General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-230103 HVAC Renovations FY23-24
Project will replace existing fiberboard ductwork with galvanized sheet metal ductwork. Ceilings, ceiling devices, walls, lights, etc. to be removed/replaced as necessary for replacing ductwork. Sullivant Hall
10/02/2024 05:00 PM UTC
OSU-230830, 650 Ackerman - Employee Health and ID Processing
A (2) Two Phased Renovation of approximately 5,750 SF for a new Employee Health and ID Processing Center located on the west end of the First Floor of 650 Ackerman Road Building. The improvements will include renovations and expansion to the North Entry Lobby X100L (existing area 761 SF plus the expansion to the west into Suite 116 to add an additional 260 SF) equating to a new 1,021 SF Lobby/Waiting Area to accommodate Suite 100, the remainder of Suite 116 will be utilized as a Staff Lounge equating to 260 SF, an ADA Restroom of 80 SF and a Janitor Closet of 28 SF. Suite 100 (area 4,235 SF) which will accommodate the following services: a Reception Area, (4) station counter for ID Processing, (5) Patient Exam Rooms, (2) Patient Toilet Rooms, (2) Testing Areas, Nurse Station, (5) Support Offices and 2 Storage Rooms (office supplies and medications).
09/25/2024 06:00 PM UTC
OSU-240191 - Younkin - Rm 150 Buckeye Resource Center
This project will renovate an approximately 2,014 sq. ft. space on the first floor of an existing mixed occupancy, 4-story building, and change use from from A-3 to B occupancy
09/25/2024 06:00 PM UTC
OSU-230030 Mansfield - Various Campus Upgrades
This project includes roof replacements, roof repairs, building envelope joint sealant replacement, miscellaneous masonry repair and restoration, site work, and site lighting at multiple buildings located at The Ohio State University Mansfield Campus in Mansfield. See additional information in Section 01 10 00 SUMMARY in the documents.
09/19/2024 06:00 PM UTC
OSU-200183 Med Center Traffic Control Devices REBID 4
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
09/13/2024 06:00 PM UTC
OSU-200183 Med Center Traffic Control Devices REBID
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
08/06/2024 06:00 PM UTC
OSU-200183 Med Center Traffic Control Devices REBID
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
07/30/2024 06:00 PM UTC
OSU 240138 Howlett Greenhouses Heating Piping
Replace all heating water and domestic cold water piping in the Howlett Greenhouse trenches and a portion of the heating water piping in the basement.
07/25/2024 06:00 PM UTC
OSU-230431 1 Evans Hall Chiller Replacement
Removal of existing chiller, providing new automatic propylene glycol feeder, providing 40% propylene glycol solution to fill system, installation of University purchased packaged chiller and transformer, provide concrete equipment pads, louvered fencing, site restoration, 200 gallon buffer tank, extending chilled water piping through roof to new chiller location, providing electric and controls from second floor mechanical room to University purchased chiller and transformer location outside on grade.
07/24/2024 06:00 PM UTC
Project OSU-230119 Journalism Bldg Rm 100 TV Studio
Interior renovation of room 100 for new Lantern Newsroom, private offices, and studios.
07/24/2024 06:00 PM UTC
101 - 110 of 622 Solicitations
1 2 7 8 9 11 13 14 15 62 63