General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9593PlanHolders04012026.pdf (90 KB)
Contract 9593 - Pressure Zone 4 Crossing
9694PlanHolders04012026.pdf (90.3 KB)
Contract 9694 - Warner & Worthington Park Courts
9726PlanHolders04012026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9740PlanHolders04012026.pdf (96.7 KB)
Contract 9740 - Unit Well 12 Upgrade
9751PlanHolders04012026.pdf (86.4 KB)
Contract 9751 - 2026 Parking Garage Maintenance
9757PlanHolders04012026.pdf (88.3 KB)
Contract 9757 - Imagination Center Fiber
9766PlanHolders04012026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
8 Documents

Upcoming Solicitations

Number Deadline
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
04/02/2026 07:00 PM UTC
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
04/02/2026 07:00 PM UTC
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
8744 - Atticus Way Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of storm sewer structures and pipes, base preparation, curb and gutter, asphalt pavement, sidewalk, street lighting, pavement marking, and signing.
06/27/2024 07:00 PM UTC
9522 - 20 Is Plenty
The work includes providing, hauling, and installing 24” x 30” “Speed Limit 20” signs on residential streets throughout the City of Madison as shown on the provided plan sheets and per the provided detail drawings and bid items specifications.
06/13/2024 07:00 PM UTC
9527 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
06/13/2024 07:00 PM UTC
8635 - Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, installation of storm sewer main and storm sewer structures, adjustment of sanitary sewer man structures, adjustment of water valves, excavation, base course preparation, bridge rehabilitation, curb and gutter, driveway aprons, sidewalk installation, green infrastructure, colored concrete pavement, asphalt pavement, pavement marking and signing.
06/13/2024 07:00 PM UTC
9358 - Bartillon Shelter
The work includes, but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
05/23/2024 07:00 PM UTC
8745 - Stevens Street Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
05/23/2024 07:00 PM UTC
8709 Doncaster Beverly Danbury Reconstruction Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, terrace rain gardens, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, and asphalt pavement.
05/23/2024 07:00 PM UTC
9487 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2024
The work includes the trenchless rehabilitation of approximately 14,973 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system. This contract shall also include the trenchless rehabilitation of approximately 860 linear feet of corrugated metal pipe (CMP) storm sewer pipelines with sizes of 21” diameter circular and 18”x24” elliptical using a thermal cure CIPP system.
05/09/2024 07:00 PM UTC
8740 - Hermina St & Union St Reconstruction Assessment District
The work includes the removal and replacement of the following: sanitary sewer main and laterals, storm sewer pipes and structures, asphalt pavement and roadway gravel base, concrete curb & gutter, concrete driveway aprons, and concrete sidewalk as needed.
05/09/2024 07:00 PM UTC
9497 - Streets West Facility HVAC and Lighting Upgrade
The work includes replacement of garage ventilation system with new make-up air unit and exhaust fan system. Lighting will be replaced in all garage and shop areas.
04/25/2024 07:00 PM UTC
91 - 100 of 1082 Solicitations