Upcoming Solicitations

Number Deadline
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA SOUTHWEST WATER TREATMENT PLANT BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3414 HMGP GRANT NO. DR-4559-43 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear. • Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch. • Installation of Low Voltage Panelboard for Supply to Generator Appurtenances. • Interconnections to Owner’s SCADA for Generator Monitoring. • Miscellaneous Civil and Electrical Work as Required to Complete the Work.
11/18/2025 08:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
HL-16
HL-16 Downtown Lakefront Electrical City of Lake Charles, LA ~ City of Lake Charles project, ‘HL-16 Downtown Lakefront Electrical’ consist of repair and/or replace electrical components of the downtown / lakefront streetscape identified area lighting as outlined on the contract documents, especially luminaires and light poles. Address specific damage repairs due to the high winds and heavy rain presented by Hurricane Laura, including surge suppression and electrical system distribution products which were compromised.
01/19/2021 08:45 PM UTC
HL-16
City of Lake Charles, Louisiana HL-16 DOWNTOWN LAKEFRONT SITE WORK ~ City of Lake Charles project, ‘HL-16 DOWNTOWN LAKEFRONT SITE WORK’ consist of repair and/or replace of site components of the downtown / lakefront / streetscape identified area. The site work consist of site furniture installation and adjustment, concrete foundation removal and build back, streetscape pavement demolition and repair, brick paving repair, rip rap stone installation, erosion control, installation of flagpoles, as outlined on the contract documents. This project addresses specific damage repairs due to the high winds and heavy rain presented by Hurricane Laura.
01/19/2021 08:45 PM UTC
HL-SOV-053
City of Lake Charles, Louisiana City Hall Roof Repairs (HL-SOV-053) Hurricane Laura Disaster Recovery (DR-4559-LA) ~ I. Scope of Services: Design of roof repairs, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA), to return the roofing system to pre-storm conditions and to upgrade these existing systems to coincide with newly applicable codes, standards, and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: 1. Removal and replacement of the modified bitumen roof assembly 2. Removal and replacement of damaged HVAC units and other damage mechanical accessories 3. Repair and recommissioning of damaged HVAC units which are not deemed to be beyond repair (if applicable) 4. Removal and replacement of the communication tower and its appurtenances 5. Repair of electrical racks, electrical panels, conduit and other associated appurtenances 6. Removal of skid mounted communication building and its appurtenances and removal of steel skid 7. Repair or removal and replacement of all other damages related to Hurricane Laura
01/19/2021 08:45 PM UTC
HL-200
City of Lake Charles, Louisiana City of Lake Charles Emergency Traffic Control Signs HL-200 The Scope for this project is the installation and repair of signs, sign supports, mounts, pads and footings which sustained disaster related damages associated with Hurricane Laura.
01/19/2021 08:45 PM UTC
HL-54
Capital Project No. HL-54 Storm Repairs - Old City Hall Interiors City of Lake Charles, LA ~ Work involves removal and reapplication of plaster off of wood lath backing at ceiling and wall locations throughout. Repair of damaged gypsum drywall assemblies in other locations. Sanding and refinishing of existing wood floor. New paint and trim stained throughout. Miscellaneous repairs to plaster walls. Salvage, repair, and reinstallation of door hardware and fixtures as necessary.
12/22/2020 08:45 PM UTC
CP HL-14
Emergency Reroofing of Lake Charles Civic Center CP HL-14 City of Lake Charles, LA ~ ∙Remove all roofing membrane, metal edge, and associated roof items. ∙Remove original light gauge metal roof deck on Coliseum (Arena) roof and Stage Roof areas only and replace with new 22-gauge steel roof deck. ∙Provide new roofing system with improved drainage and heavy-duty metal edge. ∙Provide roof coating over cap sheet membrane. ∙Replace existing smoke vents at Stage Roof. ∙Replace roof access ladders. ∙Replace light fixtures and walkway. ∙Replace damaged roof vents and equipment. ∙Provide 30 Year NDL warranty edge to edge.
12/22/2020 08:45 PM UTC
Project No. CP3362
City of Lake Charles, Louisiana 2020 Lift Station Rehabilitation – Claire Gardens and Sowela CP 3362 • Claire Gardens Lift Station – Complete rehabilitation to include new pumps, rails, electrical service, controls, and wet well liner. Rerouting of influent sewer mains. Installation of 6 ft. hurricane fence with green privacy slats and construction of concrete access drive. • Sowela Lift Station - Complete rehabilitation to include new pumps, rails, electrical service, controls, and coating of the wet well. Rerouting of influent sewer mains. Demolition of abandoned concrete structures. Fencing to be installed by Sowela building contractor.
12/15/2020 10:30 PM UTC
Project No. 2019-685 (Rebid #2) Capital Project No. 3364
Project No. 2019-685 (Re-Bid) Capital Project No. 3364 2019 Wastewater Pipe Bursting City of Lake Charles, LA The general scope of work is to rehabilitate a total of approximately 5,992 linear feet of existing 8-inch sewer main by pipe bursting at the five (5) project sites listed above. The pipe bursting process is to include 8-inch DR-17 HDPE pipe, all insertion pits, full circle clamps, and tie-ins to manholes. All sewer services shall be reconnected to the main. Also included in the scope is the rehabilitation of approximately 17 manholes and the installation of two (2) new 4-foot diameter fiberglass manholes. The scope includes a post video inspection of each project site. Associated incidental work includes the removal and replacement of approximately 281 square yards of pavement, hydroseeding, and video inspection.
11/17/2020 08:45 PM UTC
Project #HL-59
Hurricane Laura Roof Replacement: Lake Charles Fire Department Station #6 at 4300 Kirkman Street City Project #HL-59 Project Scope: The removal and replacement of all roofing materials as well as associated sheet metal, mechanical, and electrical work.
11/17/2020 08:45 PM UTC
Project #HL-62
Hurricane Laura Roof Replacement: Lake Charles Fire Department Station #1 at 706 Enterprise Boulevard City Project #HL-62 Project Scope: The removal and replacement of all roofing materials as well as associated sheet metal, mechanical, and electrical work.
11/17/2020 08:45 PM UTC