General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-210119, 600 & 610 Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
12/10/2021 07:00 PM UTC
OSU-210308, Evans Hall - Pathology Space
Renovations to select areas of the existing 1st and 2nd floors of Evans Hall to create more functional program spaces and support the College of Medicine, Department of Pathology.
12/09/2021 07:00 PM UTC
OSU-210180, Aerospace Research Center - Rm 121 Upgrades
Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
12/02/2021 07:00 PM UTC
OSU-210473 National Pan-Hellenic Council (NPHC) Garden
Project will include the sitework for the construction of a garden area including earthwork and excavation, seat walls, plaza pavements, monument foundations, soils, and landscaping.
12/02/2021 07:00 PM UTC
OSU-210404, Newark - Hopewell Hall Improvements
OSU Newark: Project includes renovating a set of restrooms to make them meet ADA and update the finishes. Creation of a gender-neutral restroom will be added near the existing restroom bank.
12/02/2021 07:00 PM UTC
OSU-200666, Riffe - 6th Floor Labs Renovation
Interior renovations of existing labs 603, 609, 611, 637, 639, 643, and room 620. Renovations consist of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems associated with the renovation.
11/29/2021 07:00 PM UTC
OSU-210336, Evans Lab - 3021/3023 Grad Rooms
Renovate approximately 752 SF of the third floor of Evans Lab, at 88 West 18th Avenue, Columbus, OH. The project scope includes the following Rooms on the Third Floor: 3021 and 3023. The scope of the project is to convert existing lab spaces into office areas to accommodate graduate student workspaces. The renovation will upgrade finishes, plumbing for a new coffee station with sink, minor alterations to HVAC throughout the project area, provide new lighting, and additional power as required to accommodate workstations. Alternate G-1 to provide and install new flooring, remove existing window coverings and provide and install new roller shades. Alternate H-1 to remove existing sheet metal cover and provide and install new finned tube cover.
11/22/2021 07:00 PM UTC
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
11/17/2021 07:00 PM UTC
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
11/10/2021 07:00 PM UTC
OSU-210040, BSH - Thoracic Team Room
The project will consist of the construction of thoracic exam rooms, team rooms, general offices, CTPL lab space and associated fire protection, HVAC, plumbing and electrical work; located on the ground and second floors of the brain and spine hospital. Locations of work include the renovation of suite 214 for the new thoracic team room with a breakroom. Relocated phone triage in 049. Renovations of suite 234 to include (5) new exam rooms. Relocate the CPTL lab to the existing storage room in room 022 on the ground floor. Relocation of the CTO research staff offices to the existing conference room 087.
11/09/2021 07:00 PM UTC
251 - 260 of 608 Solicitations
1 2 22 23 24 26 28 29 30 60 61