The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
OSU-160978, Fire System Replacements Phase 2 (BP-02)
The work consists of the removal and replacement of existing fire alarm systems in Hayes Hall with new, addressable systems. Related work includes hazardous material abatement related directly to fire alarm installation, and patching/painting of walls at removed
equipment.
| 03/24/2020 05:00 PM UTC |
OSU-190980, 395 W 12th - 3rd Floor Renovation
The project will renovate 1,400 SF at the east end of the suite to provide a new Administration Wing and Chair’s Office, which will include relocating existing walls, minor HVAC, and relocating light fixtures. Additionally, the remainder of the floor, approximately 7,200 SF, will receive finish upgrades, including painting and flooring.
| 03/20/2020 06:00 PM UTC |
OSU-180800, Marion - Alber Student Center Renovation
OSU Marion Campus: Renovation of the Student Center at Marion Campus of The Ohio State University.
| 03/18/2020 06:00 PM UTC |
OSU-180803, Marion - Campus Building Envelope
OSU Marion Campus: Improvements to the Morrill Hall building envelope.
| 03/18/2020 05:00 PM UTC |
OSU-200028, Rhodes - Domestic Water Riser Replacement
This project includes the replacement of the domestic water risers from ground to 5th floors in Rhodes Hall.
| 03/17/2020 06:00 PM UTC |
OSU-180802, Marion - Apshalt Paving
OSU Marion Campus: This project includes 2,223 square yards of full pavement reconstruction, 9,837 square yards of pavement resurfacing, curb and sidewalk replacement, pavement markings, guardrail replacement, and other related work.
| 03/11/2020 06:00 PM UTC |
OSU-190066 - REBID
OSU-190066 - REBID
OSU HVAC Replacements FY 2019 – Phase 2, Rebid
This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
Arps Hall: Removal of building chillers and connection to campus chilled water loop.
Drinko Hall: Replacement of existing building chillers, cooling towers, pumps, controls. Modification of AHU controls and outside air arrangement. Addition of DOAS unit and associated ductwork, etc.
Blankenship Hall: Replacement of 5 packaged rooftop units and terminal box DDC controls
Derby Hall: Replacement of terminal box DDC controls
| 03/06/2020 06:00 PM UTC |
OSU-190775, Prior - 3rd Floor Renovation
The project involves designing renovations to the 3rd floor of Prior Hall to create student study areas for the College of Medicine and the Health Sciences Library.
| 03/03/2020 07:00 PM UTC |
OSU-190122 Infrastructure Improvements
This project will make various site improvements across the Columbus campus.
| 02/28/2020 07:30 PM UTC |
OSU-200064, Hagerty - 1st Floor Classrooms and Lecture Hall
Interior renovations in two classrooms and the Lecture Hall in Hagerty, 1st Floor.
| 02/26/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.