General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSM 65(1750)101.1
Abandoned Mine Reclamation Project Peanut Derry Township, Westmoreland County Estimated Amount: $300,000.00 - $500,000.00 Term: 90 calendar days Bid Bond Required Principle Items of Work and Approximate Quantities: Mobilization and Demobilization, 1L.S. Office Facility, 1 L.S. Access Road - Surface, 1085 S.Y. Access Road - Culvert, 40L.F. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (18” Diameter), 1.940 L.F. Clearing and Grubbing, 11 ACRE Demolition and Disposal of Coke Ovens,1 L.S. Selective Grading, 35,710 C.Y. Waterline Replacement, 900 L.F. Planting – Permanent Seed, 7 ACRE Planting – Wildlife Seed, 3 ACRE Planting – Tree, 1 ACRE
12/18/2025 07:00 PM UTC
OSM 26,65(2553,2758)102.1
Abandoned Mine Reclamation Project Belle Vernon Region (Phase 2) Rostraver Township, Westmoreland County Washington Township, Fayette County Estimated Amount: Greater than $5,000,000 Term: 900 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 20,558 L.F. Four-Inch (4") Air Rotary Drilling, 74,489 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 86,093 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 9,624 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 49,496 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 8 Coarse Aggregate, 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 42,152 DRY TON Injection Site Preparation and Site Restoration, 814 EACH
12/18/2025 07:00 PM UTC
OSM 11(0838)102.1
Abandoned Mine Reclamation Project Fox Run West Caroll Township, Cambria County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 2,950 L.F. Clearing and Grubbing, 11 ACRE Grading - Grading, 66,500 C.Y. Grading – Hummocky Piles, 2 ACRE Grading – Ripping, 2 ACRE Planting – Planting Preparation, 11 ACRE Planting – Tree Seedlings, 2,720 EACH
12/18/2025 07:00 PM UTC
OSM 03(1172)101.1
Abandoned Mine Reclamation Project Rupp Run South Manor Township, Armstrong County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (12” Diameter) - 50 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube – 20 L.F. Clearing and Grubbing, 0.1 Acre Planting – Planting Preparation, 0.2 Acre Channel Reconstruction – R-6 Riprap and Rock Energy Dissipaters, 200 L.F. Channel Reconstruction – SmartDitch, 175 L.F. Traffic Control, 1 L.S.
01/08/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OOGM D25-1
Cleaning Out and Plugging One (1) Abandoned Gas Well Huston Township, Clearfield County Estimated Amount: $200,000-$299,999 (Small Business Only) Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug one (1) abandoned Oriskany Gas well, approximately 7,000' deep. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: November 12, 2025, at 10:00 a.m. Department representatives will meet contractors at: The Annex Building Conference Room. We will travel to location from there. Annex Building Coordinates: 41.118593, -78.530091. Directions: If traveling Interstate 80, use exit 111 and turn on State Route 153 North. Drive past Moshannon State Forest District Office (there is a sign in front of the office) and take the next right hand turn then bear to the right towards SB Elliott State Park to the Annex Office. If traveling south on State Route 153 to our office, turn left at SB Elliott State Park sign then bear right towards SB Elliott State Park to the Annex Office. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
12/04/2025 07:00 PM UTC
OOGM FS25-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells Millcreek, Fairview, Girard, and Harborcreek Townships City of Erie, Erie County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-five (25) orphan oil and gas wells, estimated to be 750 to 2,500 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: November 5 and November 6 at 9:00 a.m. Department representatives will meet contractors at: Tom Ridge Environment Center, 301 Peninsula Drive, Erie, PA 16505, 42.11016, -80.15411. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
12/04/2025 07:00 PM UTC
OSM 17(7183)101.1
Abandoned Mine Reclamation Project Goshen West Goshen Township, Clearfield County Estimated Amount: $500,000-$1,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F. Clearing and Grubbing, 27.8 Acre Grading - Grading, 216,478 C.Y. Grading – Hummocky Piles, 14.3 Acre Grading – Ripping, 13.5 Acre Planting – Planting Preparation, 27.8 Acre Planting – Tree Seedlings, 18.904 Each
11/06/2025 07:00 PM UTC
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells Highland Township, Elk County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m. Department representatives will meet contractors at: Lamont Tool Shop Warehouse Rd (FR 337) 41.5347, -78.9143 To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/06/2025 07:00 PM UTC
OSM 17(4543)101.1
Abandoned Mine Reclamation Project Alder Run Morris Township, Clearfield County Estimated Amount: $300,000-$500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F. Clearing and Grubbing, 21.7 ACRE Grading - Grading, 149,622 C.Y. Grading - Ripping, 0.6 ACRE Planting - Planting Preparation, 21.7 ACRE Planting - Tree Seedlings, 408 EACH Dewatering Impoundments, 1 L.S. Sediment Basin and Vernal Pool Construction, 1 L.S.
11/06/2025 07:00 PM UTC
OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells Lancaster, Forward, and Connoquenessing Townships, Butler County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m. Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
10/30/2025 06:00 PM UTC
OSM 65(1963)101.1
Abandoned Mine Reclamation Project Boxcartown North Murrysville Borough, Westmoreland County Estimated Amount: $300,000-$500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,802 L.F. Clearing and Grubbing, 11.7 ACRE Grading, 83,489 C.Y. Planting – Tree Seedlings, 5,848 EACH Access Road, 1 EACH Gas Line Crossings, 1 L.S.
10/23/2025 06:00 PM UTC
OSM 17(7105)101.1
Abandoned Mine Reclamation Project Eagle Eye School (Thomas) Boggs and Decatur Townships, Clearfield County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 6,000 L.F. Clearing and Grubbing, 58 ACRE Brush Barriers, 5,000 L.F. Grading – Grading Area 1, 399,819 C.Y. Grading – Grading Area 2, 178,893 C.Y. Planting – Tree Seedlings, 36,095 EACH Gas Line Crossings, 1 L.S. Infiltration Trench, 1,016 L.F.
10/16/2025 06:00 PM UTC
OSM 26(1269)101.1
Abandoned Mine Reclamation Project Roundtop Southwest Lower Tyrone Township, Fayette County Estimated Amount: $1,000,000 to $5,000,000 Term: 730 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 3 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 9,625 L.F. Clearing and Grubbing, 51.7 ACRE Grading, 386,057 C.Y. Channel Excavation, 81 C.Y. Planting – Planting Preparation, 51.7 ACRE Subsurface Drains, 900 L.F. Gas Line Relocation – Grading Area 1, 1 INVOICE Fence – Temporary Field Fence, 3,332 L.F. Fence – Permanent Field Fence, 3,820 L.F.
10/09/2025 06:00 PM UTC
OSM 32(4601)101.1
Abandoned Mine Reclamation Project Middle Dixon Creek East Mahoning Township, Indiana County Estimated Amount: $300,000-$500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 2,186 L.F. Clearing and Grubbing, 18.1 Acre Grading - Grading, 179,064 C.Y. Grading – Ripping, 3.2 Acre Planting – Planting Preparation, 18.1 Acre Permanent Channel Excavation, 26 C.Y. Access Road, 1,145 L.F.
10/09/2025 06:00 PM UTC
1 - 10 of 184 Solicitations