The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-230820, Doan - Southeast Facade Remediation
The project includes repairs to the exterior brick masonry façade and cast-in-place concrete sunshades at the southeast corner of Doan Hall. The masonry repairs include the replacement of the through-wall flashing at shelf angles/lintels, brick masonry replacement at isolated distress, installation of brick masonry infill at former air conditioning units, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent. The concrete repairs include removal of the existing membrane coating, concrete patching, and application of a new liquid applied roof membrane.
| 03/17/2025 06:00 PM UTC |
|
OSU-230113 Campus Hardscape Improvements Phase 2 REBID
Campus Hardscape Improvements – Phase 2
| 03/13/2025 06:00 PM UTC |
|
OSU-240693 - PRB - Quantum Physics Lab Mechanical Upgrades
A 1,620 SF interior renovation of two research labs at the basement level of the Physics Research Building on the OSU Columbus Campus This project includes minor demolition, construction of new interior partitions, new finishes, and associated mechanical, electrical, plumbing, and fire protection work.
| 03/11/2025 06:00 PM UTC |
|
OSU-190066 HVAC Replacements FY 2019 BP 2
Davis Heart and Lung Institute:
Replacement of HVAC controls on Air Handling and HVAC Equipment with new DDC controls.
| 03/07/2025 06:00 PM UTC |
|
OSU-230420 Pressey Rms 042T and 044T ADA Upgrades
The renovation of existing toilet rooms into compliant ADA toilet rooms. Renovation will include modification to architectural finishes, electrical, fire alarm, and plumbing systems. Included is the installation of one adult changing station and associated structural reinforcement.
| 02/27/2025 07:00 PM UTC |
|
OSU-230107 BP 1 Electrical Renovation FY 23-24 REBID
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building including switchboards and panelboards.
| 02/20/2025 06:00 PM UTC |
|
OSU-230106 Plumbing Renovations FY23-24 BioScience
This is a Rebid. New domestic water and fire backflow preventors in a new location. Backfeed existing systems. Replacement of existing galvanized steel cold water piping throughout the facility. Installation of new piping prior to demolition of active mains. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility.
| 02/10/2025 06:00 PM UTC |
|
OSU-250003 - Ohio Stadium - Concession Stand Heaters
This project is for the installation of heaters within concession
spaces that provide heat during winter events. The current scope of the project includes the installation of 34 electrically powered heaters.
| 12/30/2024 07:00 PM UTC |
|
OSU-230431 1 Evans Hall Chiller Replacement REBID
Removal of existing chiller, providing new automatic propylene glycol feeder, providing 40% propylene glycol solution to fill system, installation of University purchased packaged chiller and transformer, provide concrete equipment pads, louvered fencing, site restoration, 200 gallon buffer tank, extending chilled water piping through roof to new chiller location, providing electric and controls from second floor mechanical room to University purchased chiller and transformer location outside on grade.
| 12/12/2024 07:00 PM UTC |
|
OSU-230686 Veterinary Medical Center AHU-1 & AHU-2 Damper Replacement
Replacement of the existing OA, RA, and EA dampers and damper actuators serving AHU-1 and AHU-2. Addition of freeze protection pumps and associated piping, valves and accessories for the pre-heat coils in AHU-1 and AHU-2. Integration of the new freeze protection pumps into the existing BAS.
| 12/12/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.