General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
DR002
City of Lake Charles, Louisiana Lake Charles Public Works New Facility Phase 2 DR002 Scope of Project Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
02/16/2026 08:45 PM UTC
LCR 401
City of Lake Charles, Louisiana Lock Park Inclusive Playground LCR 401 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to: PROJECT SUMMARY: • The scope of work that is considered base bid includes: o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking; o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees; o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system. • The scope of work that is considered alternates includes: o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle. o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
02/16/2026 08:45 PM UTC
2026-12
Millennium Park Fall Surface Replacement In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center. All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
03/03/2026 08:45 PM UTC
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749 CAPITAL PROJECT NO. 3309 HAM REID ROAD WATERLINE EXTENSION- ELLIOTT RD. TO BIG LAKE RD. CITY OF LAKE CHARLES, LA SCOPE OF WORK: The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
03/03/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Project No. CP3128
Project No. CP3128 WasteWater Treatment Plant B/C Expansion and Rehabilitation Project City of Lake Charles, LA ~ I. Scope of Services: A. Construction of a new WWTP B/C, includes but is not limited to: 1. A new influent pump station with coarse screening and influent pumps. 2. A new headworks structure with fine screening and grit removal. 3. Two (2) new multi-channel oxidation ditches 4. Three (3) new circular final clarifiers 5. A new ultraviolet disinfection facility 6. A new non-potable water system 7. A new return activated sludge / waste activated sludge pump station 8. Two (2) new electrical buildings 9. Demolition of the existing plant facilities as indicated 10. Miscellaneous electrical, instrumentation, civil, etc.
02/16/2016 08:45 PM UTC
Project No. 2014-627, Capital Project No. 3220
Project No. 2014-627 Capital Project No. 3220 City of Lake Charles, LA ~ The general scope of work for Project No. 2014-627 provides for the renovation of the Cleveland Street Sewer Lift Station, including removal and replacement of the two (2) pumps, valves, piping, construction of temporary driveways for two (2) nearby homes; excavating, backfilling, etc., and any other items necessary to provide a complete system which functions properly to the satisfaction of the Project Engineer and Wastewater Department of the City of Lake Charles.
12/15/2015 08:45 PM UTC
Capital Project No. CP3221, LEI Project No. 15-012
Capital Project No. CP3221 LEI Project No. 15-012 2015 Asphalt Overlay of Various Streets City of Lake Charles, LA ~ The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, aggregate surface course shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles: 1. Calcasieu Street (Opelousas Street to Jackson Street) 2. N. Lincoln Street (I-10 Service Road to Jackson Street) 3. N. Jake Street (I-10 Service Road to Jackson Street) 4. N. Simmons Street (I-10 Service Road to Jackson Street) 5. Lisle Peters Road (Big Lake Road to Dead End) 6. N. Adams Street (Moeling Street to Commercial Street) 7. N. Adams Street (Opelousas Street to Dead End)) 8. Sale Road (Canal Street to Lake Street) 9. Raintree Cove (Lisle Peters Road to River Lane) 10. Goodman Road (Broad Street to Highway 90) 11. Louisiana Avenue (McNeese Street to Dead End) 12. Carriage Lane (Lisle Peters Road to River Lane) 13. 3rd Street (Highway 14 to 6th Avenue) 14. 6th Street (Kayouchee Street to McNabb Street) 15. River Lane 16. Creole Street (Prien Lake Road to I-210) 17. Jackson Street (North Simmons Street to Calcasieu Street) 18. Parking Lot Across from City Hall on Pujo Street
11/03/2015 08:45 PM UTC
Capital Project No. CP3072
Capital Project No. CP3072 Riverside Park Phase 2B City of Lake Charles, LA ~ This project will include construction of a new enclosed and conditioned pavilion building, parking area, picnic areas and a new playground. A new dock is included as alternate no 1. The project has a total construction time of 210 calendar days. The project has liquidated damages of $500 per calendar day.
