Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana
Project No. 2024-746
Capital Project No. 3502
Kirby and Hodges Street Sidewalk Repairs
The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
| 07/01/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Project No. 2014-643, Capital Project No. 3217
Project No. 2014-643
Capital Project No. 3217
Water and Sewer Extension on Weaver Road North of Ham Reid Road
City of Lake Charles, LA ~
The general scope of work is the installation of a 12 inch water line from Ham Reid Road North to the Ridge at Lake Charles Apartment Complex, and installation of a 12 inch sewer line from the lift station North of Ham Reid, North approximately 1460 feet.
| 07/14/2015 07:45 PM UTC |
Capital Project No. CP3051
Capital Project No. CP3051
LEI Project No. 15-005
2014-2015 City Wide Striping Project
City of Lake Charles, LA ~
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. 12th Street (Hodges Street to 110 ft. East of Highway 14)
2. Common Street (Sale Road to Kirby Street)
3. North Ryan Street (Belden Street to 300 ft. West on River Road)
4. Dr. Michael DeBakey Drive (Ryan Street to Lake Street)
5. Lake Street (College Street to Sale Road)
6. Rail Road Symbols (Various Locations)
7. Alamo Street (Enterprise Boulevard to Ryan Street)
8. Bilbo Street (Kirby Street to Clarence Street)
9. Clarence Street (Lakeshore Drive to Kirkman Street)10. Derek Drive (Highway 14 to East Prien Lake Road)
11. East Prien Lake Road (Carver Road to East side of Highway 14)
12. Goos Street (Broad Street to Winterhalter Street)
13. Street removed from project
14. Kirkman Street (McNeese Street to Opelousas Street)
15. Sallier Street (Riverside Drive to Hodges Street)
16. Medora Street (Cathy Street to Highway 171)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. Opelousas Street (Enterprise Boulevard to Highway 171)
19. Alvin Street (Sallier Street to Shell Beach Drive)
20. Ernest Street (Sale Road to Sallier Street)
21. Lake Street (Sallier Street to Shell Beach Drive)
22. Merganser Street (J. Bennett Johnston Avenue to Mallard Cove Street)
23. Dillard Loop (Highway 14 to Derek Drive)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. Pineview Street (Highway 171 to Cathy Street)
26. Cathy Street (Alice Street to Medora Street)
27. Mallard Cove Street (Merganser Street to Golf Course)
28. Chennault Parkway (Merganser Street to Dead End)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 06/30/2015 07:45 PM UTC |
Project No. 2013-623, CP No. 3213
Project No. 2013-623
Capital Project No. 3213
Replacement of Approximately 300 Feet of
36” Sewer Line on Penn Street West of Creole Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2013-623 includes replacement of an existing 36 inch gravity sewer main with new 36 inch polypropylene pipe, water line adjustment, installation of manholes, fittings, and tying the new sewer main into the wet well at the existing Penn Street Sewer Lift Station.
| 06/16/2015 07:45 PM UTC |
Capital Project No. CP3005
Capital Project No. CP3005
Lake Charles Downtown
Fiber Network Phase 1
City of Lake Charles, LA ~
The purpose of this project is to build a fiber optic network among various municipal buildings in downtown Lake Charles.
This project has four tasks:
1. Install underground conduit from Ryan Street to City Hall
2. Install underground conduit from Ryan Street to 1911 City Hall
3. Install underground conduit from City Hall to the 911 Building on Hodges Street
4. Install fiber optic cable from City Hall to several downtown buildings.
| 06/16/2015 07:45 PM UTC |
CP3120 Contraband Lift Station Rehabilitation Project
Capital Project No. CP3120
Contraband Lift Station Rehabilitation Project
City of Lake Charles, LA ~
The City of Lake Charles Wastewater Division owns and operates the Contraband Lift Station. Wastewater Division personnel have indicated that at a minimum the following items must be addressed as part of the rehabilitation project:
1. Remove existing pumps/motors and replace with dry pit submersible pumps, and upgrade electrical equipment as needed to accommodate new pumps
2. New pumps are to be equipped with variable frequency drives. Due to the size of these drives, a new slab on grade building will house the drives. This new electrical building will have a brick veneer and architectural shingle roof.
3. In addition to the new electrical building, addition site improvements include new P.C.C. pavement, green slatted hurricane fencing with brick columns, and improvements to the access road leading to the lift station site.
4. All suction and discharge valves are to be replaced with new.
5. Existing wet well is to be cleaned, repaired, and coated.
| 05/05/2015 07:45 PM UTC |
Project No. 2015-644, Capital Project No. 2894
Project No. 2015-644
Capital Project No. 2894
Sale Road Lift Station
Wet Well Wall Structural Rehabilitation
City of Lake Charles, LA ~
Contractor shall provide all materials, all labor, supervision, tools, construction equipment, transportation, services, incidentals and temporary facilities, including electrical power, water, sanitary facilities, offices, and warehouses and other services necessary to construct, complete in place and accepted the new Wet Well Wall Structural Rehabilitation at the Sale Road Lift Station located at 715 W. Sale Road in the City of Lake Charles, Louisiana. All work shall be in accordance with the plans and specifications and/or engineer approved shop drawings.
