The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
| 04/06/2026 06:00 PM UTC |
|
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
| 04/08/2026 06:00 PM UTC |
|
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas
storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
| 04/10/2026 06:00 PM UTC |
|
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
| 04/16/2026 06:02 PM UTC |
|
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
| 04/23/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190128 Envelope Modernization
This project will restore plazas and envelopes. McCorkle Aquatic Pavilion, Physical Activity and Education Services
Recreation and Physical Activity Center
| 02/25/2021 07:00 PM UTC |
|
OSU-190512, Dodd - Window Replacement
Removal and replacement of existing windows and interior sills on the first, second, third, fourth, and fifth floors. Work includes selective demolition and repair of interior partitions, sills, and soffits to accommodate new window systems and sills.
| 02/22/2021 07:00 PM UTC |
|
OSU-200604, Wooster - Selby Hall Elevator Replacement
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
| 01/12/2021 07:00 PM UTC |
|
OSU-170719, Canfield - Loading Dock
Canfield – Loading Dock
The Work includes complete demolition of the existing loading dock service elevator, expansion of exterior loading dock area: to add ramp, widen stair, relocate existing dumpsters, and provide new screen walls to improve exterior aesthetics and wayfinding at Canfield Hall. Minor remodeling alterations of interior spaces include: widening of existing basement door, limited existing corridor finishes, and adding a second door to existing supply room located in the Basement Floor of the Canfield Hall, an existing residence hall at the Ohio State University, Columbus, Ohio.
| 01/06/2021 07:00 PM UTC |
|
OSU-190126 Water Meter Installation FY2019
This project will install domestic cold water meters. Multiple locations on OSU Main Campus
| 01/05/2021 06:00 PM UTC |
|
OSU-190221, 2001 Polaris - Roof Replacement P2
Work includes coating of metal roof panels and parapets along with miscellaneous exterior and interior work, located at 2001 Polaris Parkway, Columbus Ohio 43240.
| 12/17/2020 07:00 PM UTC |
|
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
| 12/15/2020 07:00 PM UTC |
|
OSU-190783, Morrill Tower - Fire Alarm Replacement
The work consists of the removal and replacement of existing fire alarm systems in Morrill Tower with new, addressable systems, replacement of the resident advisor intercom system, and addition of a building DAS (distributed antenna system). Related work includes the addition of a fire command center on the first floor, hazardous materials abatement related directly to the scope of work in the contract documents other than the resident sleeping rooms, and patching/painting of walls at removed equipment. Provide overall project management and coordination with the abatement contractor efforts in the resident dormitory pods.
| 12/11/2020 06:00 PM UTC |
|
OSU-190875, Riffe - Room 647 Renovation
The renovation of a 1175 SF of existing labs and mechanical room to accommodate owner provided equipment. Project includes relocation of two sinks and upgrades to architectural finishes and mechanical, electrical and lab gases. Coordination with owner provided equipment and casework required.
| 12/08/2020 07:00 PM UTC |
|
OSU-200493, Doan - IT Room Life & Safety
Doan Hall, 410 W. 10th Ave:
This project will include upgrading the HVAC and lighting systems in
the 45’s series IT rooms Doan Hall.
| 12/01/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.