RFP #2026-25
Request for Proposals for Entertainment, Food and Beverage Establishment on the Lakefront
| 07/14/2026 07:45 PM UTC |
|
Capital Project Number 3544
City of Lake Charles
Hodges Street Waterline Extension
Capital Project Number 3544
I. Background:
Homes along Hodges Street are experiencing ongoing low water pressure issues. Existing infrastructure along this section of the distribution system is undersized and unable to adequately meet current household demand, resulting in inconsistent and insufficient water pressure within several homes. By extending and upgrading the waterline, the project will improve system capacity, enhance water flow, and provide more reliable service to affected properties. This improvement is intended to ensure adequate water pressure for daily use and to support long-term reliability of the neighborhood’s water distribution system.
II. Project Scope of Work:
Design and implementation of ~1,500 feet of 6-inch diameter waterline including a looping connection on W. Prien Lake Road and a looping connection on E. Hale Street.
Design Services shall be as per the City of Lake Charles A&E Manual.
| 08/04/2026 07:45 PM UTC |
|
Capital Project No. CP2894
City of Lake Charles, Louisiana
WWTP A McNabb and Cline Street
Emergency Sewer System Rehabilitation
Capital Project No. CP2894
I. Background:
Waggoner Engineering, Inc. (Waggoner) was retained by the City of Lake Charles, Louisiana to evaluate and address deficiencies within the existing sanitary sewer collection system along McNabb Street between Broad Street and Cline Street. Approximately 2,250 linear feet of existing 18-inch reinforced concrete sanitary sewer pipe along McNabb Street has been identified as being in poor structural condition. Observed deficiencies include cracking and joint separation. Due to the severity and extent of the deterioration, the sewer line is no longer suitable for spot repairs or lining and requires full replacement. Rehabilitation of this segment will be performed using pipe bursting methods to install new 18-inch high-density polyethylene (HDPE) pipe, minimizing surface disruption while significantly improving the long-term performance and reliability of the sanitary sewer system.
II. Project Scope of Work:
Design and construction services for the repair and rehabilitation of the existing 18-inch gravity sanitary sewer collection system along McNabb Street, between Broad Street and Cline Street, to address documented system deterioration. Design services shall be as per the City of Lake Charles A&E Manual. The work will include, but is not limited to, the following:
• Replacement of the existing 18-inch gravity sewer main via pipe bursting installation.
• Reinstating of existing sanitary sewer service laterals to the rehabilitated main.
• Furnishing, installation, operation, and maintenance of temporary bypass pumping to maintain continuous sewer service during construction.
| 08/04/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project No. CP3051 LEI Project No. 19-014
CITY OF LAKE CHARLES, LOUISIANA
2019 SUPPLEMENTAL INFRASTRUCTURE-
STRIPING PACKAGE
LAKE CHARLES, LOUISIANA
CITY OF LAKE CHARLES CAPITAL PROJECT NO. CP3051
LEI PROJECT NO. 19-014
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. 12th Street (Hodges Street to 110 Feet East of Highway 14)
2. Alamo Street (Enterprise Boulevard to Ryan Street)
3. Alvin Street (Sallier Street to Shell Beach Drive)
4. Bilbo Street (Kirby Street to Clarence Street)
5. Broad Street (Lakeshore Drive to Enterprise Boulevard)
6. Clarence Street (Ryan Street to Kirkman Street)
7. Cline Street (Albert Street to Highway 171)
8. Common Street (Sale Road to Kirby Street)
9. Creole Street (West Hale Street to Sallier Street)
10. Division Street (Louisiana Avenue to Lakeshore Drive)
11. Eddy Street (Ryan Street to Ernest Street)
12. Ernest Street (Sale Road to Sallier Street)
13. Goos Street (Broad Street to Winterhalter Street)
14. Graham Street (Medora Street to Fiztenreiter Road)
15. Hodges Street (Alamo Street to Belden Street)
16. Jefferson Drive (Lake Street to 2nd University Drive)
17. Kirby Street (Ryan Street to Lakeshore Drive)
