General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9657PlanHolders09042025.pdf (92.6 KB)
Contract 9657 - Stricker Pond Forebay Dredging
9659PlanHolders09042025.pdf (92.8 KB)
Contract 9659 - Ops Locker Rm Renovation
9674PlanHolders09042025.pdf (89.6 KB)
Contract 9674 - 346 E. Lakeside Demolition
9679PlanHolders09042025.pdf (86.3 KB)
Contract 9679 - Olin Park Bridge Replacement
9682PlanHolders09042025.pdf (89.5 KB)
Contract 9682 - Monona Terrace Tunnel Lighting
9687PlanHolders09042025.pdf (86 KB)
Contract 9687 - Country Grove Singletrack Trail
7 Documents

Upcoming Solicitations

Number Deadline
9659 - Engineering Operations Facility (EOF) Locker Room Renovation
This contract is for improvements to the Engineering Services Building (ESB) Locker Room located at 1600 Emil Street, Madison, WI. The work includes, but is not limited to, removal and replacement of mechanical, electrical, and plumbing systems, removal and construction of interior walls, removal and replacement of slabs on grade, and interior renovations to create 12 individual use restrooms (4 of these rooms also have showers), and a general locker room area within the footprint of the existing building.
09/04/2025 07:00 PM UTC
9682 - Monona Terrace Tunnel Lighting
This work generally consists of the replacement and upgrades to the existing lighting and electrical systems under the Monona Terrace Parking structure.
09/04/2025 07:00 PM UTC
9657 - Stricker Pond Forebay Dredging
Dewater and dredge the existing stormwater forebay located at the City of Madison Park Stricker's Pond, 7214 Longmeadow Rd. This work also includes construction of four catch basins, topsoiling and native seeding.
09/04/2025 07:00 PM UTC
9674 - 346 E. Lakeside Demolition
This project includes the demolition of the house at 346 E. Lakeside Street and the restoration of the site to turf and a gravel path. The house is located on Lake Monona between another residential property and existing park property. Major features to be removed include: the house, garage, deck, fence lines, concrete path, asphalt drive, and existing vegetation.
09/18/2025 07:00 PM UTC
9687 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
09/18/2025 07:00 PM UTC
9679 - Olin Park Pedestrian Bridge Replacement
This project consists of the replacement of a pedestrian bridge at Olin Park in Madison, WI including but not limited to the following: • Removal of existing bridge • Bridge fabrication, delivery and installation of new bridge on existing abutments
09/18/2025 07:00 PM UTC
9681-Dairy Drive Campground Demo and Site Restoration
This contract is for the demolition of structures, site features and asphalt and/or concrete paving located 3202 Dairy Dr.
09/25/2025 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
08/21/2025 07:00 PM UTC
9673 - Bartillon Shelter Fiber Connection
1904 Bartillon Drive, Madison, WI.
08/21/2025 07:00 PM UTC
9677 - Quann Park Lighting Project
The project generally consists of installing City-standard path lighting (LED, cut-off fixtures) along the Quann Park Path. The project also includes work at Penn Park to install two solar street lighting units.
08/21/2025 07:00 PM UTC
8806 - Buffalo Trail, Barron Court, and Green Lake Pass Assessment District - 2025
Work shall include, but not be limited to, replacement of a portion of the sanitary sewer main and laterals, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, asphalt pavement, pavement marking, and signing.
08/21/2025 07:00 PM UTC
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
07/24/2025 07:00 PM UTC
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
07/24/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
8785 - Meyer Avenue Assessment District - 2025
Work includes excavation, sanitary sewer main and laterals, storm sewer pipe and structure installation, sanitary sewer main and laterals, excavation, gravel base course, asphalt pavement, pervious pavement, concrete curb & gutter, driveway aprons, lighting conduit and base/poles, terrace rain gardens, soil restoration, pavement markings, and signing.
07/03/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
1 - 10 of 1059 Solicitations
← Previous 1 3 4 5 6 7 8 9 105 106