General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
08/21/2025 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
09/03/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-210094 Oxley's By The Numbers Plaza Phase 2
This project is the second phase of the plaza renovation.
03/11/2021 07:30 PM UTC
OSU- 190127 Water Meter Back Flow Preventerw Solicitation (24)
This project will install a back flow preventers at the two main City of Columbus domestic water meters. (1) Intersection of Lane and Olentangy River Road (2) Intersection of John Herrick Drive and Olentangy River Road
03/10/2021 07:30 PM UTC
OSU-190128 Envelope Modernization
This project will restore plazas and envelopes. McCorkle Aquatic Pavilion, Physical Activity and Education Services Recreation and Physical Activity Center
02/25/2021 07:00 PM UTC
OSU-190512, Dodd - Window Replacement
Removal and replacement of existing windows and interior sills on the first, second, third, fourth, and fifth floors. Work includes selective demolition and repair of interior partitions, sills, and soffits to accommodate new window systems and sills.
02/22/2021 07:00 PM UTC
OSU-200604, Wooster - Selby Hall Elevator Replacement
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
01/12/2021 07:00 PM UTC
OSU-170719, Canfield - Loading Dock
Canfield – Loading Dock The Work includes complete demolition of the existing loading dock service elevator, expansion of exterior loading dock area: to add ramp, widen stair, relocate existing dumpsters, and provide new screen walls to improve exterior aesthetics and wayfinding at Canfield Hall. Minor remodeling alterations of interior spaces include: widening of existing basement door, limited existing corridor finishes, and adding a second door to existing supply room located in the Basement Floor of the Canfield Hall, an existing residence hall at the Ohio State University, Columbus, Ohio.
01/06/2021 07:00 PM UTC
OSU-190126 Water Meter Installation FY2019
This project will install domestic cold water meters. Multiple locations on OSU Main Campus
01/05/2021 06:00 PM UTC
OSU-190221, 2001 Polaris - Roof Replacement P2
Work includes coating of metal roof panels and parapets along with miscellaneous exterior and interior work, located at 2001 Polaris Parkway, Columbus Ohio 43240.
12/17/2020 07:00 PM UTC
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
12/15/2020 07:00 PM UTC
OSU-190783, Morrill Tower - Fire Alarm Replacement
The work consists of the removal and replacement of existing fire alarm systems in Morrill Tower with new, addressable systems, replacement of the resident advisor intercom system, and addition of a building DAS (distributed antenna system). Related work includes the addition of a fire command center on the first floor, hazardous materials abatement related directly to the scope of work in the contract documents other than the resident sleeping rooms, and patching/painting of walls at removed equipment. Provide overall project management and coordination with the abatement contractor efforts in the resident dormitory pods.
12/11/2020 06:00 PM UTC
251 - 260 of 570 Solicitations
1 2 22 23 24 26 28 29 30 56 57