General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/14/2025 06:00 PM UTC
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
05/20/2025 06:00 PM UTC
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001 Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
05/21/2025 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-190066 PH 2 BP 1
HVAC Replacements FY 2019 – Phase 2, Bid Package 1 This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
01/28/2020 06:00 PM UTC
OSU-190066 PH 2 BP 2
HVAC Replacements FY 2019 – Phase 2, Bid Package 2 This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
01/28/2020 06:00 PM UTC
OSU-160929, Lima - Standby Generators, BP#2
OSU Lima Campus: The project consists of providing a new generator and associated automatic transfer switch for the Perry Webb Student Life building. The project will include all plumbing and mechanical work required for the electrical scope to be completed.
01/27/2020 07:00 PM UTC
OSU-180785, Lima - Reed Restroom Renovation
Lima Campus: Renovation of two public restrooms adjacent to the theater lobby. The following items are a part of the restroom renovation within the scope of the project: provide accessible toilets, refresh interior finishes and design plumbing fixture replacement, update accessories and improve lighting.
01/21/2020 07:00 PM UTC
OSU-180764, Mansfield - Conard Hall Labs (REBID)
OSU Mansfield Campus: Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
01/15/2020 07:00 PM UTC
OSU-191003, Aero Research Ctr - Room 121 Electric
Provide and install a new electrical service for equipment testing. Service shall be 277/480V – 3000A.
01/14/2020 07:00 PM UTC
OSU-190291, Bolz - 4th Floor Renovation (REBID)
REBID: Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
01/06/2020 07:00 PM UTC
OSU-180764, Mansfield - Conard Hall Labs
OSU Mansfield Campus: Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
12/12/2019 07:00 PM UTC
OSU-190819, Rhodes - Room M212A MRI
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
12/04/2019 07:00 PM UTC
OSU-180712, University - Suites 247 and 250 Renovation (REBID)
REBID: The renovation of approximately 9,404 SF of office area on the 2nd Floor of University Hall located at 230 N. Oval Mall, in Columbus, Ohio. The project scope includes three (3) Office suites 247, 250 and 214. Flooring material, prep and installation will be through State Contract. Office/Conference glass entry fronts, by DIRTT, materials and installation will be through State Contract.
12/03/2019 07:00 PM UTC
291 - 300 of 558 Solicitations
1 2 26 27 28 30 32 33 34 55 56