General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-190130
Envelope Renovation - This project will redesign the loading dock on the west elevation of the building.
05/15/2020 06:00 PM UTC
OSU-190120
Emergency Generator Renewal FY2019 Emergency generator replacement at Sisson and Wiseman Halls, diesel tank removal at Sisson Hall
05/08/2020 05:00 PM UTC
OSU-200457
Oxley’s By the Numbers Plaza - Renovation of Oxley plaza
05/07/2020 06:30 PM UTC
OSU-200101
Description West Campus Infrastructure Phase 1- Provide infrastructure to support west campus facilities.
04/01/2020 06:30 PM UTC
OSU-190129
HEATING HOT WATER RENOVATIONS RPAC Building This project will install new heat exchangers in RPAC, which supply heating hot water to RPAC, McCorkle, and PAES Buildings. Also included will be removal of condensate return pumps, new condensate transfer pump and flash tank, variable frequency drives for the existing primary pumps and DDC controls.
03/27/2020 06:00 PM UTC
OSU-190180, Morehouse Tower - 7th-8th Floor Updates
The project consists of renovating the 7th and 8th Floors of the Martha Morehouse Outpatient Care Tower, part of The Ohio State University Wexner Medical Center. The 7th Floor will be renovated in Phase 1, and the 8th Floor will be renovated in Phase 2. Existing finishes, fire protection, mechanicals, power and lighting will be modified in the areas of work. Additionally, a new air handling unit will be provided and installed in the mechanical room on each floor.
03/27/2020 06:00 PM UTC
OSU-160978, Fire System Replacements Phase 2 (BP-02)
The work consists of the removal and replacement of existing fire alarm systems in Hayes Hall with new, addressable systems. Related work includes hazardous material abatement related directly to fire alarm installation, and patching/painting of walls at removed equipment.
03/24/2020 05:00 PM UTC
OSU-190980, 395 W 12th - 3rd Floor Renovation
The project will renovate 1,400 SF at the east end of the suite to provide a new Administration Wing and Chair’s Office, which will include relocating existing walls, minor HVAC, and relocating light fixtures. Additionally, the remainder of the floor, approximately 7,200 SF, will receive finish upgrades, including painting and flooring.
03/20/2020 06:00 PM UTC
OSU-180800, Marion - Alber Student Center Renovation
OSU Marion Campus: Renovation of the Student Center at Marion Campus of The Ohio State University.
03/18/2020 06:00 PM UTC
OSU-180803, Marion - Campus Building Envelope
OSU Marion Campus: Improvements to the Morrill Hall building envelope.
03/18/2020 05:00 PM UTC
331 - 340 of 622 Solicitations
1 2 30 31 32 34 36 37 38 62 63