General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-200548, MMP Tower HVAC Plan
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
03/26/2021 06:00 PM UTC
OSU-200101 West Campus Infrastructure Phase 1 BID PACKAGE 2
This project will provide infrastructure to support building projects in the west campus area, including WMC West Campus Ambulatory Facilities, Energy Advancement and Innovation Center, and the Interdisciplinary Research Facility. Improvements include additional vehicular lanes, modified/new intersection signalization, surface parking lots, and internal access roads. Utility work includes sanitary sewer, stormwater and water service extension.
03/26/2021 03:00 PM UTC
OSU-190877, Parks - Room 345 Renovation
OSU Main Campus: The project includes the renovation of Suite 335 and 345 in Parks Hall for the College of Pharmacy, approximately 3,400 square feet. The work includes selective interior demolition, abatement, and infrastructure demolition for the renovation of new research laboratories and support spaces. Scope of work includes new interior partitions, finishes, HVAC infrastructure upgrades, power/data distribution and lighting associated with the renovated spaces, new and modified plumbing associated with the renovated spaces.
03/23/2021 06:00 PM UTC
OSU-210094 Oxley's By The Numbers Plaza Phase 2
This project is the second phase of the plaza renovation.
03/11/2021 07:30 PM UTC
OSU- 190127 Water Meter Back Flow Preventerw Solicitation (24)
This project will install a back flow preventers at the two main City of Columbus domestic water meters. (1) Intersection of Lane and Olentangy River Road (2) Intersection of John Herrick Drive and Olentangy River Road
03/10/2021 07:30 PM UTC
OSU-190128 Envelope Modernization
This project will restore plazas and envelopes. McCorkle Aquatic Pavilion, Physical Activity and Education Services Recreation and Physical Activity Center
02/25/2021 07:00 PM UTC
OSU-190512, Dodd - Window Replacement
Removal and replacement of existing windows and interior sills on the first, second, third, fourth, and fifth floors. Work includes selective demolition and repair of interior partitions, sills, and soffits to accommodate new window systems and sills.
02/22/2021 07:00 PM UTC
OSU-200604, Wooster - Selby Hall Elevator Replacement
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
01/12/2021 07:00 PM UTC
OSU-170719, Canfield - Loading Dock
Canfield – Loading Dock The Work includes complete demolition of the existing loading dock service elevator, expansion of exterior loading dock area: to add ramp, widen stair, relocate existing dumpsters, and provide new screen walls to improve exterior aesthetics and wayfinding at Canfield Hall. Minor remodeling alterations of interior spaces include: widening of existing basement door, limited existing corridor finishes, and adding a second door to existing supply room located in the Basement Floor of the Canfield Hall, an existing residence hall at the Ohio State University, Columbus, Ohio.
01/06/2021 07:00 PM UTC
OSU-190126 Water Meter Installation FY2019
This project will install domestic cold water meters. Multiple locations on OSU Main Campus
01/05/2021 06:00 PM UTC
271 - 280 of 593 Solicitations
1 2 24 25 26 28 30 31 32 59 60