on the plans or specified herein. All systems shall be
complete and in operation to the satisfaction of the Engineer at the time of final
acceptance.
| 03/30/2021 07:45 PM UTC |
|
Project No. HL-54
City of Lake Charles, Louisiana
Storm Repairs – Old City Hall Interiors
HL - 54
Scope of Work: Restoration of interior finishes damaged during Hurricanes Laura and
Delta.
Work involves removal and reapplication of plaster off of wood lath backing at ceiling
and wall locations throughout. Repair of damaged gypsum drywall assemblies in other
locations. Sanding and refinishing of existing wood floor. New paint and trim stained
throughout. Miscellaneous repairs to plaster walls. Salvage, repair, and reinstallation of
door hardware and fixtures as necessary.
| 03/23/2021 07:45 PM UTC |
|
Project No. HL-02
City of Lake Charles, Louisiana
Hurricane Laura Storm Repairs - Henry Heights Park
HL - 02
The Work includes repairs to existing park facilities including ball fields, concession stands,
restrooms, bleachers and covers.
a. Repair existing bleacher cover structures. Replace damaged bleachers.
b. Chain-link fencing repair/replacement.
c. Repairs to lighting and mechanical systems.
d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing,
flooring, painting etc.
| 03/23/2021 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.