The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-200377, Waterman Dairy Improvements
Renovations to the existing Waterman Main Dairy Barn to convert the existing tie stall barn to a free stall barn with new robotic milking, feed, and manure systems. The project will also upgrade the building electrical service and add a new generator.
| 06/22/2022 06:00 PM UTC |
|
OSU-190279, Wooster - GDAL Swine Finishing
Wooster Campus: Provide and install a new prefabricated, modular building structure, site preparation and all supporting utility infrastructure.
| 06/21/2022 06:00 PM UTC |
|
OSU-210096, Doan-Rhodes - Replace Imaging Equipment REBID
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase One – the Zee MP and Spect CT areas; Phase Two – the Agile area; and Phase Three – the technician work area.
| 06/21/2022 06:00 PM UTC |
|
OSU-200183 Med Center Traffic Control Devices
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
| 06/15/2022 03:00 PM UTC |
|
OSU-220611 11th Avenue Conversion - Bid Package 1
Convert 11th Avenue to two way traffic between Neil Ave and College Road and add bus stops.
| 06/14/2022 06:00 PM UTC |
|
OSU-200102 Enhanced Maintenance
This project includes the rehabilitation of building enclosure elements at Lazenby Hall and replacement of the clay tile roof. The roof replacement will include new flashings and drainage elements, and reuse the clay roof tiles. The Alternate scope of work includes isolated masonry repairs.
| 06/10/2022 06:00 PM UTC |
|
OSU-190122 Infrastructure Improvements 1 BP II
Bid Package 2 - Cockins Hall ramp and loading dock repairs
| 05/27/2022 06:00 PM UTC |
|
OSU-150031, OSU African-American Extension Center (Community Project)
Renovation of 4,892 SF of the OSU African-American Community Extension Center located at 905 Mount Vernon Avenue, Columbus, Ohio. The project scope includes: The removal of an existing computer lab, three (3) offices and an equipment storage area to create a new flexible Computer Lab, a new Classroom, new ADA family Toilet Room and new open Gathering/Library Space. See also Alternates.
| 05/24/2022 06:00 PM UTC |
|
OSU-160917, Wooster - Campus Identification
OSU Wooster Campus: Removal of existing masonry campus identification sign, fabrication and installation of large internally illuminated campus identification sign, and construction of masonry wall with engraved pre-cast sign panel.
| 05/11/2022 06:00 PM UTC |
|
OSU-210288, Marion - Building Standby Generator Replacements
OSU Marion Campus: Remove existing interior, natural gas generators, associated transfer switches and distribution equipment at Morrill Hall and the Library Classroom Building.
Provide a new emergency natural gas generator exterior to Morrill Hall. Provide new transfer switches and distribution for emergency and standby loads.
Provide a new emergency natural gas generator exterior to Library Classroom Building. Provide new transfer switches and distribution for emergency and standby loads.
| 05/11/2022 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.