OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190385, Parks-Room 145 Renovation (REBID)
OSU Columbus Campus: (REBID) Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
| 09/02/2020 06:00 PM UTC |
|
OSU-200218, Celeste - Room 36 Nexus Laser Renovation
The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. The lab space will be cleanroom ISO 7 classification. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
| 08/27/2020 06:00 PM UTC |
|
OSU-190385, Parks - Room 145 Renovation
OSU Columbus Campus: Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
| 08/18/2020 06:00 PM UTC |
|
OSU-190881, Doan - 9 North Office Reconfiguration
3,000 square foot interior renovation providing a reconfiguration of existing administrative offices on the 9th floor of Doan Hall. New interior floor, wall, window shades and ceiling finishes are provided with corresponding upgrades to the existing mechanical, electrical power, lighting, data, fire alarm and fire suppression systems. Upgrades to the existing temperature control pneumatic and isolation values connecting to new thermostats are also a part of the scope of work if Alternates G1and H1 are accepted by the Owner. The work will be performed in 2 Phases.
| 08/11/2020 06:00 PM UTC |
|
OSU-180707 Ag Admin Chiller Replacment
Remove water cooled chiller, cooling tower, condenser water pump, condenser water tank and associated piping and controls.
Remove multizone air handler, piping and controls.
Provide new air cooled condensing unit on roof, piping and controls.
Provide new multizone air handler, piping and controls.
Provide new direct digital controls.
Hazardous material abatement.
| 08/04/2020 05:00 PM UTC |
|
OSU-190128 Envelope Modernization
RPAC, McCorkle Pavilion and Larkins Plaza -This project will restore plazas and envelopes.
| 08/03/2020 06:00 PM UTC |
|
OSU-190008 Road and Bridge Improvements, FY19-Bid Package No-02
This project will mill and fill, and improve sidewalks and curbs
| 07/31/2020 06:30 PM UTC |
|
OSU-190124
This project will replace fixtures, water piping inside the building and improve water service and the hot water source.
| 06/19/2020 05:00 PM UTC |
|
OSU-190125 Electrical Renovation FY 2019
Bioscience: Replace (2) existing MCCs in the 10th floor mechanical penthouse with new MCCs and distribution panels in new locations. Provide code required separation of life safety and standby loads with new automatic transfer switch, manual transfer switch, and new panelboards.
Derby Hall: Replace existing MCC with new MCC in same location in room 0010M.
Dreese Lab: Replace (2) existing MCCs with new MCCs in same locations. (1) In room 036M & (1) in room 936M.
Research Center: Replace (3) existing service entrance unit-substations with new service entrance rated double ended switchgear with tie breaker and (2) exterior primary transformers. Replace existing feeders and electrical distribution equipment throughout the building.
| 06/17/2020 05:00 PM UTC |
|
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
| 06/08/2020 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.