The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
| 08/21/2025 06:00 PM UTC |
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
| 09/03/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-190881, Doan - 9 North Office Reconfiguration
3,000 square foot interior renovation providing a reconfiguration of existing administrative offices on the 9th floor of Doan Hall. New interior floor, wall, window shades and ceiling finishes are provided with corresponding upgrades to the existing mechanical, electrical power, lighting, data, fire alarm and fire suppression systems. Upgrades to the existing temperature control pneumatic and isolation values connecting to new thermostats are also a part of the scope of work if Alternates G1and H1 are accepted by the Owner. The work will be performed in 2 Phases.
| 08/11/2020 06:00 PM UTC |
OSU-180707 Ag Admin Chiller Replacment
Remove water cooled chiller, cooling tower, condenser water pump, condenser water tank and associated piping and controls.
Remove multizone air handler, piping and controls.
Provide new air cooled condensing unit on roof, piping and controls.
Provide new multizone air handler, piping and controls.
Provide new direct digital controls.
Hazardous material abatement.
| 08/04/2020 05:00 PM UTC |
OSU-190128 Envelope Modernization
RPAC, McCorkle Pavilion and Larkins Plaza -This project will restore plazas and envelopes.
| 08/03/2020 06:00 PM UTC |
OSU-190008 Road and Bridge Improvements, FY19-Bid Package No-02
This project will mill and fill, and improve sidewalks and curbs
| 07/31/2020 06:30 PM UTC |
OSU-190124
This project will replace fixtures, water piping inside the building and improve water service and the hot water source.
| 06/19/2020 05:00 PM UTC |
OSU-190125 Electrical Renovation FY 2019
Bioscience: Replace (2) existing MCCs in the 10th floor mechanical penthouse with new MCCs and distribution panels in new locations. Provide code required separation of life safety and standby loads with new automatic transfer switch, manual transfer switch, and new panelboards.
Derby Hall: Replace existing MCC with new MCC in same location in room 0010M.
Dreese Lab: Replace (2) existing MCCs with new MCCs in same locations. (1) In room 036M & (1) in room 936M.
Research Center: Replace (3) existing service entrance unit-substations with new service entrance rated double ended switchgear with tie breaker and (2) exterior primary transformers. Replace existing feeders and electrical distribution equipment throughout the building.
| 06/17/2020 05:00 PM UTC |
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
| 06/08/2020 06:00 PM UTC |
OSU-180729, Postle - Cafe
Two room, 715 SF Café located in Postle Hall on the Main campus of the Ohio State University. The project scope includes general construction, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, kitchen equipment, and finishes.
| 05/20/2020 06:00 PM UTC |
OSU-190130
Envelope Renovation - This project will redesign the loading dock on the west elevation of the building.
| 05/15/2020 06:00 PM UTC |
OSU-190120
Emergency Generator Renewal FY2019 Emergency generator replacement at Sisson and Wiseman Halls, diesel tank removal at Sisson Hall
| 05/08/2020 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.