The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190221, 2001 Polaris - Roof Replacement P2
Work includes coating of metal roof panels and parapets along with miscellaneous exterior and interior work, located at 2001 Polaris Parkway, Columbus Ohio 43240.
| 12/17/2020 07:00 PM UTC |
|
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
| 12/15/2020 07:00 PM UTC |
|
OSU-190783, Morrill Tower - Fire Alarm Replacement
The work consists of the removal and replacement of existing fire alarm systems in Morrill Tower with new, addressable systems, replacement of the resident advisor intercom system, and addition of a building DAS (distributed antenna system). Related work includes the addition of a fire command center on the first floor, hazardous materials abatement related directly to the scope of work in the contract documents other than the resident sleeping rooms, and patching/painting of walls at removed equipment. Provide overall project management and coordination with the abatement contractor efforts in the resident dormitory pods.
| 12/11/2020 06:00 PM UTC |
|
OSU-190875, Riffe - Room 647 Renovation
The renovation of a 1175 SF of existing labs and mechanical room to accommodate owner provided equipment. Project includes relocation of two sinks and upgrades to architectural finishes and mechanical, electrical and lab gases. Coordination with owner provided equipment and casework required.
| 12/08/2020 07:00 PM UTC |
|
OSU-200493, Doan - IT Room Life & Safety
Doan Hall, 410 W. 10th Ave:
This project will include upgrading the HVAC and lighting systems in
the 45’s series IT rooms Doan Hall.
| 12/01/2020 07:00 PM UTC |
|
OSU-190192, Lincoln Tower Office Renovations
The Project consists of interior renovations to support new offices on the 12th floor of Lincoln Tower on The Ohio State University’s main campus. The renovation consists of new interior partitions, along with new mechanicals, plumbing and electrical equipment throughout the entire floor.
The construction timeline will be separated into two phases:
12th Floor Phase 1 – November 28th thru January 8th
12th Floor Phase 2 – May 15th thru August 30th
247 days for entire contract from NTP with a 127 days break between 01/08/2021 and 05/15/2021.
| 11/17/2020 07:00 PM UTC |
|
OSU-200601, 1224 Kinnear Rd - Generator
OSU Main Campus: The purpose of this project is to install a standby generator and automatic transfer switch to serve the entire building. The existing generator shall be removed. The existing service entrance equipment shall be rebuilt to eliminate the six existing main switches and instead provide a single main disconnect switch.
| 11/03/2020 07:00 PM UTC |
|
OSU-190141, Sea Grant - Stone Laboratory
OSU Stone Laboratory, South Bass Island: The project will add ~3,500 sq ft of laboratory and support space to the Research Building at Peach Point on South Bass Island.
| 10/22/2020 06:00 PM UTC |
|
OSU-200307, Family Medicine and Mammography - Pickerington
Renovation approximately 11,000 SF for tenant lease space on the second floor. Space to have two separate entrances for Family Medicine and Mammography. The Family Medicine space will also contain an Optometry clinic.
| 09/29/2020 06:00 PM UTC |
|
OSU-200218, Celeste - Room 36 Nexus Laser Renovation (REBID)
REBID: The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
| 09/24/2020 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.