General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-210271 Road/Bridge Improvements BP 1
Project includes improvements to College Road between Woodruff Avenue and 18th Avenue. Improvements to College Road include installation of curb ramps, installation of bus lane, replacement or installation of sidewalk, full depth replacement of pavement, replacement of curb, lighting, and storm sewer improvements.
02/22/2022 02:00 PM UTC
OSU-200101-BP 3
West Campus Infrastructure Phase 1 Bid Package 3- Provide infrastructure and lane widening for Kenny Road
02/21/2022 04:00 PM UTC
OSU-210273 Infrastructure Renewal
Project includes removal of existing storm infrastructure and replacement with new infrastructure along with some new storm sewers. Project is located near intersection of Tuttle Park Place and W 17th Avenue.
02/18/2022 04:00 PM UTC
OSU-220049, Outpatient Gahanna, Pelvic Health Renovation
Renovation of approximately 3,600 square feet of tenant space of the Pelvic Health clinic located at Outpatient Gahanna. The renovation is the conversion of an existing nuclear camera suite, restroom, stress lab, hot lab, tech space, prep areas, sub waiting and phone triage rooms into a PT gym with large team room. The plan converts existing offices, reading room and echo lab into additional exam rooms. It reworks nurses station into clean and soil rooms and adds storage areas. The project contains several bid alternates allowing the suite to be refreshed in the new OSUWMC finish standards.
02/17/2022 07:00 PM UTC
OSU-210338, Bevis Hall - 3rd Flr SIM Center Relocation
OSU Columbus Campus: The renovation of approximately 3,692 SF of existing office space on the 3rd Floor of Bevis Hall located at 1080 Carmack Road, in Columbus, Ohio. The project scope includes the following Rooms: Base Bid: Third Floor - 317, 341, 371, 386, 387, 389, 390, 393, 394, 397, 398, X305C and X307C. The scope of the project is to create an open and collaborative work environment and upgrade finishes throughout the project area. Alternate G-1: Provide and install new paint on exposed existing concrete structure in Room 315.
02/15/2022 07:00 PM UTC
OSU-210296, PAST Innovation Lab
The PAST Foundation Interior renovations consisting of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems.
02/04/2022 07:00 PM UTC
OSU-210116, 610 Ackerman Warehouse
HVAC, Fire Suppression, and electrical upgrades; safety, security, and accessibility upgrades; limited interior construction including new plumbing facilities.
01/31/2022 07:00 PM UTC
OSU-210180, Aerospace Research Center - Rm 121 Upgrades (REBID)
OSU Columbus Campus: Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
01/24/2022 07:00 PM UTC
OSU-191035 Field Hockey Press Box
This Project will provide demolition, new site work and building construction of the Field Hockey Press Box located on the West side of the existing Buckeye Field.
01/20/2022 07:00 PM UTC
OSU-210283 Mansfield - Recreation Center Fire Alarm Upgrade
This project will provide new manual, addressable, voice, ADA compliant fire alarm system in the Recreation Center on the OSU Mansfield Campus.
01/18/2022 07:00 PM UTC
251 - 260 of 622 Solicitations
1 2 22 23 24 26 28 29 30 62 63