OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-210336, Evans Lab - 3021/3023 Grad Rooms
Renovate approximately 752 SF of the third floor of Evans Lab, at 88 West 18th Avenue, Columbus, OH. The project scope includes the following Rooms on the Third Floor: 3021 and 3023. The scope of the project is to convert existing lab spaces into office areas to accommodate graduate student workspaces. The renovation will upgrade finishes, plumbing for a new coffee station with sink, minor alterations to HVAC throughout the project area, provide new lighting, and additional power as required to accommodate workstations. Alternate G-1 to provide and install new flooring, remove existing window coverings and provide and install new roller shades. Alternate H-1 to remove existing sheet metal cover and provide and install new finned tube cover.
| 11/22/2021 07:00 PM UTC |
|
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
| 11/17/2021 07:00 PM UTC |
|
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
| 11/10/2021 07:00 PM UTC |
|
OSU-210040, BSH - Thoracic Team Room
The project will consist of the construction of thoracic exam rooms, team rooms, general offices, CTPL lab space and associated fire protection, HVAC, plumbing and electrical work; located on the ground and second floors of the brain and spine hospital. Locations of work include the renovation of suite 214 for the new thoracic team room with a breakroom. Relocated phone triage in 049. Renovations of suite 234 to include (5) new exam rooms. Relocate the CPTL lab to the existing storage room in room 022 on the ground floor. Relocation of the CTO research staff offices to the existing conference room 087.
| 11/09/2021 07:00 PM UTC |
|
OSU-210254, Ross - 1st Floor Restrooms
Renovation of the existing public restrooms located on the first floor of Ross Heart Hospital, 452 West 10the Avenue in Columbus, Ohio. The project scope includes Rooms H1209T Women’s Restroom (255 SF), H1210T Men’s Restroom (198 SF), as well as the entry space located before each restroom (36 SF each). The scope of the renovations will upgrade finishes in the existing spaces identified above. Alternate G-1 is to replace the existing drinking fountain with new, along with panel screens so that it complies with ADA.
| 11/01/2021 06:00 PM UTC |
|
OSU-200234, Parks Hall - Suite 531 Renovation
OSU Main Campus: The Ohio State University, Parks Hall – Suite 531 Renovation. Work can be characterized best as “laboratory” renovations.
| 10/25/2021 06:00 PM UTC |
|
OSU-200104
OSU HVAC Replacements FY 2020
This project will renovate and update building HVAC systems in buildings constructed after 1999.
| 10/20/2021 06:00 PM UTC |
|
OSU-200666, Riffe-6th Floor Labs Renovation
OSU Main Campus - Interior renovations of existing labs 603, 609, 611, 637, 639, 643, and room 620. Renovations consist of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems associated with the renovation.
| 10/13/2021 06:00 PM UTC |
|
OSU-210030, Outpatient Gahanna - Neurology Renovation
Renovation of approximately 2,470 square feet of tenant space of the Neurology Suite located at Outpatient Gahanna. The renovation is the conversion of an existing infusion space into exam rooms, team rooms, and support space.
| 10/12/2021 06:00 PM UTC |
|
OSU-210360, Sisson Domestic Water Loop
The Project consists of the installation of an 8-inch domestic cold waterline in the Sisson Hall parking lot that cross connects with the 20-inch OSU domestic cold waterline on the east side of Olentangy River Road. The line will be installed via a jack and bore method and will be connected to the existing OSU 20-inch OSU main domestic cold water line using a tapping sleeve per OSU BDS Division 33.
| 09/30/2021 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.