OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190394, Wooster - Seed Storage
OSU Wooster Campus: Provide and install a complete, operational 12’x36’x9’H walk-in environmental unit with two, equally-sized interior spaces. Provide all indicated infrastructure modifications indicated on plans
| 06/29/2021 06:00 PM UTC |
|
OSU-210176. Arps Hall 168T, 178T and 180T Improvements
Renovate approximately 455 SF of toilet rooms on the first floor of Arps Hall located at 1945 N. High Street in Columbus, Ohio. The project scope includes Rooms 168T, and a combination of 178T and 180T. The scope of the renovations will reconfigure the existing toilet rooms identified above: to transform the current Women’s toilet room 168T into a new ADA compliant Multi-User Men’s Toilet Room and to combined Rooms of 178T a current Women’s toilet room and 180T a current Men’s toilet room into a new ADA compliant Multi-User Women’s Toilet Room. The existing janitor’s closet, Room 180J, will also be modified.
| 06/29/2021 06:00 PM UTC |
|
OSU-200437, Howlett Hoop House Replacements (REBID)
Columbus Campus: Site modifications, structure demolition and construction of new prefabricated Hoop Houses for The Ohio State University as described in the documentation issued by and Ford & Associates Architects, Inc. dated June 3, 2021.
| 06/22/2021 06:00 PM UTC |
|
OSU-200685, Wooster - Pathways & Civic Infrastructure Improvements
OSU Wooster: This project encompasses 3 individual sites that help to connect the CFAES Wooster campus to the Ohio Agricultural Research and Development Center and Agricultural Technical Institute. A proposed 5-foot concrete walk will connect the Skou parking lot to the ATI administration building (site 1) and will include grading, pavement removal, extension of existing storm pipe, addition of ADA ramps and landscape. A proposed 10-foot asphalt multi-use path will connect the residential area to both the Skou lot (site 2) and the new science building (site 3), this work will include pavement removal, grading, addition of a catch basin, addition of ADA ramps, and landscape.
| 06/09/2021 06:00 PM UTC |
|
OSU-200279, CBEC - NMR Lab Safety Shield
The work consists of Enabling work for the installation of a 1.2 GHz NMR (magnet) in the existing basement NMR Lab, including:
• Temporary removal of portions of the existing suspended ACT ceiling and light fixtures above the future NMR.
• Installation of electromagnetic shielding on Unistrut above the future NMR.
• Installation of a secondary lower layer of Unistrut to support relocated electrical conduit, junction boxes and ACT ceiling below the shielding.
• Temporary removal of 2 doors and an overhead coiling door to allow for delivery and installation of the magnet (NMR) by others.
• Installation of an access platform around the existing magnet once it is installed by others.
| 06/07/2021 06:00 PM UTC |
|
OSU-200437, Howlett Hoop House Replacements
Columbus Campus: Site modifications, structure demolition and construction of new prefabricated Hoop Houses for The Ohio State University as described in the documentation issued by and Ford & Associates Architects, Inc. dated March 31, 2021.
| 05/11/2021 06:00 PM UTC |
|
OSU-200518, Doan-Exterior Brick Repair
OSU Main Campus: The project includes repairs to the exterior brick masonry façade at the east end of the north elevation of Doan Hall. The masonry repairs include the replacement of the through-wall flashing at shelf angles/lintels, isolated shelf angle replacement, brick masonry replacement at isolated distress, installation of brick masonry infill at former air conditioning units, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent. Additionally, the project includes installation of new storm windows at operable portions of the existing windows. The work is divided into 2 phases presented as follows:
Base Bid – Phase 1: West
Alternate 1 – Phase 2: Central
| 04/27/2021 06:00 PM UTC |
|
OSU-200604, Wooster - Selby Hall Elevator Replacement (Rebid)
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
| 04/21/2021 06:00 PM UTC |
|
OSU-200548, MMP Tower HVAC Plan - REBID
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
| 04/15/2021 06:00 PM UTC |
|
OSU-200104 HVAC Replacements FY 2020
RPAC/PEAS/McCorkle: Update Siemens Controls
Knowlton Hall: Update Siemens Controls
Davis Heart and Lung: Delta Controls Replacements
Parker Food Science and Technology: Delta Controls Replacements Veterinary Med Academic: Delta Controls Replacements
Scott Laboratory: Delta Laboratory Controls Replacement
| 04/09/2021 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.