City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
2026-17
Request for Qualifications for Architectural & Engineering Design of Resilient Indoor Multi-Sports & Recreation Complex
| 04/14/2026 07:45 PM UTC |
|
CP3538
City of Lake Charles, Louisiana
Buddy Prejean Park Lighting
CP3538
The overall project will include new field to the existing softball field. The field will be designed for NHSA regulation foot candles. Other miscellaneous components to be provided as per the bid drawings and manual.
| 04/14/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project No. OP 7306 - Fire Station No. 1
City of Lake Charles, Louisiana
Fire Station No. 1 Repairs
OP 7306
Demolition of the East end of the existing fire station project, to include relocation of existing technology equipment; removal of existing radio tower, antenna, and communication equipment; asbestos abatement; removal of existing foundation and designated concrete paving; patching of the roof and walls of existing building at connections where the building is removed; fencing, grading, and site work following demo to finish the area of work.
| 11/05/2019 08:45 PM UTC |
|
Project CP3264
INTERSTATE CORRIDOR BEAUTIFICATION PHASE III
CAPITAL PROJECT NO. 3264
INTERSTATE 210 / HWY. 14 - LaDOTD PERMIT 153883
SCOPE OF WORK
The general scope of work for Project Interstate Corridor Beautification Phase III, Capital Project No. 3264, for LaDOTD Permitted Project No. 153883 for construction includes the following.
Base bid of planting of selective trees, shrubs and performing one (1) maintenance operations per plans and specification for a 90 calendar day construction period.
| 10/15/2019 07:45 PM UTC |
|
Project #OP7306
City of Lake Charles, Louisiana
Fire Station #3 Remodel
Days to Complete Project – 180 Days
Liquidated Damages - $270 Per Calendar Day
Plans – No Charge
The project scope consists of the replacement of finishes throughout the existing fire station. New flooring, painted sheetrock walls, tiles showers, doors & frames, suspended grid ceilings, millwork, and a HVAC system will be provided.
| 10/15/2019 07:45 PM UTC |
|
Capital Project #CP9778
City of Lake Charles, Louisiana
Arcade Amphitheater LED Lighting and Power
Improvements
Capital Project Number CP #9788
Lake Charles Civic Center
Amphitheater Enhancements (LED Lighting & Power Improvements)
ADG #18355-A
The scope of work for the above mentioned project is as follows:
a) Provide 2-200 Amp 3 phase power sources for Amphitheater “show power”.
b) Provide 4 new vendor power pedestals (one each near 4 existing in-ground power boxes).
c) Provide new area lighting as the West End of Millennium Park is lacking illumination. Remove HID Fixtures and poles. All new lighting to be LED.
| 10/15/2019 07:45 PM UTC |
|
CP3343
City of Lake Charles, Louisiana
2019 Lift Station Rehabilitation
CP3343
The project scope of work shall consist of the following:
1. Brentwood
• Replace pumps.
• Replace valves and valve vault. Add bypass connection.
• Replace wet well top slab.
• Coat wet well.
• Replace control panel & switchgear. Add manual transfer switch & SCADA.
• Fence station. Pour concrete inside fence.
2. Third & McNabb
• Replace pumps.
• Replace valves and valve vault. Add bypass connection.
• Replace wet well access hatch.
• Coat wet well.
• Replace control panel & switchgear. Add manual transfer switch & SCADA.
• Add bollards to protect new electrical rack.
• Fence station. Pour concrete inside fence.
3. Fitzenreiter.
• Replace pumps.
• Replace valves. Add bypass connection.
• Replace wet well access hatch.
• Coat wet well.
• Replace control panel & switchgear. Add manual transfer switch & SCADA.
• Extend aggregate driveway to new station fence.
• Fence station. Pour concrete inside fence.
• Add slope protection around station.
| 10/15/2019 07:45 PM UTC |
|
Project No. 2019-692 Capital Project No. 3177
City of Lake Charles, Louisiana
Project No. 2019-692
Capital Project No. 3177
W. Prien Lake Road Widening (Cove Lane to Ihles Road) Clearing and Grubbing
The general scope of work for Project No. 2019-692, W. Prien Lake Widening Cove Lane to Ihles Road – Clearing and Grubbing Phase, is defined as follows:
• The clearing of trees and shrubs located within the existing or newly acquired servitudes and road rights of way located along W. Prien Lake Road between Cove Lane and Ihles Rd and also along Sale Rd from W. Prien Lake to Burton Lane.
• The demolition of the five (5) homes located at 2804 Henderson Forest Lane, 2803 & 2804 S. Locke Point Drive, and 2801 & 2802 N. Locke Point Drive. As well as the associated removal of driveways, sidewalks, pools, sheds, fencing, etc required to completely clear the lots.
All of the work identified above is being done in anticipation of the project to relocate utilities and reconstruct and widen W. Prien Lake Road and Sale Road within the same area.
| 09/17/2019 07:45 PM UTC |
|
Project No. 2018-683 Capital Project No. 3315
City of Lake Charles, Louisiana
Project No. 2018-683
Capital Project No. 3315
Broadmoor Terrace Drainage Improvements
Broadmoor to 9th Avenue
The general scope for Project No. 2018-683, Broadmoor Terrace Drainage Improvements - Broadmoor to 9th Avenue, is the Installation of a storm collection system from the Southeast corner of East Broadmoor Drive Easterly to the Ninth Avenue storm drainage system. The work involves 18 and 15 inch diameter storm drainage pipe, drainage inlets, roadway pavement, and sidewalk removal and replacement, including utility and fence adjustments as needed.
| 08/20/2019 07:45 PM UTC |
|
Project No. 2019-690 Capital Project No. 3335
PROJECT NO. 2019-690
CAPITAL PROJECT NO. 3335
KIRKMAN STREET DRAINAGE REHABILITATION
CITY OF LAKE CHARLES, LA
SCOPE OF WORK
The general scope of work for Project No. 2019-690 includes the replacement of the existing drainage line on the East side of Kirkman Street from Pine Street North to Pryce Street. This existing line is undersized and in poor condition. It will be replaced with new 18” diameter RCP and catch basins. The scope of work also includes the replacement of the sidewalk on the East side of Kirkman and the associated street pavement work.
| 08/20/2019 07:45 PM UTC |
|
Project No. 2019-688 Capital Project No. 3334
City of Lake Charles, Louisiana
Project No. 2019-688
Capital Project No. 3334
Henderson Bayou Bridge Rehabilitation
The general scope of work includes the installation of grout-filled encasement jackets around timber piles, pile bent bracing replacement, and spall repairs on the concrete bridge structure.
| 08/06/2019 07:45 PM UTC |
|
Capital Project No. CP3313
City of Lake Charles, Louisiana
Shattuck Street Bridge
Lake Charles City Capital Project No. CP 3313
Project scope consists of lifting the ends of six 62 foot long Type III girders at the expansion joints (bents 7, 11, 12, 15, 18, and 21) to remove the existing bearing pads and replace them with new bearing pads. Each Type III girder will be lifted at one expansion joint at a time using ten (10) Enerpac RAC-502 (or equivalent) 50 ton hydraulic jacks.
| 08/06/2019 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.