Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells
Lancaster, Forward, and Connoquenessing Townships, Butler County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m.
Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 10/30/2025 06:00 PM UTC |
|
OSM 17(7183)101.1
Abandoned Mine Reclamation Project
Goshen West
Goshen Township, Clearfield County
Estimated Amount: $500,000-$1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F.
Clearing and Grubbing, 27.8 Acre
Grading - Grading, 216,478 C.Y.
Grading – Hummocky Piles, 14.3 Acre
Grading – Ripping, 13.5 Acre
Planting – Planting Preparation, 27.8 Acre
Planting – Tree Seedlings, 18.904 Each
| 11/06/2025 07:00 PM UTC |
|
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells
Highland Township, Elk County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m.
Department representatives will meet contractors at:
Lamont Tool Shop
Warehouse Rd (FR 337)
41.5347, -78.9143
To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/06/2025 07:00 PM UTC |
|
OSM 17(4543)101.1
Abandoned Mine Reclamation Project
Alder Run
Morris Township, Clearfield County
Estimated Amount: $300,000-$500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F.
Clearing and Grubbing, 21.7 ACRE
Grading - Grading, 149,622 C.Y.
Grading - Ripping, 0.6 ACRE
Planting - Planting Preparation, 21.7 ACRE
Planting - Tree Seedlings, 408 EACH
Dewatering Impoundments, 1 L.S.
Sediment Basin and Vernal Pool Construction, 1 L.S.
| 11/06/2025 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 54(4663)101.1
Abandoned Mine Reclamation Project
Coal Castle Revitalization
New Castle Township, Schuylkill County
Estimated Amount: $1,000,000 to $5,000,000
Term: 550 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Grading – 511,000 cubic yards
Dewatering Impoundment – 1 lump sum
Drainage Excavation – 1,060 cubic yards
Rock Lining – 1,340 square yards
Rock Crawling Pathway – 2,270 square yards
Seeding – 44 acres
| 10/10/2024 06:00 PM UTC |
|
OSM 10(2900)101.1
Abandoned Mine Reclamation Project
West Liberty No. 1
Brady Township, Butler County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, 1,728 L.F.
Grading – Grading, 175,894 C.Y.
Seeding – Seed Bed Preparation, 21.0 ACRE
Fence – Permanent Fence, 1,500 L.F.
| 09/19/2024 06:00 PM UTC |
|
OOGM 24-1
Cleaning Out and Plugging Twenty (20) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty (20) Abandoned Injection Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: July 17th, 2024, at 8:00 a.m.
Department representatives will meet contractors at: 41.534820, -78.914210.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 08/01/2024 06:00 PM UTC |
|
OSM 10(6599)101.1
Abandoned Mine Reclamation Project
DeSale South
Venango Township, Butler County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 2 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Eighteen-Inch (18") Diameter, 300 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Thirty-Six-Inch (36") Diameter, Stacked, 2,232 L.F.
Grading, 87,000 C.Y.
Planting - Tree Planting Bed Preparation, 9 ACRE
Planting - Grass Seed Bed Preparation, 2 ACRE
Planting - Tree Seedlings, 5,550 EACH
| 07/25/2024 06:00 PM UTC |
|
OSM 10(2904)101.1
Abandoned Mine Reclamation Project
Slippery Rock Creek
Marion Township, Butler County
Estimated Amount: $300,000-$500,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 2,014 L.F.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,718 L.F.
Grading, 127,498 C.Y.
| 06/13/2024 06:00 PM UTC |
|
OSM 16(1957)101.1
Abandoned Mine Reclamation Project
Mahles Run East
Knox and Washington Townships, Clarion County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32"Diameter), 1,414 L.F.
Sealing Collapsed Mine Entry, 1 EACH
Subsurface Drain, 494 L.F.
Grading – Grading, 35,543 C.Y.
Seeding – Mulching, 6.8 ACRE
| 05/30/2024 06:00 PM UTC |
|
OSM 10(6495)101.1
Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672 L.F.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,750 L.F.
Grading, 252,589 C.Y.
Planting – Tree Seedlings, 9,318 EACH
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 05/09/2024 06:00 PM UTC |
|
OSM 10(6493)102.1
Abandoned Mine Reclamation Project West Liberty East #3, Brady Township and West Liberty Borough, Butler County
Estimated Amount: $300,000-$500,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32" Diameter), 1,530 L.F.
Grading - Grading, 66,293 C.Y.
Subsurface Drain, 386 L.F.
Sealing Mine Openings - Sealing Mine Openings, 1 EACH
| 04/04/2024 06:00 PM UTC |
|
OSM 33(4911)101.1
Abandoned Mine Reclamation Project
South Timblin
Porter Township, Jefferson County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction, Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter, Sock Eighteen-Inch (18”) Diameter, Stacked, 2,050 L.F.
Grading, 35,500 C.Y.
Seeding – Seed Bed Preparation, 5.0 Acres
| 03/14/2024 06:00 PM UTC |
|
OSM 32(3591)101.1
Abandoned Mine Reclamation Project
Johnsonburg #2
Banks Twp., Indiana County
Estimated Amount: $200,000-$299,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter
Sock (32” Diameter), 1,100 L.F.
Grading – Grading, 18,700 C.Y.
Subsurface Highwall Drain, 450 L.F.
Planting – Tree Seedlings, 2,584 EACH
| 02/22/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.