The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
| 04/06/2026 06:00 PM UTC |
|
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
| 04/08/2026 06:00 PM UTC |
|
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas
storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
| 04/10/2026 06:00 PM UTC |
|
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
| 04/16/2026 06:02 PM UTC |
|
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
| 04/23/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190192, Lincoln Tower Office Renovations
The Project consists of interior renovations to support new offices on the 12th floor of Lincoln Tower on The Ohio State University’s main campus. The renovation consists of new interior partitions, along with new mechanicals, plumbing and electrical equipment throughout the entire floor.
The construction timeline will be separated into two phases:
12th Floor Phase 1 – November 28th thru January 8th
12th Floor Phase 2 – May 15th thru August 30th
247 days for entire contract from NTP with a 127 days break between 01/08/2021 and 05/15/2021.
| 11/17/2020 07:00 PM UTC |
|
OSU-200601, 1224 Kinnear Rd - Generator
OSU Main Campus: The purpose of this project is to install a standby generator and automatic transfer switch to serve the entire building. The existing generator shall be removed. The existing service entrance equipment shall be rebuilt to eliminate the six existing main switches and instead provide a single main disconnect switch.
| 11/03/2020 07:00 PM UTC |
|
OSU-190141, Sea Grant - Stone Laboratory
OSU Stone Laboratory, South Bass Island: The project will add ~3,500 sq ft of laboratory and support space to the Research Building at Peach Point on South Bass Island.
| 10/22/2020 06:00 PM UTC |
|
OSU-200307, Family Medicine and Mammography - Pickerington
Renovation approximately 11,000 SF for tenant lease space on the second floor. Space to have two separate entrances for Family Medicine and Mammography. The Family Medicine space will also contain an Optometry clinic.
| 09/29/2020 06:00 PM UTC |
|
OSU-200218, Celeste - Room 36 Nexus Laser Renovation (REBID)
REBID: The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
| 09/24/2020 06:00 PM UTC |
|
OSU-190385, Parks-Room 145 Renovation (REBID)
OSU Columbus Campus: (REBID) Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
| 09/02/2020 06:00 PM UTC |
|
OSU-200218, Celeste - Room 36 Nexus Laser Renovation
The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. The lab space will be cleanroom ISO 7 classification. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
| 08/27/2020 06:00 PM UTC |
|
OSU-190385, Parks - Room 145 Renovation
OSU Columbus Campus: Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
| 08/18/2020 06:00 PM UTC |
|
OSU-190881, Doan - 9 North Office Reconfiguration
3,000 square foot interior renovation providing a reconfiguration of existing administrative offices on the 9th floor of Doan Hall. New interior floor, wall, window shades and ceiling finishes are provided with corresponding upgrades to the existing mechanical, electrical power, lighting, data, fire alarm and fire suppression systems. Upgrades to the existing temperature control pneumatic and isolation values connecting to new thermostats are also a part of the scope of work if Alternates G1and H1 are accepted by the Owner. The work will be performed in 2 Phases.
| 08/11/2020 06:00 PM UTC |
|
OSU-180707 Ag Admin Chiller Replacment
Remove water cooled chiller, cooling tower, condenser water pump, condenser water tank and associated piping and controls.
Remove multizone air handler, piping and controls.
Provide new air cooled condensing unit on roof, piping and controls.
Provide new multizone air handler, piping and controls.
Provide new direct digital controls.
Hazardous material abatement.
| 08/04/2020 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.