City of Perrysburg
201 W Indiana Ave, Perrysburg, OH 43551-1525
(419) 872-7880
201 W Indiana Ave, Perrysburg, OH 43551-1525
(419) 872-7880
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
Ft Meigs Road Ditch Repair and Multi-Use Path
This project consists of cleaning, regrading and making improvements to the existing ditch. There will also be sheet piling installation, landscaping, wooden fence installation and installation of a 10 foot multi-use path along the west side of Fort Meigs road from Eckel Junction Road to State Route 65 (West River Road).
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted.
Final Completion for the project: November 1, 2026
Engineering Estimate for the project: $2,800,000
| 01/15/2026 07:00 PM UTC |
|
Fort Meigs Road - Coe Court Signal Improvements
The City of Perrysburg hereby invites qualified firms to provide all labor & materials for the installation of a traffic signal installations at Ft Meigs Road/Coe Court Intersection.
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
Substantial Completion: October 1, 2026
Engineering Estimate for the entire project: $ 350,000
| 01/15/2026 07:00 PM UTC |
|
Prequalification for Professional Services
The City of Perrysburg is accepting qualifications for various professional services for calendar year 2026 and 2027. Prequalification only applies to design professional work under $50,000 per ORC 153.71.
Potential projects potentially include but are not limited to resurfacing, traffic studies, geotechnical reports, water distribution, sanitary sewer collection, material testing, grant writing/funding alternative services, GIS services, sustainability/energy efficiency consulting, right of way plans, water distribution design, sanitary sewer collection design, wastewater treatment plant improvements, storm water management, landscape architecture, general architecture and survey work. Roadway projects with Ohio Department of Transportation (ODOT) participation require the consultant to be ODOT pre-certified. Any firm submitting for residential/commercial inspection needs to also include all storm water certifications currently held.
| 01/16/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
Rebid Municipal Pool Management
The City of Perrysburg is seeking bids from qualified consultants to manage and operate the Perrysburg Municipal Pool, located at 915 Elm Street, Perrysburg, Ohio 43551.
The City’s objective is to have the Consultant maintain the swimming pool in a safe, clean, hazard-free manner and in compliance with all applicable governmental standards and regulations.
It is also part of the objective to have the Consultant operate the swimming pool in such a manner that patrons are encouraged to use the facilities and that all facilities and operations reflect well on the City of Perrysburg.
Engineer's Estimate = $250,000.00 (first year)
| 01/08/2026 07:00 PM UTC |
|
Downtown Streetscape Phase 2
This project consists of milling and resurfacing, road widening, curb replacement, sidewalk replacement, paver installation, planter installation, and other appurtenances for the 100 and 200 blocks of Louisiana Avenue.
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted.
Final Completion for the project: November 1, 2026
Engineering Estimate for the project: $4,250,000
| 12/11/2025 07:00 PM UTC |
|
Emulsion Polymer
Emulsion Polymer - The City of Perrysburg is accepting proposals for Emulsion Polymer for the period of three years.
| 10/30/2025 06:00 PM UTC |
|
Ferrous Chloride
Ferrous Chloride - The City of Perrysburg is accepting proposals for Ferrous Chloride for the period of three (3) years
| 10/30/2025 06:00 PM UTC |
|
Municipal Pool Operations and Management
The City of Perrysburg is seeking bids from qualified consultants to manage and operate the Perrysburg Municipal Pool, located at 915 Elm Street, Perrysburg, Ohio 43551.
The City’s objective is to have the Consultant maintain the swimming pool in a safe, clean, hazard-free manner and in compliance with all applicable governmental standards and regulations.
It is also part of the objective to have the Consultant operate the swimming pool in such a manner that patrons are encouraged to use the facilities and that all facilities and operations reflect well on the City of Perrysburg.
Engineer's Estimate = $250,000.00
| 10/30/2025 06:00 PM UTC |
|
Utility Rate Study
The City of Perrysburg is seeking Statement of Qualifications (SOQ) from firms to conduct a comprehensive Water and Sewer Utility Rate Study. This study will include an analysis of the base water and sewer rates, water and sewer capital expansion charges, potential revenue changes resulting from current negotiations with the Northwest Water and Sewer District, and impacts related to the current Director’s Final Findings and Orders (DFFO) from the Ohio Environmental Protection Agency (OEPA), including potential financial costs impacts from the Final SSSO Elimination Plan.
| 07/31/2025 06:00 PM UTC |
|
Fire Station 38 HVAC Improvements
Fire Station 38 HVAC Improvements
This project consists of removing the three (3) existing residential grade furnaces, condensers and all ancillary equipment and installing a new commercial grade roof top unit. Ductwork will be reused as much as possible but some changes are needed.
There is also an alternate (Alternate H-1) to remove an existing (not in use) rooftop unit, curbs/penetrations and repair the roof.
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted.
Final Completion for the project: May 29, 2026
Engineer's Estimate = $467,000.00
| 07/17/2025 06:00 PM UTC |
|
Construction Manager at Risk (CMAR) Services for Various Building Renovations
The City of Perrysburg recently finished a Comprehensive Feasibility and Space Utilization Study that examined six (6) different buildings. The purpose of the study was to determine space needs (now and in the near future) for each of the divisions/departments currently occupying the buildings, examine the condition of the existing buildings (including all systems) and determine what improvements need to be made and which divisions/departments should be housed in each building to make work flow between the divisions/departments more efficient and to make it easier for the public to interact with the City staff.
The City is now seeking Statement of Qualifications (SOQ) from firms to provide construction manager at risk services for the renovations of four (4) of the buildings that were part of the previous study.
The selected Construction Manager at Risk firm will be part of the design team and will offer input and suggestions throughout the design process.
| 07/02/2025 06:00 PM UTC |
|
Architectural Design Services for Various Building Renovations
The City of Perrysburg recently finished a Comprehensive Feasibility and Space Utilization Study that examined six (6) different buildings. The purpose of the study was to determine space needs (now and in the near future) for each of the divisions/departments currently occupying the buildings, examine the condition of the existing buildings (including all systems) and determine what improvements need to be made and which divisions/departments should be housed in each building to make work flow between the divisions/departments more efficient and to make it easier for the public to interact with the City staff.
The City is now seeking Statement of Qualifications (SOQ) from firms to provide architectural design services for the renovations for four (4) of the buildings that were part of the previous study.
The City will also be selecting a Construction Manger at Risk (CM+R) delivery method for this project and the selected CM+R firm will be part of the design team and will offer input and suggestions throughout the design process.
| 07/02/2025 06:00 PM UTC |
|
WWTP Aeration Tank #1 Cleaning
WWTP Aeration Tank #1 Cleaning
This project consists of cleaning an aeration tank at the wastewater treatment plant. The dimensions of the tank are approximately 100 feet long by 69 feet wide with 16 foot 3 inch side walls.
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted.
Final Completion for the project: September 30, 2025
Engineering Estimate for the project: $125,000.00
| 06/26/2025 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.