General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
08/21/2025 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
09/03/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-220677, Science Village - Room 119
Renovation of 741 square feet of the existing 51,879 square foot 1st Floor of the OSU Science Village Building, including walls, doors, ceilings, finishes, and related MEP items.
10/04/2023 06:00 PM UTC
OSU-221027, Stillman - Corridor and 4th Floor Renovation
Columbus Campus: The scope of work includes a single-phase renovation of the following Areas: Suite 400 2,329 SF, 4th Floor Corridor 1,308 SF, 3rd Floor Corridor 1,348 SF, 2nd Floor Corridor 1,513 SF and Area 425X 265 SF in Suite 425.
09/26/2023 06:00 PM UTC
OSU-220236, Lima- Public Service Building Renovation
OSU Lima: 3,600 sf renovation of the existing Public Service Building and HVAC upgrades.
09/18/2023 06:00 PM UTC
OSU-220221 OSUE West Parking Lot
Construction of a new parking lot to the west of Hughes Street on the western edge of the OSU East Hospital Complex.)
09/13/2023 05:00 PM UTC
OSU-230203, Harding - First Floor Restrooms
A two phased renovation of the existing public restrooms located on the first floor of Ohio State Harding Hospital, 1670 Upham Drive in Columbus, Ohio. The project scope includes Rooms 100T (Women’s 212 SF), 101T (Men’s 174 SF), 115T (Men’s 34 SF), 116T (Women’s 34 SF), 118T (Women’s 122 SF), 119T (Men’s 122 SF), 111T (Unisex 39 SF) and 112T (Unisex 39SF). Restrooms 100T and 101T will need to be ADA Accessible. Alternate G-1 will be an Add Alternate to provide new doors and hardware for Restrooms 100T, 101T, 115T, 116T, 118T, and 119T. Rooms 111T and 112T will be designed and advertised as Add Alternate G-2 and will be equipped with anti-ligature fixtures and accessories. Phases One Restrooms 100T, 101T, and 115T as well as 112T if Alternate G-2 is accepted, Phase Two Restrooms 118T, 119T and 116T as well as 111T if Alternate G-2 is accepted.
08/31/2023 06:00 PM UTC
OSU-190008, Road and Bridge Improvements, FY2019 Bid Package #4
Trash Compactor Storage Area-Hess Road Rehabilitation
08/15/2023 06:00 PM UTC
OSU-210264 Emergency Generators
Replaces existing interior emergency generators at Sisson Hall and Agricultural (Ag) Engineering with exterior generators. Scope of work includes associated Civil, MEP, Fire Protection Systems, and Hazardous Material removal.
08/10/2023 05:00 PM UTC
OSU-220052 Campus Traffic Signal Upgrades
Establish fiber optic communication with OSU owned traffic signal and the City of Columbus CTSS.
08/07/2023 06:00 PM UTC
OSU-220071 Exterior Door Control Upgrades FY 22
This project will upgrade door operators in various buildings on campus.
08/03/2023 07:00 PM UTC
OSU-210669, OSUWMC - Anesthetizing Location
Doan Hall/Rhodes Hall and Ross Heart Hospital spaces: At areas as indicated on drawings work for Med Gas Upgrades includes: Addition or replacement of Zone Valve Boxes, Alarm Panels, and installation of new outlets at use spots, or replacement of existing outlets to Med Gas. Work also including piping above ceilings and down walls to all new devices and connection to existing. Patching, repair, priming, and paint and/or replacement of finishes is limited to areas where work is being performed.
07/31/2023 06:00 PM UTC
101 - 110 of 570 Solicitations
1 2 7 8 9 11 13 14 15 56 57