General Info

Business Logo

City of Perrysburg

201 W Indiana Ave, Perrysburg, OH 43551-1525
(419) 872-7880


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Fire Station 38 Renovations
Fire Station 38 Interior Renovation - Kitchen & Dayroom This project consists of renovating the kitchen and dayroom portion of Fire Station 38, which is located at 140 West Indiana Avenue, Perrysburg, Ohio 43551. This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. There will be a mandatory prebid meeting on March 17, 2026 at 10:00 am. Bidders should meet at the Engineering Department (127 W Fifth Street). After some general information and discussion, the meeting will move across the alley to the Fire Station so that the potential bidders can see the proposed work area. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion for the project: December 31, 2026 Engineering Estimate for the project: $230,000
04/02/2026 06:00 PM UTC
IT Hardware and Software Update
The City of Perrysburg virtual environment is comprised of the following equipment across two sites managed by a single vCenter: Site 1 Location & Equipment: Department of Public Utilities 1 W Boundary Street Perrysburg, Ohio 43551 2 ESXi Hypervisors 1 NAS Site 2 Location & Equipment: Police Division 330 Walnut Street Perrysburg, Ohio 43551 2 ESXi Hypervisors 1 NAS Due to resource and lifespan limitations, this project consists of: Replacing (4) existing hypervisors with (4) new Cisco ESXi Hypervisors, Two hypervisors per site. Include perpetual Microsoft licensing and CALs for each Replacing (2) NAS storage devices with (2) new EverPure (formerly Pure Storage) SAN arrays One per site Professional services to be performed in person at both sites for: Installation, configuration, and integration of all hardware and licensing listed in the attached fixed Bill of Materials (BOM) and software including vSphere, vCenter, etc. Engineering Cost Estimate: $ 460,000.00
04/09/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
WWTP Aeration Tank #1 Cleaning
WWTP Aeration Tank #1 Cleaning This project consists of cleaning an aeration tank at the wastewater treatment plant. The dimensions of the tank are approximately 100 feet long by 69 feet wide with 16 foot 3 inch side walls. This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion for the project: September 30, 2025 Engineering Estimate for the project: $125,000.00
06/26/2025 06:00 PM UTC
Hosted IP Telephony
Hosted IP Telephony The City of Perrysburg (“City” or “Customer”) seeks proposals to this RFP from hosted IP telephony providers for a UCaaS solution to replace their current telephone system. The City currently uses a premise-based NEC SV8100/SV9100 telephone system supporting somewhat less than 200 users. The City is seeking proposals for a 36-month contract with the ability to re-contract for additional one- or two-year extensions. The project will be awarded to the lowest and most responsive bidder based on the Price and the responses to the required questions. Engineering Estimate for the entire project: $ 90,000
06/05/2025 06:00 PM UTC
MRE Building Roof Replacement
MRE Building Roof Replacement The City of Perrysburg hereby invites qualified firms to provide all labor & materials to remove and replace approx. 10,800 SF of flat roofing system This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. Final Completion for the project is November 14, 2025 Engineering Estimate for the entire project: $ 230,000
05/29/2025 06:00 PM UTC
Municipal Court Office Renovation
This project consists of removing some interior walls, enclosing some existing door and interior window openings, constructing some new interior walls and making modifications to the HVAC and electrical systems for the spaces created. This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion for the project: October 31, 2025 Engineering Estimate for the project: $95,000
05/15/2025 06:00 PM UTC
Crew Truck Buildout
The Utility Department has recently purchased a 2025 5500 Crew Cab Chassis 4x4 truck. The City is now requesting a buildout of an enclosed service body to be mounted on that chassis. Engineer's Estimate: $90,000.00
04/17/2025 06:00 PM UTC
2025 Traffic Signal Improvements
The City of Perrysburg hereby invites qualified firms to provide all labor & materials for the reconstruction of traffic signal installations at Indiana Avenue/Elm Street intersection and Indiana Avenue/E. Boundary Street Intersection. This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. Engineering Estimate for the entire project: $ 500,000
04/17/2025 06:00 PM UTC
Perrysburg 2025 Sidewalk Program
Perrysburg 2025 Sidewalk Program This project consists of repairing City sidewalks by lifting, leveling or grinding of any City sidewalk section that has been identified in need of repair or fully replacing sections that are beyond the repair specifications. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid. As part of the 2024 Sidewalk Program approximately 28,920 sf of sidewalk was lifted, 1,440 sf of sidewalk was replaced and 176 lf of sidewalk was ground down. Engineering Estimate for the entire project: $ 200,000
04/10/2025 06:00 PM UTC
Perrysburg 2025 Pavement Markings
This project will consist of pavement marking in various locations across the City of Perrysburg. Due to fading, the existing pavement markings need new paint to be applied to them. All paint must adhere to the Ohio Manual of Uniform Traffic Control Devices standards. EARLIEST START DATE: June 1, 2025 FINAL COMPLETION DATE: July 31, 2025 This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. Engineering Estimate for the entire project: $ 120,000
04/10/2025 06:00 PM UTC
SOQ for Implementation of Trimble Unity Maintain Asset Management Software
The City of Perrysburg Department of Public Utilities (DPU) is seeking Statement of Qualifications (SOQ) from firms to provide comprehensive implementation services for the Trimble Unity Maintain asset management software, associated GIS services, and software integration. This twelve-month contract will involve all aspects of GIS services as outlined in the technical specifications. The selected firm will be responsible for enhancing the City’s current ESRI ArcGIS and databases, ensuring the information is effectively utilized for communication with residents, City administration, and external organizations.
04/03/2025 06:00 PM UTC
2025 Annual Resurfacing Program
2025 Annual Resurfacing Program This project consists of milling and resurfacing, curb replacement and other associated work of Ottawa Lane, Delaware Drive, Adams Court, Chippewa Lane, Cranden Drive, Cranden Court, Ottekee Drive, Mohawk Drive, Tonbridge Court, Woodstream Road. The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Perrysburg Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Perrysburg Engineering Department, 127 West Fifth Street, Perrysburg, OH 43551. State prevailing wages shall apply. All work is located within the City of Perrysburg corporation limits and is thereby eligible for City Income Tax collection. In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted. Final Completion: on or before October 31, 2025 Engineering Estimate: $ 1,605,000.00
03/20/2025 06:00 PM UTC
21 - 30 of 106 Solicitations
1 3 5 6 7 8 9 10 11