The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/17/2025 07:00 PM UTC |
|
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
| 12/19/2025 07:00 PM UTC |
|
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
| 12/22/2025 07:00 PM UTC |
|
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
| 01/05/2026 07:00 PM UTC |
|
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
| 01/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-230246, EEI - 4th Floor Otolaryngology Redesign
Tenant improvements of approximately 1,364sf on the fourth floor of the EEI Building, to accommodate a new Otolaryngology Research suite. The project will create a large staff workroom with conferencing capabilities, an Exam Room for a portable c-arm and conferencing capabilities, and minor upgrades to an Observation Room and Office.
| 03/13/2024 06:00 PM UTC |
|
OSU-220591, East - Tower 6 Renovation
Renovation of the existing 6th floor of the patient tower: Approximately 10,450 square feet of patient rooms, corridors, nurses’ station and accessory functions. Patient rooms and corridors include primarily refresh, while the center core area will be reconfigured with associated mechanical, plumbing, electrical and life safety items.
| 03/12/2024 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I
The project consists of the removal and abandonment of tunnels on
the University’s Midwest campus. The removal and abandonment of
tunnels includes the removal of abandoned piping within the tunnels.
New direct buried steam, communications, and medium-voltage
electric lines will need to be installed as part of the project’s scope of
work as well
| 03/07/2024 03:00 PM UTC |
|
OSU-230107 Electrical Renovations FY23-24
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building and Cockins Hall Building including switchboards and panelboards, upgrade egress lighting systems, and provide circuit tracing and receptacle replacement.
| 03/04/2024 06:00 PM UTC |
|
OSU-230111 Road/Bridge Renewal FY23-24
The planned scope of work includes rehabilitation three bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River, and Drake Pedestrian Bridge over Olentangy River Road and River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs
| 03/01/2024 07:00 PM UTC |
|
OSU-230517 - Ohio Union - CCTV Upgrade
This project will complete a full replacement of the CCTV system at The Ohio State University Ohio Union Building.
| 02/21/2024 07:00 PM UTC |
|
OSU-220458, Outpatient Care East - Xray Machines
Interior renovation for new x-ray equipment and casework within existing occupied outpatient care facility.
| 02/16/2024 07:00 PM UTC |
|
OSU-230412, Schottenstein - Fire Alarm Completion
This project will upgrade the remaining fire alarm systems throughout the Schottenstein Center that has not been previously completed through other projects. The scope of the project will require a design to upgrade the system to be compliant with current codes and University design standards and will include new and upgrades/replacement of audio and visual devices, pathways and wiring throughout portions of the building. There will also be work involved with the existing fire suppression systems to replace or add components to coordinate with the new work.
| 01/25/2024 07:00 PM UTC |
|
OSU-210269 Building Envelope Repairs
The scope of the project include repair of exterior glue-lam arched
beams, replacement of exterior T1-11 wood panel siding, limited site
work for asphalt walk removal, installation of 2.5” rigid insulation,
coverboard and PVC (FiberTite) roof membrane as an overlay on an
existing PVC roof membrane. The new insulation and PVC
(FiberTite) roof membrane will be provided by OSU as they already
own the material.
| 01/04/2024 07:00 PM UTC |
|
OSU-220221 OSUE West Parking Lot REBID
Construction of a new parking lot to the west of Hughes Street on the western edge of the OSU East Hospital Complex.
| 12/19/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.