The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-210283 Mansfield - Recreation Center Fire Alarm Upgrade
This project will provide new manual, addressable, voice, ADA compliant fire alarm system in the Recreation Center on the OSU Mansfield Campus.
| 01/18/2022 07:00 PM UTC |
|
OSU-210282 Mansfield - Boiler Replacement
OSU Mansfield Campus:
Campus Recreation Center - Remove existing boiler. Install 2 high efficiency boilers, pumps, and expansion tank. Eisenhower Memorial Center - Remove existing boilers. Install 2 high efficiency boilers, abatement and 2 alternates
| 01/18/2022 07:00 PM UTC |
|
OSU-210285 - Mansfield - Building Entries Renewal and Renovation
Replace selected existing main entrance vestibules, doors, storefront, ADA hardware and miscellaneous exterior concrete slabs at the following buildings: Campus Recreation Center (1729 University Drive) and Eisenhower Memorial Hall (1640 University Drive) located on The Ohio State University’s Mansfield Campus, Mansfield, Ohio, Richland Country.
| 01/18/2022 07:00 PM UTC |
|
OSU-210289, Newark - HVAC Renovations
The work includes the replacement of an existing packaged RTU on the first floor roof of Hopewell Hall. The existing unit is a packaged DX cooling unit with hot water heat. The new unit will be of like design. Existing duct connection points to remain in the same place. Electrical power to RTU equipment will be replaced. Lightning protection system will be extended to new RTU. The single ply membrane roof system will require modifications to allow for the new unit and duct. A small portion of roof railing for fall protection.
| 01/11/2022 07:00 PM UTC |
|
OSU-200104 HVAC Replacements FY 2020 Project REBID
This project will renovate and update building HVAC systems in buildings constructed after 1999.
| 12/16/2021 07:00 PM UTC |
|
OSU-210119, 600 & 610 Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
| 12/10/2021 07:00 PM UTC |
|
OSU-210308, Evans Hall - Pathology Space
Renovations to select areas of the existing 1st and 2nd floors of Evans Hall to create more functional program spaces and support the College of Medicine, Department of Pathology.
| 12/09/2021 07:00 PM UTC |
|
OSU-210180, Aerospace Research Center - Rm 121 Upgrades
Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
| 12/02/2021 07:00 PM UTC |
|
OSU-210473 National Pan-Hellenic Council (NPHC) Garden
Project will include the sitework for the construction of a garden area including earthwork and excavation, seat walls, plaza pavements, monument foundations, soils, and landscaping.
| 12/02/2021 07:00 PM UTC |
|
OSU-210404, Newark - Hopewell Hall Improvements
OSU Newark: Project includes renovating a set of restrooms to make them meet ADA and update the finishes. Creation of a gender-neutral restroom will be added near the existing restroom bank.
| 12/02/2021 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.