Capital Project No. CP3051
City of Lake Charles, Louisiana
2025 Citywide Striping Package
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3051
LEI Project No. 26-006
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. Southpark Road (McNeese Street to Smith Road)
2. 6th Avenue (12th Street to Broad Street)
3. Hodges Street (Alamo Street to Belden Street)
4. Bilbo Street (S. Railroad Avenue to Clarence Street)
5. Lake Street (Shell Beach Drive to Prien Lake Road)
6. Opelousas Street (Enterprise Boulevard to Highway 171)
7. Fitzenreiter Road (Riverside Park to Highway 171)
8. North Goos Boulevard (Knapp Street to Opelousas Street)
9. Medora Street (Simmons Street to Highway 171)
10. Shattuck Street (Broad Street to Moeling Street)
11. 18th Street (Lake Street to Ryan Street)
12. Enterprise Parkway (Interstate 10 to Katherine Street)
13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road)
14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road)
15. Enterprise Boulevard (12th Street to Prien Lake Road)
16. Broad Street (Lakeshore Drive to Enterprise Boulevard)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. 6th Street (4th Avenue to Highway 14)
19. Mill Street (Lakeshore Drive to Highway 14)
20. Common Street (McNeese Street to Prien Lake Road)
21. Lake Street (Prien Lake Road to McNeese Street)
22. Kirkman Street (Jackson Street to McNeese Street)
23. Alamo Street (Ryan Street to Enterprise Boulevard)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. 12th Street (Highway 14 to Hodges Street)
26. Sallier Street (Lake Street to Hodges Street)
27. Ernest Street (Sale Road to Sallier Street)
28. Jefferson Drive (University Drive to University Drive)
29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road)
30. General Doolittle Avenue (Highway 14 to General Twining Street)
31. Alvin Street (Sallier Street to Shell Beach Drive)
32. 18th Street (Enterprise Boulevard to Highway 14)
33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive)
34. Russell Street (12th Street to Hillcrest Drive)
35. Hillcrest Drive (Highway 14 to Russell Street)
36. N. Prater Street (Knapp Street to Fitzenreiter Road)
37. Pear Street (Knapp Street to Fitzenreiter Road)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 11/17/2026 08:45 PM UTC |
|
2027-04
Maintenance of City of Lake Charles Customer-Owned Lighting
| 11/17/2026 08:45 PM UTC |
|
Capital Project Number CP3453
CITY OF LAKE CHARLES, LOUISIANA
HAZARD MITIGATION GRANT PROGRAM (HMGP)
LIFT STATION BACK-UP POWER IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3453
HMGP PROJECT NUMBER DR-4559-0043
I. Scope of Services:
Contractor shall complete Work as specified and indicated in the Contract Documents for Lift Station Back-Up Power Improvements (Capital Project No. CP3453). This Work includes, but is not limited to, the following:
• Install of Automatic Transfer Switches & Stand-By Diesel Generators at Lift Stations.
• Miscellaneous Work including civil, mechanical, structural, & electrical components required to fully execute the Work.
| 11/17/2026 08:45 PM UTC |
|
Capital Project No. 3508
City of Lake Charles, Louisiana
Project No. 2024-745
Capital Project No. 3508
Riverside Park Shoreline
Protection – Phase One
The general scope of work for this project includes the restoration and protection of approximately 250 linear feet of shoreline near the entrance of Riverside Park. This restorative work includes placement of stone revetment to rebuild the riverbank, repair/replacement of existing decorative black fence compromised from erosion, and installation of approximately 100 linear feet of steel sheet pile for bank protection near the gate entrance.
| 11/17/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project No. 2016-651 Capital Project No. 3223
Project No. 2016-651
Capital Project No. 3223
Power Centre Sewer Improvements
Lift Stations and Force Mains
From East Prien Lake Road South to McNeese Farm Road
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-651 includes the upgrades to the existing lift station on East Prien Lake Road, East of Kayouche Coulee and installation of a new sewer lift station on Power Centre Parkway including new force mains. The scope of work also includes the installation of some gravity sewer mains with manholes.
| 04/04/2017 07:45 PM UTC |
|
Capital Project Number CP 3245
City of Lake Charles, Louisiana
Southwest Water Treatment Plant
Finished Water Storage and High Service Pump Station Expansion
Capital Project Number CP 3245
I. Scope of Services:
A. Expansion of the Southwest Water Treatment Plant, includes but is not limited to:
1. One (1) new 2.0 Million Gallon Type III, wire‐wrapped prestressed concrete tank.
2. One (1) new high service pump complete with motor starter and tie‐ins into the
existing spares within the existing control panel.
3. One (1) new pump control valve and associated controls for the new high service
pump.
4. One (1) new tank mixing system and associated air piping.
5. Interconnection site piping to and from new water storage tank.
6. A new header assembly to the high service pump station from the new and existing
tank.