18. Kirkman Street (McNeese Street to Opelousas Street)
19. Lake Street (Sale Road to College Street)
20. Legion Street/J. B. Johnston Avenue (Interstate 210 to Honker Street)
21. Louie Street (Lake Street to Ryan Street)
22. Louisiana Avenue (Azalea Street to Prien Lake Road)
23. Main Street (Broad Street to Avenue J)
24. Medora Street (Simmons Street to Highway 171)
25. Merganser Street (J. B. Johnston Avenue to Mallard Cove Drive)
26. Mill Street (Lakeshore Drive to Highway 171)
27. Moeling Street (Enterprise Boulevard to Highway 171)
28. N. Central Parkway (University Drive to Archwood Street)
29. Oak Park Boulevard (Enterprise Boulevard to Highway 171)
30. Opelousas Street (Enterprise Boulevard to Highway 14)
31. Penn Street (Creole Street to Ernest Street)
32. Prater Street (Fiztenreiter Road to South of Jackson Street)
33. Prien Lake Road (Ryan Street to Highway 14)
34. Pujo Street (Enterprise Boulevard to Kirkman Street)
35. Ryan Street (South of Bridge South of Clarence Street to 300 Feet West of River Road)
36. S. Central Parkway (University Drive to Heather Street)
37. Sallier Street (Marine Street to Lake Street)
38. Shattuck Street (Broad Street to Moeling Street)
39. West Hale Street (Creole Street to Ernest Street)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 03/03/2020 08:45 PM UTC |
|
Capital Project Number CP3305
City of Lake Charles, Louisiana
George H. West Water Treatment Plant
Pressure Filter System Rehabilitation (Phase II)
Capital Project Number CP3305
Scope of Services:
The City of Lake Charles desires to improve the existing filter systems at the George H. West Water Treatment Plant to improve the reliability of operation and reduce impact of future issues to the newly rehabilitated filtration system. This Work will include but is not limited to:
1. Removal and replacement of the following automated filter valves and pneumatic actuators:
a. 4" Draindown Valves (Quantity - 6)
b. 6" Air Scour Valves (Quantity - 6)
c. 6" Air Pressurizing Valves (Quantity - 6)
d. 10" Influent Valves (Quantity - 6)
e. 12" Waste Valves (Quantity - 6)
f. 12" Effluent Valves (Quantity - 6)
2. Removal and replacement of damaged nuts and bolts
3. Removal and replacement of wires and conduit, as required.
4. Removal and replacement of PE air tubing, as required.
| 02/18/2020 08:45 PM UTC |
|
Capital Project Number CP 3124
City of Lake Charles, Louisiana
Central School Renovations
Capital Project Number CP 3124
City of Lake Charles, LA ~
Scope of Work
The Work consists of the following:
1. The Work includes exterior cleaning of building, re-pointing all existing masonry walls, painting of all window trim and exterior “non-masonry” materials and all exterior surfaces that have been previously painted including stairs, exterior doors, etc.. Replacement of all gutters and downspouts including flashing at scuppers and repair of roofing at parapet walls, collector heads, and coping.
2. All work shown on drawings and included in Specifications Manual.
3. Contractor is to perform the Work in accordance with pertinent State, Local and National Codes as well as all requirements of OSHA, including the Hazard Communication Standard.
4. This building is a historically significant structure and is on the National Registry of Historic Buildings, therefore the contractor shall at all times follow the Secretary of the Interior’s “Standards for the Treatment of Historic Properties” which describe guidelines for preserving, rehabilitating, restoring and reconstructing of Historic Buildings. These guidelines/documents can be found at the following website: https://www.nps.gov/tps/standards/treatment-guidelines-2017.pdf
| 02/04/2020 08:45 PM UTC |
|
Captial Project Number CP#3294
City of Lake Charles, Louisiana
Southwest Water Plant Chlorine Containment
CP#3294
City of Lake Charles, LA ~
The work for this project includes, but not limited to, improvements to the southwest water treatment plant’s chlorine containment by retrofitting the current method of chlorine storage with a means of secondary containment for the chlorine gas cylinders and demolition of unused existing features of the plant’s chlorine building.
