General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA SOUTHWEST WATER TREATMENT PLANT BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3414 HMGP GRANT NO. DR-4559-43 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear. • Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch. • Installation of Low Voltage Panelboard for Supply to Generator Appurtenances. • Interconnections to Owner’s SCADA for Generator Monitoring. • Miscellaneous Civil and Electrical Work as Required to Complete the Work.
11/18/2025 08:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP 3303
City of Lake Charles, LA New Transit Bus Storage Facility CP 3303 The project consists of the new construction of a 7500 square foot pre-engineered metal canopy building and associated site improvements. The contract duration is 180 days with liquidated assessed at a rate of $270.00 dollars per calendar a day.
06/04/2019 07:45 PM UTC
CP3297
City of Lake Charles, Louisiana WWTP A BASIN A-03 REHABILITATION PROJECT CP3297 I. Scope of Services: A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-03. The Work includes, but is not necessarily limited to, the following: 1. Pipe bursting 8080 linear feet of existing 8” and 10” sewer to new 8” and 10”. 2. 30 point repairs to 8” sewer pipe at varying depths 0-12’. 3. 70’ of open cut replacement, 4 point repairs to 18” sewer pipe. 4. Replacement of approximately 132 active sewer service laterals. 5. Coating approximately 350 vertical feet of existing and new manholes. 6. Furnish and Install 3 new manholes.
05/14/2019 07:45 PM UTC
Project No. 2018-680 Capital Project No. 3252
City of Lake Charles, Louisiana Project No. 2018-680 Capital Project No. 3252 2018 CDBG South Roosevelt Drainage Improvements Phase Two ~ The general scope of work for Project No. 2018-680 includes installation of reinforced concrete pipe and catch basins for drainage improvements and pavement work.
04/30/2019 07:45 PM UTC
MAI Project No. B6-18063-DA, CP# 3312
City of Lake Charles, Louisiana 2017 CDBG Infrastructure – Asphalt Overlay of Various Streets MAI Project No. B6-18063-DA Capital Project No. CP3312
04/16/2019 07:45 PM UTC
Project No. 2018-682 Capital Project No. 3283
PROJECT NO. 2018-682 CAPITAL PROJECT NO. 3283 LEGENDRE STREET DRAINAGE PH II CITY OF LAKE CHARLES, LOUISIANA SCOPE OF WORK Project No. 2018-682 includes installation of approximately 470 linear feet of 8x7 box culvert on the East roadside ditch of Legendre Street starting at the downstream end near the Cell tower driveway and extending South tying into the existing box culvert at McNeese Street.
04/16/2019 07:45 PM UTC
Project No. 2019-684, Capital Project No. 3093
City of Lake Charles, Louisiana Project No. 2019-684 Capital Project No. 3093 Maidstone and Woodside Drive Drainage Pipe Rehabilitation The goal of this project is to rehabilitate existing reinforced concrete drain lines on Woodside Drive and Maidstone Drive in the City of Lake Charles, LA with cured-in-place pipe lining.
02/05/2019 08:45 PM UTC
Project No. 2018-672, Capital Project No. 3308
City of Lake Charles, Louisiana Project No. 2018-672 (Capital Project No. 3308) Streetscape – Mill and Division The goal of this project is to enhance pedestrian safety and beautify Mill and Division Streets along the new ERDACE Development from Ryan Street to Ann Street. This will be accomplished by the reconstruction of the sidewalks to include pavers. The scope of work shall also include overhead decorative lamp posts, litter receptacles, drainage and pavement markings.
01/15/2019 08:45 PM UTC
Project No. CP3304
City of Lake Charles, Louisiana College Oaks Park New Restroom Bldg. 3518 Ernest Street, Lake Charles, LA Capital Project Number CP 3304 Scope of Work: Provide a new restroom building at the existing developed park. The new building to be CMU Black walls with wood truss roof system and shingled roofing.
12/18/2018 08:45 PM UTC
CP 3264
City of Lake Charles, Louisiana INTERSTATE CORRIDOR BEAUTIFICATION PHASE II LaDoTD Permit No. 153754 Capital Project Number CP3264 The general scope of work for Project Interstate Corridor Beautification Phase II, Capital Project No. 3264, for LaDOTD Permitted Project No. 153754 for construction includes the following. Base bid of clearing and grubbing of selective trees, planting of trees, and shrubs. Add alternate no. 1 of maintenance operations of selective areas within the interchange by way mowing grass, weed control, volunteer vegetation growth removal, mulching for one year period. See ‘Exhibit A’ identifying the selective areas for maintenance operations.
11/20/2018 08:45 PM UTC
Project No. 2018-678 (PR0002)
City of Lake Charles, Louisiana Project No. 2018-678 (PR0002) North Beach Improvements - Erosion Repair North Beach to Promenade The scope of work includes revetment and shore erosion repair, drainage and piping installation, sidewalk repair, and gutter paving.
11/06/2018 08:45 PM UTC
241 - 250 of 382 Solicitations
1 2 21 22 23 25 27 28 29 38 39