OSM 17(7158)103.1
Abandoned Mine Reclamation Project
Shawville North
Goshen Township, Clearfield County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $1,000,000 to $5,000,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 3,000 L.F.
Clearing and Grubbing, 1 L.S.
Selective Grading, 2,100 S.Y.
Seeding – Seed Bed Preparation,10 ACRE
| 06/26/2025 06:00 PM UTC |
OSM 40(1381)103.1
Abandoned Mine Reclamation Project
Freeland South
Hazle Township, Luzerne County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 90 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Demolition of Structures
Grading -15,435 C.Y.
Sealing Boreholes– 3
Seeding – 3.3 Acres
| 07/03/2025 06:00 PM UTC |
OSM 11(0826)104.1
Abandoned Mine Reclamation Project
Spangler Athletic Field
Northern Cambria Borough, Cambria County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12”
Diameter), 300 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Inlet Filter Bag, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Pumped Water Filter Bag, 5 EACH
Clearing and Grubbing, 1 L.S.
Diversion and Care of Water, 1 L.S.
Road and Sidewalk Replacement – Roadway Restoration, 5 S.Y.
Road and Sidewalk Replacement – Temporary Paving, 11 S.Y.
Road and Sidewalk Replacement – Concrete Sidewalk Restoration, 5 S.Y.
Road and Sidewalk Replacement – Gravel Driveway/Sidewalk Restoration, 10 S.Y.
Traffic Control, 1 L.S.
Subsurface Drain – Twelve-Inch (12”) Polyvinyl Chloride (PVC) Pipe, 360 L.F.
Subsurface Drain – Cleanouts, 3 EACH
Subsurface Drain – Connection to Mine Drift, 1 L.S.
Subsurface Drain – Connection to Existing Storm Inlet, 1 L.S.
Subsurface Drain – Reconnection of Existing Mine Drain to New Drain, 1 L.S.
Subsurface Drain – Reconnection of Existing Homeowner Drain, 2 EACH
Seeding – Seeding, 1 L.S.
Seeding – Additional Topsoil, 10 TON
| 07/03/2025 06:00 PM UTC |
OOGM FS24-5
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells
East Keating Township, Clinton County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 825 to 4,200 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 26, 2025, at 10:00 a.m.
Department representatives will meet contractors at: 41.261528, -77.913032.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/17/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSM 13,54(3204)101.1
Abandoned Mine Reclamation Project
Honeybrook-Audenried
Banks Township, Carbon County
Kline Township, Schuylkill County
Estimated Amount: $500,000-$1,000,000
Term: 90 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal and Disposal of Structures
Seedings
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 18%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/30/2023 07:00 PM UTC |
OSM 65(1199)102.1
Abandoned Mine Reclamation Project
Bovard Area Wide Subsidence
Hempfield Township, Westmoreland County
Estimated Amount: Greater Than $5,000,000
Term: 630 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Overburden Drilling and Casing, Steel or PVC, 10,203 L.F.
Four-Inch (4") Air Rotary Drilling, 33,942 L.F.
Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 32,224 L.F.
Supply and Delivery, Mixing and Injection of Grout Material - Cement, 5,045 TON
Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 29,522 DRY TON
Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 57), 20 TON
Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 17,892 DRY TON
Injection Site Preparation and Site Restoration, 497 EACH
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/30/2023 07:00 PM UTC |
OSM 26(0690)101.1
Abandoned Mine Reclamation Project, Juniata West, Franklin Township, Fayette County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 2 Each
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 1,800 L.F.
Clearing and Grubbing, 1 L.S.
Grading, 16,060 C.Y.
Seeding – Seed Bed Preparation, 6.3 Acre
| 08/31/2023 06:00 PM UTC |
OOGM 23-1 (Reissued Extension)
Cleaning Out and Plugging Thirteen (13) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug thirteen (13) abandoned injection wells, estimated to be up to 2,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 29, 2023 at 9:00 a.m.
Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/27/2023 06:00 PM UTC |
OOGM 23-3
Cleaning Out and Plugging Ten (10) Abandoned Permitted/Rule Authorized IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug ten (10) abandoned injection wells,
estimated to be up to 2,700 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 29, 2023, at 9:00 a.m.
Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/20/2023 06:00 PM UTC |
OOGM 23-1
Cleaning Out and Plugging Thirteen (13) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug thirteen (13) abandoned injection wells, estimated to be up to 2,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 29, 2023 at 9:00 a.m.
Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/20/2023 12:00 PM UTC |
BF63080601.1
Bond Forfeiture Land Reclamation, Green Global Machine 221 LNC Land Reclamation Project, Buffalo Township, Washington County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 180 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization/Demobilization of Necessary Reclamation Equipment
Backfilling Highwall or Blasting Highwall (Approx. 60,000 CY)
Topsoil Spreading – Approximately 15,000 CY
Regrading/Revegetation – 5 Acres
Remove One Pond
Place Gravel Over Pond Removal Area – Approx. 25 TON
Regrade/Spread Topsoil and Revegetate Approximately 5 Acres According to the Approved Reclamation Plan
Repair All Erosion Gullies
Remove Any Assorted Trash, Abandoned Equipment and Parts Left Behind by Green Global Machine
| 06/22/2023 06:00 PM UTC |
EC-04-80073-23
Storage Tank Removal, Jim's Sunoco Service Inc., New Brighton Borough, Beaver County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Certified Asbestos Inspector Evaluation 1 L.S.
10 Day Notification to DEP AQ Program SWRO 1 L.S.
Demolition of Building and Canopy in North Tank Field 2 L.S.
Licensed Asbestos Abatement Contractor, If Necessary, For Removal 1 L.S.
Excavation, Removal, and Disposal of Underground Storage Tank Systems
A. Excavation 5 L.S.
B. 5 Underground Storage Tanks (5 Storage Tanks 001, 002, 007, 008, 009), Cleaning, Removal and Disposal and/or Salvage of Underground Tank and Appurtenances 5 L.S.
Removal and Disposal of Residual Liquids from Underground Storage Tank Systems 5 Drums
Site Access and Restriction 1 L.S.
Backfill 256 Tons
Project Completion Report 1 L.S.
| 06/01/2023 06:00 PM UTC |
EC-10-91063-23
Storage Tank Removal, McCandless Tank Removal, Worth Township, Butler County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 180 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Excavation, Removal, and Disposal of Underground Storage Tank Systems
A. Excavation 4 L.S.
B. 4 Underground Storage Tanks, Cleaning, Removal and Disposal and/or Salvage of Underground Tank and Appurtenances 4 L.S.
Removal and Disposal of Residual Liquids from Underground Storage Tank Systems 4 Drums
Site Access and Restriction 1 L.S.
Backfill 155 Tons
Underground Storage Tank System Closure Report 1 L.S.
Closure Notification Form 1 L.S.
Storage Tanks Permitting/Application Registration Form 1 L.S.
MANDATORY Pre-Bid Conference will be held on: May 3, 2023, at 10:00 a.m.
Department representatives will meet contractors at: 895 New Castle Road, Slippery Rock, PA 16057
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/25/2023 06:00 PM UTC |
OSM 17(6868)101.1
Abandoned Mine Reclamation Project, Smoke Run East, Gulich Township and Ramey Borough, Clearfield County
Estimated Amount: $500,000 to $1,000,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter
Sock, 3,300 L.F.
Access Road – AASHTO No. 1 Coarse Aggregate, 2,600 C.Y.
Access Road – PA DOT 2A Coarse Aggregate, 1,300 C.Y.
Grading, 98,950 C.Y.
Smooth-Interior Corrugated Polyethylene Pipe – Thirty-six Inch (36”) Diameter, 220 L.F.
Walking Trail, 1,330 S.Y.
Tree Planting, 110 Each,
Subsurface Drain – Twelve-Inch (12”) Perforated Smooth-Interior Corrugated
Polyethylene Pipe, 2,010 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 655 C.Y.
| 03/02/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.