General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-230832 Ohio Stadium - Heat Trace to Piping (Phase 1) REBID
This project will repair and add heat tracing in Ohio Stadium. This is a rebid.
04/16/2024 06:00 PM UTC
OSU-210651, Faculty Club - Elevator Replacement REBID
OSU Columbus, Franklin County: Replacement of existing elevator at Faculty Club and all associated scope of work
04/10/2024 06:00 PM UTC
OSU-220456 12th Ave Dom Water & Sanitary REBID
Replacement of waterline and sanitary sewer along west 12th Ave between High Street and College Street. All site work to be performed between May 20 and August 2, 2024.
04/09/2024 05:00 PM UTC
OSU-230111 Road/Bridge Renewal FY 23-24
The planned scope of work includes rehabilitation three bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repair
04/05/2024 06:00 PM UTC
OSU-240102 - Norton House - Chiller Replacement
The project will replace the chiller in Norton House dormitory.
04/01/2024 06:00 PM UTC
OSU-230832 - Ohio Stadium - Heat Trace to Piping (Phase 1)
This project will repair and add heat tracing in Ohio Stadium.
03/29/2024 06:00 PM UTC
OSU-180390-4, 12th Avenue Bus Connector
12the Avenue Bus Connector
03/22/2024 06:00 PM UTC
OSU-230304 Converse Hall - Bathroom/Shower Renovation
The renovation of OSU Converse Hall includes a multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette.
03/20/2024 06:00 PM UTC
OSU-230113 Campus Hardscape Improvements Phase 1 REBID
This project will improve campus hardscapes.
03/19/2024 06:00 PM UTC
OSU-230414 - Smith Lab - Forensic Lab 4097 Renovation
The Ohio State University is seeking a general contractor to execute the renovation and conversion of a classroom space into a forensic anthropology laboratory. The renovation will include the removal/ abatement of ACM materials, the augmentation of the space surfaces to allow for cleaning, installation of requisite fixed and mobile dry and wet equipment. Plumbing scope includes backflow prevention, coring concrete for floor drains, and necessary sanitary and supply distribution piping to the sink. Mechanically, the project will remove the space from building air, and tie the space into the existing DOAS air handler. A capture hood, ductwork to a new roof-mounted exhaust fan, as well as air balancing are also included in the project scope. Controls modifications are included. Electrical modifications to supply the equipment include the addition of a sub-panel, and distribution circuiting in the space. Additionally, electrical work in the penthouse to feed the exhaust fan VFD, and smoke and fire separation at the floor are included.
03/14/2024 06:00 PM UTC
91 - 100 of 593 Solicitations
1 2 6 7 8 10 12 13 14 59 60