The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
OSU-230038 Newark - Reese Center Boiler and Chiller Replacements
This project will replace the existing water-cooled chiller, repair the existing cooling tower and replace the existing gas-fired boilers.
| 10/20/2023 06:00 PM UTC |
OSU-230458, East Tower - ADA Improvements
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind.
PHASE I: R219T, R221T, C104T and C141 Reception Desk.
PHASE II: T033T, T034T, C200T and Vestibule.
| 10/13/2023 06:00 PM UTC |
OSU-220764, Graves - Rooms 3185 & 3189 Conversion
Interior improvements of approximately 1,548 sf. in two rooms on Graves Hall Third Floor to convert office space into research lab space. Work includes new partition walls, doors, finishes, plumbing, mechanical, electrical, and data improvements. Add Alternates include #1) All work related to enlarging current corridor doors (including modification of CMU corridor walls).
| 10/11/2023 06:00 PM UTC |
OSU-210740 Jennings - Envelope Repair
Domes copper roof replacement, stone re-pointing and terra cotta
restoration.
| 10/10/2023 06:00 PM UTC |
OSU-220071 Exterior Door Control Upgrades FY 22 REBID
Auto operator replacement across building on Columbus campus
Card readers added to ADA doors which the building has a Lenel
Cabinet in place.
| 10/05/2023 06:00 PM UTC |
OSU-230303, Bevis - Vestibular Lab Build Out
The project is the renovation of an existing research lab into a vestibular lab. The area of construction is approximately 1,180 square feet. The work consists of the demolition of a small section of corridor wall, flooring, ceiling, section of the slab on grade, and the associated fire protection, plumbing, mechanical, electrical systems. The new work will consist of creating a Work Area, MOOG Room (for testing equipment), and a walking path. For the MOOG room, it is required to remove a section of the slab on grade and repour a thicker slab on grade to resist the forces of the equipment. The new work will entail new partitions, doors and frames, casework, ceilings, finishes in the new OSUWMC finish standards, and the associated plumbing, mechanical, electrical, and fire protection systems.
| 10/05/2023 06:00 PM UTC |
OSU-220677, Science Village - Room 119
Renovation of 741 square feet of the existing 51,879 square foot 1st Floor of the OSU Science Village Building, including walls, doors, ceilings, finishes, and related MEP items.
| 10/04/2023 06:00 PM UTC |
OSU-221027, Stillman - Corridor and 4th Floor Renovation
Columbus Campus: The scope of work includes a single-phase renovation of the following Areas: Suite 400 2,329 SF, 4th Floor Corridor 1,308 SF, 3rd Floor Corridor 1,348 SF, 2nd Floor Corridor 1,513 SF and Area 425X 265 SF in Suite 425.
| 09/26/2023 06:00 PM UTC |
OSU-220236, Lima- Public Service Building Renovation
OSU Lima: 3,600 sf renovation of the existing Public Service Building and HVAC upgrades.
| 09/18/2023 06:00 PM UTC |
OSU-220221 OSUE West Parking Lot
Construction of a new parking lot to the west of Hughes Street on the
western edge of the OSU East Hospital Complex.)
| 09/13/2023 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.