OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/17/2025 07:00 PM UTC |
|
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
| 12/19/2025 07:00 PM UTC |
|
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
| 12/22/2025 07:00 PM UTC |
|
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
| 01/05/2026 07:00 PM UTC |
|
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
| 01/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190121 Elevator Upgrade and Modernization FY 19
Elevator Modernization and related architectural and MEP scopes of work for a total of 7 elevators in 5 buildings on OSU’s Main Campus:
Faculty Club/Animal Science Building/Meiling Hall /Rightmire Hall/Mendenhall Laboratory
| 11/05/2019 06:00 PM UTC |
|
OSU-120059 Cannon Drive Relocation Phase 1 BP2 Entry
Construction of a new entry feature structure at the Cannon and King intersection on Ohio States Campus. The entry feature will be constructed of reinforced concrete, reinforced masonry, and brick veneer. Aesthetic caps, lighting, and plaques are also proposed.
| 11/01/2019 06:00 PM UTC |
|
OSU-190291, Bolz - 4th Floor Renovation
Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
| 10/28/2019 06:00 PM UTC |
|
OSU-190221, 2001 Polaris - Roof Replacement
Work includes removal of existing roof top units, associated curbs, and associated utilities, and installation of metal roof panels and associated roof flashings where units have been removed, located at 2001 Polaris Parkway, Columbus Ohio 43240.
| 10/15/2019 06:00 PM UTC |
|
OSU-190029 Dreese - HVAC System
This project will remove the building chiller and connect the building to the chiller plant.
| 10/11/2019 05:00 PM UTC |
|
OSU-180783, Lima - Outdoor Lighting Upgrades
Lima Campus: The Project upgrades street, parking lot and pathway lighting as identified on the documents. The Project replaces and provides new poles/luminaries/pole bases based on Lima Campus standard Lithonia round steel poles and LED area luminaires.
| 10/04/2019 06:00 PM UTC |
|
OSU-190304, Lima - Reed HVAC Upgrade
OSU Lima Campus: The project includes upgrades to the Reed Hall chilled water plant. The existing 150 ton water-cooled chiller and its associated chilled water pump, cooling tower, condenser water pump, and piping will be removed. The existing system will be replaced with a new air-cooled chiller, new primary and secondary chilled water pumps, and a new plate and frame heat exchanger.
| 10/04/2019 05:00 PM UTC |
|
OSU-190620, Mount - Room 202 Glass Installation
The Ohio State University Main Campus. Demolition of existing curtain walls and install new insulated curtain walls, Franklin County, Ohio
| 09/27/2019 06:00 PM UTC |
|
OSU-190049, Newark - Pavement Renovations
Bid Package #2
Newark Campus: Pavement renovations includes the reconstruction of lot K, the relocation of lot K access drive, restriping, and lot K pavement marking reconfigurations of the Ohio State University and Central Ohio Technical College Newark Campus.
| 09/26/2019 06:00 PM UTC |
|
OSU-190192, Lincoln - 11th and 13th Office Renovation
Interior renovation of existing 11th and 13th floors of Lincoln Tower to create new offices suites for the departments of Hematology and Medical Oncology. Work will include interior demolition, interior partitions, casework, millwork, doors, finishes, fire protection, plumbing, HVAC, electrical and fire alarm scopes.
| 09/11/2019 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.