City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 8829PlanHolders05222026.pdf (84 KB) |
Contract 8829 - Sidewalk Curb & Gutter 2026
| |
| 8830PlanHolders05222026.pdf (88.2 KB) |
Contract 8830 - Bridge Repairs - 2026
| |
| 9787PlanHolders05222026.pdf (85.9 KB) |
Contract 9787 - Newville Park Redevelopment
| |
| Number | Deadline |
|---|---|
|
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
| 06/04/2026 07:00 PM UTC |
|
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
| 06/04/2026 07:00 PM UTC |
|
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
| 06/11/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
8743 - Lake Mendota Drive Assessment District - 2024
The work includes replacement and installation of new storm sewer pipes and structures, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
| 02/22/2024 08:00 PM UTC |
|
9342 - Unit Well 15 PFAS Treatment Facility
The work includes two GAC vessels, two ion exchange vessels, roof movement to accommodate vessels, treated water reservoir separation to create a filter-to-waste tank, chemical feed location changes, acid feed system changes, general HVAC, electrical, and architectural improvements, and driveway resurfacing
| 02/08/2024 08:00 PM UTC |
|
8696 - Bikeways 2023
The work includes but is not limited to replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking, and signing.
| 02/08/2024 08:00 PM UTC |
|
8717 - Mineral Point Road Widen Sidewalk
The work under this contract shall include, but is not limited to, construction of HMA pavement, concrete pavement, pavement resurfacing, curb and gutter, sidewalk, curb ramps, modular landscaping walls, grading, landscaping, storm sewer, water, fiber optic, lighting, traffic signals, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 02/08/2024 08:00 PM UTC |
|
9495 - 2024 Semi-Permanent Epoxy Pavement Markings
Furnishing and application or removal of epoxy pavement markings at locations throughout the City of Madison and per City of Madison Standard Pavement Marking Details or as shown
on the plans provided by the City of Madison.
| 02/08/2024 08:00 PM UTC |
|
8755 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 11) - 2024
The work includes horizontally sawcut/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
| 02/08/2024 08:00 PM UTC |
|
8754 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 19) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
| 02/08/2024 08:00 PM UTC |
|
9503 - Sycamore Singletrack Trail Improvements 2024
The work includes constructing up to 6538 linear feet of off-road, natural surface, bike optimized, single track trail in Sycamore Park
| 02/08/2024 08:00 PM UTC |
|
9389 - Sycamore Singletrack Trail Improvements 2024
The work includes constructing up to 6538 linear feet of off-road, natural surface, bike optimized, single track trail in Sycamore Park.
The trail consists of natural material constructed using a “lift and tilt” method to create a sustainable surface. A portion of the trail will be an all-weather feature trail using a chip seal product to allow all weather use. Technical trail features are added to both trail type to enhance riding experience. These features are constructed of native stone and imported stone where needed.
| 01/11/2024 08:00 PM UTC |
|
9329 - Fire Station 14 Training Site Phase 1
The work includes the construction of private roadways to be located at the Madison Fire Station No. 14 Training Site, 3101 Dairy Drive. The private roadways, including water hydrants, paving, curb/gutter and stormwater management will be used by Madison Fire Department for operator training and access to future training apparatus.
| 01/11/2024 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.