7. A complete recoating of the existing high service pumps, valves, header, etc from the
existing ground storage tank to the termination of the discharge header within the
pump and filter building.
8. Demolition of the existing facilities as indicated.
9. Miscellaneous electrical, instrumentation, civil, etc.
| 03/14/2017 07:45 PM UTC |
|
Project No. 2016-659, Capital Project No. 3227
Project No. 2016-659
Capital Project No. 3227
West Prien Lake Road 12" Water Line Extension
Swanson Lane East to Bertha Lane
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-659, West Prien Lake Road 12” Water Line Extension – Swanson Lane East to Bertha Lane, includes the installation of approximately 800 feet of 12 inch dia. water main along the North side of West Prien Lake Road.
| 01/17/2017 08:45 PM UTC |
|
Project No. 2015-645, Capital Project No. 3160
Project No. 2015-645
Capital Project No. 3160
6th Avenue Reconstruction
Broad Street to 3rd Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2015-645, Sixth Avenue Reconstruction – Broad Street to 3rd Street, includes the following:
(a) Reconstruction of roadways;
(b) Storm drainage improvements;
(c) Water Distribution System;
(d) Sewer Line
(e) Sidewalks
| 12/06/2016 08:45 PM UTC |
|
Capital Project No. CP3234
Capital Project No. CP3234
SALLY MAE STREET ASPHALT OVERLAY
AND DRAINAGE IMPROVEMENTS
GEIFFERS STREET TO CESSFORD STREET
City of Lake Charles, LA ~
The City of Lake Charles desires to improve the road surface and drainage conditions to portions of Sally Mae Street. Construction of the new asphalt overlay and drainage network generally consists of removal and replacement of driveway pavement, initial asphalt patching prior to overlay, closing in of ditches, and installation of new drainage piping and catch basins in the following locations as funds permit and not to exceed AFC of $343,000:
i. Sally Mae Street from Geiffers Street to Cessford Street.
| 12/06/2016 08:45 PM UTC |
|
Capital Project No. CP3243
Capital Project No. CP3243
WWTP A BASIN A-12 REHABILITATION PROJECT
City of Lake Charles, LA ~
A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed.
C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-12. The Work includes, but is not necessarily limited to, the following:
1. Pipe bursting 10,930 linear feet of existing 6” and 8” sewer to new 8”.
2. Open cut replacement of 3,248 linear feet of existing 6” and 8” sewer to new 8”.
3. Replacement of approximately 265 active sewer service laterals.
4. Coating approximately 80 vertical feet of existing and new manholes.
| 12/06/2016 08:45 PM UTC |
|
Capital Project No. CP3249
WWTP A 36-INCH TRUNK LINE REHABILITATION PROJECT
CAPITAL PROJECT NO. CP3249
City of Lake Charles, LA ~
A. Approximately 1,200 linear feet of the 36-inch trunk line from the south end of N. Bilbo St. to the head of WWTP A is severely corroded and in need of repair.
B. This scope of work covers the rehabilitation of the 36-inch trunk line. The Work includes, but is not necessarily limited to, the following:
1. Rehabilitation of 930 LF of 36-inch pipe using cured in place lining method.
2. Dig and replace 267 LF of 36-inch pipe.
3. Coating of three 6-ft diameter manholes and one junction box.
| 12/06/2016 08:45 PM UTC |
|
Project No. 2016-653
Project No. 2016-653
24” Sewer Main Extension on LA-14
From McNeese Street North to McNeese Farm Road
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-653, includes the installation of a 24” sewer main extension by open cut and jack and bore, as well as precast concrete sewer manholes with interior liners.
| 11/15/2016 08:45 PM UTC |
|
Project No. CP3240
Capital Project No. CP3240
3rd Avenue Sidewalk Improvements
12th Street to Broad Street
City of Lake Charles, LA ~
The City of Lake Charles desires to provide new sidewalks and repair existing sidewalks on the east and west sides of 3rd Avenue, including the associated intersections for thirteen (13) consecutive blocks. Construction of new sidewalks generally consists of removal of driveway pavement, damaged or non ADA compliant sidewalk pavement, and general excavation required to construct a 5-ft wide, ADA compliant, sidewalk with handicap accessible ramps in the following locations as funds permit and not to exceed AFC of $503,000.00 - The east and west sides of 3rd Avenue from 12th Street to Broad Street.
| 10/04/2016 07:45 PM UTC |
|
Project No. CP3226
Project No. CP3226
Lake Charles Civic Center Improvements - Part 3
City of Lake Charles, LA ~
A. The Work as defined in the General Conditions and described in the Contract Documents prepared by the Architect is summarized as follows:
LAKE CHARLES CIVIC CENTER
IMPROVEMENTS - PART 3
B. Renovations to existing second floor office space for new Meeting Rooms/Bridal Suites, and Conference Room.
C. Renovations to existing Dressing Rooms at North end of Coliseum.
| 09/06/2016 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.