The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-210473 National Pan-Hellenic Council (NPHC) Plaza
This project will construct a National Pan-Hellenic Council Plaza adjacent to Hale Hall at OSU Columbus Campus.
| 03/02/2022 07:00 PM UTC |
|
OSU-210271 Road/Bridge Improvements BP 1
Project includes improvements to College Road between Woodruff Avenue and 18th Avenue. Improvements to College Road include installation of curb ramps, installation of bus lane, replacement or installation of sidewalk, full depth replacement of pavement, replacement of curb, lighting, and storm sewer improvements.
| 02/22/2022 02:00 PM UTC |
|
OSU-200101-BP 3
West Campus Infrastructure Phase 1
Bid Package 3- Provide infrastructure and lane widening for Kenny Road
| 02/21/2022 04:00 PM UTC |
|
OSU-210273 Infrastructure Renewal
Project includes removal of existing storm infrastructure and replacement with new infrastructure along with some new storm sewers. Project is located near intersection of Tuttle Park Place and W 17th Avenue.
| 02/18/2022 04:00 PM UTC |
|
OSU-220049, Outpatient Gahanna, Pelvic Health Renovation
Renovation of approximately 3,600 square feet of tenant space of the
Pelvic Health clinic located at Outpatient Gahanna. The renovation
is the conversion of an existing nuclear camera suite, restroom,
stress lab, hot lab, tech space, prep areas, sub waiting and phone
triage rooms into a PT gym with large team room. The plan converts
existing offices, reading room and echo lab into additional exam
rooms. It reworks nurses station into clean and soil rooms and adds
storage areas. The project contains several bid alternates allowing
the suite to be refreshed in the new OSUWMC finish standards.
| 02/17/2022 07:00 PM UTC |
|
OSU-210338, Bevis Hall - 3rd Flr SIM Center Relocation
OSU Columbus Campus: The renovation of approximately 3,692 SF of existing office space on the 3rd Floor of Bevis Hall located at 1080 Carmack Road, in Columbus, Ohio. The project scope includes the following Rooms: Base Bid: Third Floor - 317, 341, 371, 386, 387, 389, 390, 393, 394, 397, 398, X305C and X307C. The scope of the project is to create an open and collaborative work environment and upgrade finishes throughout the project area. Alternate G-1: Provide and install new paint on exposed existing concrete structure in Room 315.
| 02/15/2022 07:00 PM UTC |
|
OSU-210296, PAST Innovation Lab
The PAST Foundation
Interior renovations consisting of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems.
| 02/04/2022 07:00 PM UTC |
|
OSU-210116, 610 Ackerman Warehouse
HVAC, Fire Suppression, and electrical upgrades; safety, security, and accessibility upgrades; limited interior construction including new plumbing facilities.
| 01/31/2022 07:00 PM UTC |
|
OSU-210180, Aerospace Research Center - Rm 121 Upgrades (REBID)
OSU Columbus Campus: Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
| 01/24/2022 07:00 PM UTC |
|
OSU-191035 Field Hockey Press Box
This Project will provide demolition, new site work and building construction of the Field Hockey Press Box located on the West side of the existing Buckeye Field.
| 01/20/2022 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.