11/03/2015 08:45 PM UTC
Capital Project No. CP3212
Capital Project No. CP3212 1st Avenue Reconstruction Gieffers St. to Moeling St. City of Lake Charles, LA ~ I. Scope of Work: The City of Lake Charles desires to reconstruct four (4) blocks and associated intersections of the 1st Avenue roadway. Reconstruction will consist of existing pavement removal, general excavation, stone base construction and complete PCC pavement reconstruction of the roadway as funds permit not to exceed AFC of $800,000.00. The effected blocks of 1st Avenue upon which work is planned are as follows: i. 1st Avenue PCC Repairs on the existing PCC blocks (Gieffers St. – Moeling Street)
10/20/2015 07:45 PM UTC
Project No. CP3206
Capital Project No. CP3206 WWTP A Basin A-13 Rehabilitation Project City of Lake Charles, LA ~ Scope of Work: A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-13. The Work includes, but is not necessarily limited to, the following: 1. Pipe bursting approximately 11,300 linear feet of existing 6” and 8” sewer to new 8”. 2. Open cut replacement of approximately 5,000 linear feet of existing 6” and 8” sewer to new 8”. 3. Replacement of approximately 350 active sewer service laterals. 4. Coating approximately 160 vertical feet of existing and new manholes.
10/06/2015 07:45 PM UTC
Project No. 2015-646, Capital Project No. 3109
PROJECT NO. 2015-646 CAPITAL PROJECT NO. 3109 MALLARD COVE GOLF COURSE NO. 8 HOLE IRRIGATION POND SLOPE IMPROVEMENTS CITY OF LAKE CHARLES, LA SCOPE OF WORK The general scope of work for Project No. 2015-646 includes improvement of the pond slope near the green for Hole No. 8 at Mallard Cove Golf Course using 3 x 1.5 limestone, as well as required drainage pipe extensions.
09/15/2015 07:45 PM UTC
Project No. 2014-633, Capital Project No. CP3040, State Project No. H.010868
STATE PROJECT NO. H.010868 PROJECT NO. 2014-633 CAPITAL PROJECT NO. 3040 1ST AVENUE MULTI-USE TRAIL PART ONE 12TH STREET TO 7TH STREET CITY OF LAKE CHARLES, LA SCOPE OF WORK The general scope of work for State Project No. H.010868, Project No. 2014-633, 1st Avenue Multi-Use Trail Part One, includes the installation of a new 8 foot wide asphalt trail and the associated concrete sidewalk connectivity enhancements on 1st Avenue from 12th Street North to 7th Street.
09/15/2015 07:45 PM UTC
Project No. CP3003
Capital Project No. 3003 Lake Charles Civic Center Perimeter Power Holiday Lighting Program Phase II City of Lake Charles, LA ~ Provide and installing new in-ground pullboxes with electrical distribution capability in the area in front of the Civic Center (West side of Lakeshore Drive from Civic Center Main Entrance due south to Gill Street) and on south side of Gill Street between Lakeshore Drive and Bord Du Lac. Work includes a new 277/480V Service at Gill Street and Lakeshore Drive with capacity to feed a 480V 3 Phase lift station in the future.
08/18/2015 07:45 PM UTC
Capital Project No. CP3210
Capital Project No. CP3210 Blake, Comeaux, Greinwich Village, and Griffin Coulee Lift Stations Rehabilitation City of Lake Charles, LA ~ I. Scope of Services: A. Blake Lift Station 1. Demolish existing building around station and replace with new hurricane fence with green slats around site. 2. Replace the two existing pumps with new submersible pumps on a rail system. 3. Replace all valves and valve vault lid. Expand valve vault to expose where the two pump discharge pipes combine into a single forcemain and install a permanent bypass connection. 4. Electrical improvements. 5. Coat wet well. B. Comeaux Lift Station 1. Install green slats in existing hurricane fence. 2. Replace the two existing pumps with new submersible pumps on a rail system. 3. Replace all valves. Expand valve vault to install a permanent bypass connection. 4. Electrical Improvements. 5. Coat wet well. C. Greinwich Village Lift Station 1. Demolish existing wooden fence and provide new hurricane fence with green slats. 2. Replace the two existing pumps with new submersible pumps on a rail system. 3. Improve top slab. Coat new wet well. 4. Improve discharge configuration. 5. Replace all valves and evaluate feasibility for permanent bypass connection. 6. Electrical Improvements. 7. Coat wet well. D. Griffin Coulee Lift Station 1. Replace existing double door and windows. 2. Install green slats on existing hurricane fence. 3. Replace existing pumps with new dry pit submersible pumps. 4. Replace all valves. 5. New wet well access hatch. 6. Provide steps with handrail on entry to station. 7. Electrical Improvements. 8. Coat wet well.
08/04/2015 07:45 PM UTC
321 - 330 of 389 Solicitations
1 2 29 30 31 33 35 36 37 38 39