General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9668PlanHolders08212026.pdf (94.4 KB)
Contract 9668 - Mayflower Lift Station Replacement
9782PlanHolders08212026.pdf (97.6 KB)
Contract 9782 - South Point Public Works Facility
9806PlanHolders08212026.pdf (83.7 KB)
Contract 9806 - 2026 Playgrounds -- Set 2
9818PlanHolders08212026.pdf (86 KB)
Contract 9818 - Cypress Spray Park Redevelopment
5 Documents

Upcoming Solicitations

Number Deadline
9668 - Mayflower Lift Station Replacement
The work under this contract shall include, but is not limited to, the removal and replacement of the existing Mayflower sanitary sewer lift station, replacement of the existing force main, replacement of gravity sanitary sewer mains and structures, installation of an emergency generator, installation of a telemetry antenna tower, installation of a new site access drive, grading of the site, and restoration of the site.
08/27/2026 07:00 PM UTC
9782 - South Point Public Works Facility
This single contract is for the installation of a new Streets Division Operations Building and the remodeling of an existing warm storage building for Parks Division West Maintenance Operations.
09/10/2026 07:00 PM UTC
9818 - Cypress Spray Park Redevelopment
This contract consists of installation of a Splash Pad and Playground at Cypress Spray Park (902 Magnolia Ln.). The Contractor shall view the site prior to bidding to become familiar with the existing conditions. The Contractor shall work with the existing utilities to resolve conflicts during the construction process.
09/10/2026 07:00 PM UTC
9806 - 2026 Playgrounds -- Set 2
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at five (5) City of Madison park locations including James Madison Park, Marshall Park, Eastmorland Park, Orton Park, and Heifetz Park.
09/10/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
8795 - Chip Sealing 2025 - South
The work under this contract consists of street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
03/27/2025 07:00 PM UTC
8781 - Evergreen Avenue, Ohio Avenue, Sommers Avenue Assessment District - 2025
The work under this contract shall include, but not be limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking, signing, replacement of a traffic signals, and replacement of street lighting.
03/27/2025 07:00 PM UTC
8800 - 2025 Safe Streets
The work under this contract shall include, but is not limited to, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk, asphalt pavement, and replacement of storm sewer main and storm sewer structures.
03/20/2025 07:00 PM UTC
8796 - Repairing and Sealing Pavement Cracks - Major Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
03/20/2025 07:00 PM UTC
8797 - Repairing and Sealing Pavement Cracks - Local Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
03/20/2025 07:00 PM UTC
9318 - Olin Waste Transfer Drop-Off
This project is to provide a dedicated Public Waste and Recycling Drop-off site at the existing Olin Waste Transfer site. Currently the temporary site is co-mingled with large city vehicles and the drop-off site runs limited hours for safety reasons. This project will install a separate public access road off of Quann-Olin Pkwy. The internal circulation of the drop-off area will keep public and city vehicle traffic separated.
03/13/2025 07:00 PM UTC
8811 - Bridge Repairs - 2025
This project consists of bridge repairs for the Park Street pedestrian bridge (P-13-760), Commercial Avenue bridge, USH-51 pedestrian bridge (B-13-341), and the Campus Drive Bridge (B-13-266) over Highland Avenue.
03/13/2025 07:00 PM UTC
8791 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 20) - 2025
The work includes horizontally sawcutting/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/27/2025 08:00 PM UTC
8788 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 10) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work.
02/27/2025 08:00 PM UTC
9551 - Rennebohm Park Sprayground
This contract consists of installation of a Sprayground at Rennebohm Park (115 N. Eau Claire Ave.). Work to include: -Water service lateral and associated pavement patching -Concrete paving (colored and standard) -Plumbing from command center to spray features -Spray feature installation -Shade structure installation -Site earthwork -Site restoration
02/13/2025 08:00 PM UTC
91 - 100 of 1121 Solicitations
1 2 6 7 8 10 12 13 14 112 113