OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190130
Envelope Renovation - This project will redesign the loading dock on the west elevation of the building.
| 05/15/2020 06:00 PM UTC |
|
OSU-190120
Emergency Generator Renewal FY2019 Emergency generator replacement at Sisson and Wiseman Halls, diesel tank removal at Sisson Hall
| 05/08/2020 05:00 PM UTC |
|
OSU-200457
Oxley’s By the Numbers Plaza - Renovation of Oxley plaza
| 05/07/2020 06:30 PM UTC |
|
OSU-200101
Description
West Campus Infrastructure Phase 1- Provide infrastructure to support west campus facilities.
| 04/01/2020 06:30 PM UTC |
|
OSU-190129
HEATING HOT WATER RENOVATIONS RPAC Building This project will install new heat exchangers in RPAC, which supply heating hot water to RPAC, McCorkle, and PAES Buildings. Also included will be removal of condensate return pumps, new condensate transfer pump and flash tank, variable frequency drives for the existing primary pumps and DDC controls.
| 03/27/2020 06:00 PM UTC |
|
OSU-190180, Morehouse Tower - 7th-8th Floor Updates
The project consists of renovating the 7th and 8th Floors of the Martha Morehouse Outpatient Care Tower, part of The Ohio State University Wexner Medical Center. The 7th Floor will be renovated in Phase 1, and the 8th Floor will be renovated in Phase 2. Existing finishes, fire protection, mechanicals, power and lighting will be modified in the areas of work. Additionally, a new air handling unit will be provided and installed in the mechanical room on each floor.
| 03/27/2020 06:00 PM UTC |
|
OSU-160978, Fire System Replacements Phase 2 (BP-02)
The work consists of the removal and replacement of existing fire alarm systems in Hayes Hall with new, addressable systems. Related work includes hazardous material abatement related directly to fire alarm installation, and patching/painting of walls at removed
equipment.
| 03/24/2020 05:00 PM UTC |
|
OSU-190980, 395 W 12th - 3rd Floor Renovation
The project will renovate 1,400 SF at the east end of the suite to provide a new Administration Wing and Chair’s Office, which will include relocating existing walls, minor HVAC, and relocating light fixtures. Additionally, the remainder of the floor, approximately 7,200 SF, will receive finish upgrades, including painting and flooring.
| 03/20/2020 06:00 PM UTC |
|
OSU-180800, Marion - Alber Student Center Renovation
OSU Marion Campus: Renovation of the Student Center at Marion Campus of The Ohio State University.
| 03/18/2020 06:00 PM UTC |
|
OSU-180803, Marion - Campus Building Envelope
OSU Marion Campus: Improvements to the Morrill Hall building envelope.
| 03/18/2020 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.