General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-150010 Fire System Replacement BP2
OSU-150010 Fire System Replacement BP2 - Cockins Hall 4th Fl Renovation The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
01/09/2018 08:00 PM UTC
OSU-160285 Brain and Spine Hospital - 3rd Floor Renovation
This project will make several improvements on the 3rd floor including replacing door hardware; patch, repair and paint walls; upgrades to the staff lounge; cabinet repairs.
01/04/2018 07:00 PM UTC
OSU-160830 Rhodes - Hybrid IR
Rhodes Hall - This project will combine rooms S268 and S264 and upgrade equipment to create an IR suite to accommodate multi-modality imaging.
12/20/2017 07:00 PM UTC
OSU-160010 Harding Hospital 5th Floor Renovations
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, wall demolition, new wall construction, mechanical, electrical, and plumbing work to accommodate new walls. Primary MEP systems are existing to remain.
12/19/2017 07:00 PM UTC
OSU-160420, WMC East - West 4th Fl Renovation
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
12/18/2017 06:00 PM UTC
OSU-170172 Morehouse Pavilion - 3rd Floor Neuro Clinic
This project will renovate space vacated by Sports Medicine on the third floor for the Neuro clinic, relocating from the seventh floor of the tower.
12/12/2017 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP1 - Postle Hall REBID
REBID - The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. Project includes hazardous materials abatement.
12/08/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation REBID
OSU Mansfield Campus: The work consists of the partial renovation of approximately 5,100 square feet of teaching and prep labs, including the addition of a new air handling unit serving these spaces and associated plumbing and electrical work
12/07/2017 07:00 PM UTC
OSU-170541, Enarson - 4th Floor Office
Enarson – 4th Floor Office. This project will renovate the office spaces of the 4th floor.
12/06/2017 06:00 PM UTC
OSU-170279, Baker Sys - AHU Replacement
Replacement of Air Handling Unit in Baker Systems Engineering Building.
11/29/2017 07:00 PM UTC
451 - 460 of 593 Solicitations
1 2 42 43 44 46 48 49 50 59 60