| 12/31/2019 08:45 PM UTC |
|
Project No. CP 3271
Project No. CP 3271
Country Club Water Looping - Weaver Road to Jensen Lane
City of Lake Charles, LA ~
The work for this project includes, but not limited to, installation of approximately 1,550 feet of 12 inch water main on Country Club Road. The proposed waterline will connect the existing 12 inch water main that terminates near the hydrant at 2099 Country Club Road to the existing 12 inch water main that runs along the west side of Weaver Road.
| 12/17/2019 08:45 PM UTC |
|
Capital Project Number CP3295
City of Lake Charles, Louisiana
Southwest Water Treatment Plant
New Ground Storage Tank #2
Capital Project Number CP3295
I. Scope of Services:
The City of Lake Charles desires to replace the existing 3.0 MG steel at the Southwest Water Treatment Plant which is being demolished due to structural failures. In place the existing 3.0 MG GST the City would like to construct a new 2.0 MG concrete ground storage tank to expand the finished water capacity available on site. This Work will include but is not limited to the following:
1. Demolition of the remaining concrete ring wall foundation
2. Excavation of existing subgrade and installation of select fill or granular materials in as defined by the geotechnical investigation.
3. Construction of a new 2.0 MG AWWA D110 Type III concrete ground storage tank.
4. Installation of fill and draw piping to and from the ground storage tank
5. Installation of a remote level indicator and associated instrumentation and controls for tank monitoring and plant control.
6. Miscellaneous site and drainage improvements to accommodate the construction of the new tank.
| 12/17/2019 08:45 PM UTC |
|
Project No. CP3300
City of Lake Charles, Louisiana
2018 Sidewalk Construction
CP 3300
The work for this project includes, but not limited to, installation of a five-foot (5’) sidewalk along the south side of Sale Road between Lake Street and Ryan Street along the existing curb and installation of a six-foot (6’) sidewalk along the south side of Lisle Peters Road between E. St. Charles Avenue and Big Lake Road (LA 384). It also includes the installation of subsurface drainage systems along Lisle Peters Road and the removal and installation of driveways impacted by sidewalk placement.
| 11/19/2019 08:45 PM UTC |
|
Project No. 2019-691 Capital Project No. 3072
City of Lake Charles, Louisiana
Project No. 2019-691
Capital Project No. 3072
Riverside Park Boat Dock Rehabilitation
The general scope of work includes:
1. Removal of existing wooden pier including a portion of existing concrete sidewalk.
2. Installation of new fixed pier and connecting concrete sidewalk.
3. Installation of new gangway, floating concrete dock assembly, and pipe piles.
| 11/05/2019 08:45 PM UTC |
|
Project No. OP 7306 - Fire Station No. 1
City of Lake Charles, Louisiana
Fire Station No. 1 Repairs
OP 7306
Demolition of the East end of the existing fire station project, to include relocation of existing technology equipment; removal of existing radio tower, antenna, and communication equipment; asbestos abatement; removal of existing foundation and designated concrete paving; patching of the roof and walls of existing building at connections where the building is removed; fencing, grading, and site work following demo to finish the area of work.
| 11/05/2019 08:45 PM UTC |
|
Project CP3264
INTERSTATE CORRIDOR BEAUTIFICATION PHASE III
CAPITAL PROJECT NO. 3264
INTERSTATE 210 / HWY. 14 - LaDOTD PERMIT 153883
SCOPE OF WORK
The general scope of work for Project Interstate Corridor Beautification Phase III, Capital Project No. 3264, for LaDOTD Permitted Project No. 153883 for construction includes the following.
Base bid of planting of selective trees, shrubs and performing one (1) maintenance operations per plans and specification for a 90 calendar day construction period.
| 10/15/2019 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.