OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-190221, 2001 Polaris - Roof Replacement P2
Work includes coating of metal roof panels and parapets along with miscellaneous exterior and interior work, located at 2001 Polaris Parkway, Columbus Ohio 43240.
12/17/2020 07:00 PM UTC
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
12/15/2020 07:00 PM UTC
OSU-190783, Morrill Tower - Fire Alarm Replacement
The work consists of the removal and replacement of existing fire alarm systems in Morrill Tower with new, addressable systems, replacement of the resident advisor intercom system, and addition of a building DAS (distributed antenna system). Related work includes the addition of a fire command center on the first floor, hazardous materials abatement related directly to the scope of work in the contract documents other than the resident sleeping rooms, and patching/painting of walls at removed equipment. Provide overall project management and coordination with the abatement contractor efforts in the resident dormitory pods.
12/11/2020 06:00 PM UTC
OSU-190875, Riffe - Room 647 Renovation
The renovation of a 1175 SF of existing labs and mechanical room to accommodate owner provided equipment. Project includes relocation of two sinks and upgrades to architectural finishes and mechanical, electrical and lab gases. Coordination with owner provided equipment and casework required.
12/08/2020 07:00 PM UTC
OSU-200493, Doan - IT Room Life & Safety
Doan Hall, 410 W. 10th Ave: This project will include upgrading the HVAC and lighting systems in the 45’s series IT rooms Doan Hall.
12/01/2020 07:00 PM UTC
OSU-190192, Lincoln Tower Office Renovations
The Project consists of interior renovations to support new offices on the 12th floor of Lincoln Tower on The Ohio State University’s main campus. The renovation consists of new interior partitions, along with new mechanicals, plumbing and electrical equipment throughout the entire floor. The construction timeline will be separated into two phases: 12th Floor Phase 1 – November 28th thru January 8th 12th Floor Phase 2 – May 15th thru August 30th 247 days for entire contract from NTP with a 127 days break between 01/08/2021 and 05/15/2021.
11/17/2020 07:00 PM UTC
OSU-200601, 1224 Kinnear Rd - Generator
OSU Main Campus: The purpose of this project is to install a standby generator and automatic transfer switch to serve the entire building. The existing generator shall be removed. The existing service entrance equipment shall be rebuilt to eliminate the six existing main switches and instead provide a single main disconnect switch.
11/03/2020 07:00 PM UTC
OSU-190141, Sea Grant - Stone Laboratory
OSU Stone Laboratory, South Bass Island: The project will add ~3,500 sq ft of laboratory and support space to the Research Building at Peach Point on South Bass Island.
10/22/2020 06:00 PM UTC
OSU-200307, Family Medicine and Mammography - Pickerington
Renovation approximately 11,000 SF for tenant lease space on the second floor. Space to have two separate entrances for Family Medicine and Mammography. The Family Medicine space will also contain an Optometry clinic.
09/29/2020 06:00 PM UTC
OSU-200218, Celeste - Room 36 Nexus Laser Renovation (REBID)
REBID: The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.