General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9593PlanHolders04012026.pdf (90 KB)
Contract 9593 - Pressure Zone 4 Crossing
9694PlanHolders04012026.pdf (90.3 KB)
Contract 9694 - Warner & Worthington Park Courts
9726PlanHolders04012026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9740PlanHolders04012026.pdf (96.7 KB)
Contract 9740 - Unit Well 12 Upgrade
9751PlanHolders04012026.pdf (86.4 KB)
Contract 9751 - 2026 Parking Garage Maintenance
9757PlanHolders04012026.pdf (88.3 KB)
Contract 9757 - Imagination Center Fiber
9766PlanHolders04012026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
8 Documents

Upcoming Solicitations

Number Deadline
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
04/02/2026 07:00 PM UTC
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
04/02/2026 07:00 PM UTC
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
9361 - STATE STREET CAMPUS GARAGE MIXED-USE PROJECT
A new public and private development opportunity that includes the demolition and replacement of the existing State Street Campus Garage (SSCG) at 415 North Lake Street. The proposed building project will be completed in two construction phases. Phase 1 –the Public Works project titled State Street Campus Garage Mixed-Use Project - includes demolition of the existing SSCG and proposed construction will include an intercity bus terminal, public parking structure, and “gray box” spaces for final build out by a private Developer (i.e. Mortenson Development, Inc.). Phase 2 –constructed by the Developer and not included in the scope of this contract- will include private housing components built on top and within the Phase 1 construction.
11/09/2023 08:00 PM UTC
9334 - Robin Greenway Restoration
Ecological restoration, including tree removals, tree and shrub planting, invasive species removals, and native seeding at a City of Madison owned property.
11/09/2023 08:00 PM UTC
9377 University Avenue Box Repair - 2023
Work includes repairing the walls, roof, floor and utility connections. The project will take place within a 15'x6' and 12x6' reinforced concrete box culvert within University Ave. The project limits are University Ave., from Grand Ave. to Schmidt Pl.
11/09/2023 08:00 PM UTC
9304 - Northport Drive - School Road Traffic Signal Assessment District 2023
Removal and construction of signal conduit, concrete bases pavement markings, and sidewalks at the intersection of Northport Drive & School Road in the City of Madison.
11/09/2023 08:00 PM UTC
9086 - Metro Transit Hanson Rd. Bus Facility Remodel
Remodel existing buildings, including site improvements, for the Metro Transit Hanson Road Satellite Bus Facility, located at 3829 and 3901 Hanson Road in Madison, WI. This remodel will provide bus storage and bus maintenance for 60ft electric articulated buses for the Metro Bus Rapid Transit (BRT) system. The facility was previously a FedEx distribution center.
10/26/2023 07:00 PM UTC
9108 - Parkside Drive Sanitary Sewer Replacement
Cleaning, grubbing, replacement of sanitary sewer, installation of a gravel access path for maintenance equipment, pipe culvert removal, and restoration with topsoil, seed and matting.
10/05/2023 07:00 PM UTC
9336 - Felland Reservoir Booster Pump Install Milky Way Reservoir Valve Install
This project is located on the east side of Madison and will consist of installing a booster pump and associated piping in the existing control building at Felland Road reservoir.
09/21/2023 07:00 PM UTC
8710 - S. Owen Drive Assessment District - 2023
Replacement of sanitary sewer main and laterals, replacement of storm sewer structures and pipes, excavation, base preparation, asphalt pavement, curb and gutter, sidewalk, driveway aprons, terrace rain gardens, and pavement markings.
09/21/2023 07:00 PM UTC
9365 - Railroad Arch Culvert Repair at Southwest Bike Path
Reconstructing historic stone retaining wall located at 600 Glenway Street in Madison, WI. The Contractor or Contractor's subcontractor must be prequalifed in Historic Masonry prior to construction.
09/21/2023 07:00 PM UTC
8595 - Madison Public Market
This contract is for the selective demolition and construction of the future Madison Public Market site and facility located at 202 N First St, Madison WI. The work includes, but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
09/14/2023 07:00 PM UTC
141 - 150 of 1082 Solicitations
1 2 11 12 13 15 17 18 19 108 109