General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
8746 - West Washington Avenue and Henry Street Resurfacing Assessment District - 2024
The work includes, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk replacement, pulverize and shape, asphalt pavement, traffic signals, pavement marking and signing.
03/28/2024 07:00 PM UTC
9359 - Country Grove Park Shelter
The work includes furnishing all labor, materials, equipment and tools for general construction of a new Country Grove Park Shelter located at 7353 East Pass, Madison, WI, including but is not limited to, mechanical, electrical, plumbing, site and utility work including connections from the new building to water and sewer lines. Additional site work includes a new parking lot, paths, bio-retention basins and new sport courts.
03/21/2024 07:00 PM UTC
9493 - 2024 Parking Garage Maintenance
The work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components, installation of new or replacement concrete connections/anchors, and welding of steel.
03/21/2024 07:00 PM UTC
8753 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 11) by the Common Council
The work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
03/21/2024 07:00 PM UTC
9362 - Ohmeda Drive Assessment District - 2022
The work includes, but is not limited to, tree removal, street lighting removal, existing site removals, sanitary sewer main, sanitary sewer laterals, water main, water services, storm sewer main, storm sewer structures, fiber line conduit adjustment, excavation, base preparation, curb and gutter, driveway aprons, concrete sidewalk, asphalt pavement, and pavement marking.
03/21/2024 07:00 PM UTC
9485 - Rennebohm Park Shelter Restroom Renovation
The work includes, but is not limited to, removal and replacement of mechanical, electrical, and plumbing systems, removal and construction of some exterior walls, removal and replacement of slabs on grade, and interior renovations to create 4 individual use restrooms, a warming room, and a utility room within the existing enclosed area of the park shelter.
03/07/2024 08:00 PM UTC
8737 - Resurfacing 2024 - Asphalt Pavement Pulverizing, Milling & Paving
The work includes pulverizing, milling, and paving various streets that are included with the resurfacing program. This contract also includes concrete pavement removal, placing crushed aggregate base course and paving on Old Sauk Rd.
03/07/2024 08:00 PM UTC
8738 - Resurfacing 2024 - Asphalt Base Patching and Base Patch Grinding
The work includes asphalt base patching, patch by grind (mill/overlay) citywide, and infrared patching. Contractor may be required to replace temporary patches with permanent HMA patches. On streets that have a pavement rating greater than 6 and on collector and arterial streets patches shall then have the limit extended by mill and overlay per the established patching criteria.
03/07/2024 08:00 PM UTC
8736 - Resurfacing 2024 - Curb & Gutter and Castings
The work includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes (supplied by City of Madison), adjusting inlets and castings (castings supplied by City of Madison), and installation of new storm sewer in advance of pavement pulverizing/milling and paving.
03/07/2024 08:00 PM UTC
8756 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 19) - 2024
The Contractor shall perform repair work primarily throughout the 19th Aldermanic District. A list of approved repair locations and an area map of Aldermanic District 19 has been provided within these Special Provisions for reference. The list, however, is not a final list. Additional locations may be added. Horizontal sawcut/grind locations have been marked in the field with a pink line and a white “C”. The Contractor shall horizontally sawcut/grind sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/22/2024 08:00 PM UTC
141 - 150 of 1107 Solicitations
1 2 11 12 13 15 17 18 19 110 111