In general, the work includes, but is not limited to the following:
a. Mobilization
b. Temporary signs and barricades
c. Construct and remove steel sheet pile retaining walls
d. Excavation and disposal of spoils
e. Construct new concrete seal slab
f. Pressure wash the exterior wall surfaces and apply bonding adhesive to the existing wet well walls
g. Construct new concrete exterior wall sections on one side at a time in three (3) lifts per wall.
h. Furnish, place and compact sand backfill
i. Construct aggregate backfill cap at top of fill
j. Remove and replace new 4 foot chain link fence
k. Final cleanup, including hydroseeding
| 03/17/2015 07:45 PM UTC |
Project No. 2011-604B, Capital Project No. 3117
Project No. 2011-604B
Capital Project No. 3117
Holmes Street Bridge Removal
City of Lake Charles, LA ~
The general scope of work includes, but is not limited to, the following items:
(a) The removal of the existing timber bridge originally constructed in 1958;
(b) The construction of a concrete pavement turnaround on the South side of the drainage lateral;
(c) The installation of approximately 225 linear feet of W beam guardrail with end of road object markers as indicated on plans;
(d) The installation of the drainage system consisting of approximately 204 linear feet of 18 diameter RCP, 8 each CB-01 drop inlets and 160 linear feet of 18” diameter corrugated metal pipe;
(e) The construction of 6" thick compacted stone aggregate driveways at two locations.
| 03/17/2015 07:45 PM UTC |
Project No. 2014-640, Capital Project No. 3109
Project No. 2014-640
Capital Project No. 3109
Mallard Cove Golf Course No. 8 Hole Irrigation Pond
Retaining Wall Rehabilitation
City of Lake Charles, LA ~
The general scope of work for Project No. 2014-640 includes installation of a PVC sheet pile retaining wall around a portion of the irrigation pond at the No. 8 hole at Mallard Cove Golf Course.
| 02/18/2015 08:45 PM UTC |
Project No. 2014-634, Capital Project No. 3178
Project No. 2014-634
Capital Project No. 3178
Theriot Street, North Booker Street,
North Adams Street and Woodard Street
Asphalt Overlay and Drainage Improvements
City of Lake Charles, LA ~
The general scope of work for Project No. 2014-634 includes improvements to roadside ditches, patches of full depth asphalt repair; and overlay of the existing asphalt surface.
The project sites for the improvements are Theriot Street from Pear Street to North Adams Street, North Booker Street from Theriot Street to Theriot Street, North Adams Street from Theriot Street to Woodard Street, and Woodard Street from North Adams Street to Simmons Street in the City of Lake Charles, LA.
| 02/18/2015 08:45 PM UTC |
Project No. 2014-OP0402
Project No. 2014-OP0402
Reroofing Fire Station #6
City of Lake Charles, LA ~
Provide all labor, material, equipment, and services necessary to complete the installation of all work shown on the plans and specifications.
Project Summary:
Modified Roof Area
1. Remove existing roof membrane and related sheet metal items down to the wood deck.
2. Repair wood deck as required.
3. Remove drain bowl and drain lines. Close holes with 16 galvanized sheet metal.
4. Loose lay red rosin sheet.
5. Install specified insulation (3” Polyisocyanurate Insulation) with fasteners.
6. Install tapered insulation (1/4” : 12” per foot slope) and recovery board (Six Sided Asphalt Impregnated Wood Fiber) in hot asphalt.
7. Install two-ply, high performance Type III SBS Modified roofing system with granulated surface.
8. Install new metal flashings, expansion joint covers and prefabricated metal edge assembly.
9. Fabricate and install new gutters and downspouts.
10. Provide and install new soffit panel system around perimeter of building.
11. Provide and install sheet metal around existing wood beams.
12. Contractor responsible for all electrical and mechanical work required to complete the specified work. Work may include raising curbs and air conditioning units.
Shingle Roof Area
1. Remove existing shingles and related sheet metal items down to the wood deck.
2. Repair and replace any damaged or rotten decking. Secure loose decking as required.
3. Install specified base sheet over wood deck prior to installing shingles.
4. Set starter shingles in flashing cement.
5. Fabricate and install new drip edge.
6. Fabricate and install new vents.
7. Install new 30 year architectural shingles.
8. Shingle installation shall not commence until modified roof assembly is completed.
9. Issue specified warranty.
| 02/18/2015 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.