OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-230499 Tunnel Rehabilitation Phase I BP 2
The project consists of the removal and replacement of the North McCracken tunnel roof, the complete removal of the North McCracken tunnel bypass, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct a new steam line within the North McCracken Tunnel. Under the Alternate 1 scope of work, a new water main will be constructed from the east end of the Oval to the west end and then up to the Cockins/Dulles loading dock area. The Alternate 2 scope of work provides alternate restoration methods to the North Oval Mall.
| 12/06/2024 06:00 PM UTC |
|
OSU-240260, Newton - Lab Renovations
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 12/05/2024 07:00 PM UTC |
|
OSU-250002 - Ohio Stadium - Heat Trace to Piping (Phase 2)
This project is to add new heat trace to existing Ohio Stadium piping.
| 11/20/2024 07:00 PM UTC |
|
OSU-221019, Pressey - 90/92 ULAR Expansion
1. INTERIOR PROJECT TO CONVERT AN EXISTING COMMON SPACE AT THE LOWER LEVEL OF PRESSEY HALL INTO TWO NEW ANIMAL HOLDING ROOMS.
2. THE TWO NEW HOLDING ROOMS WILL BE SERVED BY AN EXPANDED HVAC SYSTEM, LOCAL FIRE-PROTECTION SYSTEM, AND ANIMAL WATERING SYSTEM. ELECTRICAL CONNECTIONS WILL BE MADE BACK TO EXISTING PANELS.
| 11/15/2024 07:00 PM UTC |
|
OSU-230109 Emergency Generator Replacement FY23 24
Replace existing diesel generator with new diesel generator and separate electrical distribution system into life safety, stand-by, and fire pump in accordance with NEC. The generator, and diesel day tank shall be located interior to the building with a remote radiator. Demolition of abandoned equipment will be required for installation of new generator.
| 10/31/2024 05:00 PM UTC |
|
OSU-240566 - Molecular Microbiology Lab Renovation
This project includes the renovation of two vacant laboratory rooms into space for a new molecular microbiology lab. Work includes but is not limited to demolition, access controls, finishes, plumbing, HVAC, Electrical, Technology and Fire Protection. This project will be constructed in multiple phases
| 10/30/2024 06:00 PM UTC |
|
OSU-230107 Electrical Renovation FY 23-24 BP#2
Replace main electrical distribution equipment in The Ohio State
University’s Cockins Hall.
| 10/30/2024 05:00 PM UTC |
|
OSU-240495 - Airport - Runway 9R/27L Drainage Improvements
This project involves the installation of HDPE culvert pipes and other
stormwater structures on both ends of Runway 9/27.n
| 10/17/2024 06:00 PM UTC |
|
OSU-240566, Molecular Microbiology Lab Renovation
This project includes the renovation of two vacant laboratory rooms
into space for a new molecular microbiology lab. Work includes but
is not limited to demolition, access controls, finishes, plumbing,
HVAC, Electrical, Technology and Fire Protection. This project will
be constructed in multiple phases.
| 10/11/2024 06:00 PM UTC |
|
OSU-190275, Ag Engineering - HVAC Upgrades (Rebid)
Ag Engineering Bldg, OSU Main Campus:
The primary objective of this project is to replace and enhance the HVAC systems serving rooms 145, 156, 158, 164, and 166 at The Ohio State University Agricultural Engineering Building. The spaces are high bay instructional spaces that are currently without cooling. Cooling shall be added as part of this project utilizing the new campus chilled water brought to the building by ENGIE. The HVAC, electrical, plumbing and structural systems detailed within the plans shall be utilized.
| 10/08/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.