Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OOGM FS25-6
Cleaning Out and Plugging Six (6) Orphan Gas Wells
Center Township, Butler County
Estimated Amount: $300,000-$500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug six (6) orphan gas wells, estimated to be 1700 to 2200 feet in depth, to
Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 4, 2026, at 10:00 a.m.
Department representatives will meet contractors at:
Adelman Fields
299 Old Plank Road
Butler, PA
Meet in parking lot of baseball field.
40.824529, -79.909805
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/26/2026 07:00 PM UTC |
|
OOGM FS25-4
Cleaning Out and Plugging Three (3) Orphan Gas Wells
Allegheny Township, Westmoreland County
Estimated Amount: $300,000-$500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug three (3) orphan gas wells, estimated to be 3500-4000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 18, 2026, at 10:00 a.m.
Department representatives will meet contractors at: Baseball Field #4, 236 Air Shaft Road, Apollo, PA 15613, 40.580182, -79.620358.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 03/26/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 10(6599)101.1
Abandoned Mine Reclamation Project
DeSale South
Venango Township, Butler County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 2 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Eighteen-Inch (18") Diameter, 300 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Thirty-Six-Inch (36") Diameter, Stacked, 2,232 L.F.
Grading, 87,000 C.Y.
Planting - Tree Planting Bed Preparation, 9 ACRE
Planting - Grass Seed Bed Preparation, 2 ACRE
Planting - Tree Seedlings, 5,550 EACH
| 07/25/2024 06:00 PM UTC |
|
OSM 10(2904)101.1
Abandoned Mine Reclamation Project
Slippery Rock Creek
Marion Township, Butler County
Estimated Amount: $300,000-$500,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 2,014 L.F.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,718 L.F.
Grading, 127,498 C.Y.
| 06/13/2024 06:00 PM UTC |
|
OSM 16(1957)101.1
Abandoned Mine Reclamation Project
Mahles Run East
Knox and Washington Townships, Clarion County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32"Diameter), 1,414 L.F.
Sealing Collapsed Mine Entry, 1 EACH
Subsurface Drain, 494 L.F.
Grading – Grading, 35,543 C.Y.
Seeding – Mulching, 6.8 ACRE
| 05/30/2024 06:00 PM UTC |
|
OSM 10(6495)101.1
Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672 L.F.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,750 L.F.
Grading, 252,589 C.Y.
Planting – Tree Seedlings, 9,318 EACH
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 05/09/2024 06:00 PM UTC |
|
OSM 10(6493)102.1
Abandoned Mine Reclamation Project West Liberty East #3, Brady Township and West Liberty Borough, Butler County
Estimated Amount: $300,000-$500,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32" Diameter), 1,530 L.F.
Grading - Grading, 66,293 C.Y.
Subsurface Drain, 386 L.F.
Sealing Mine Openings - Sealing Mine Openings, 1 EACH
| 04/04/2024 06:00 PM UTC |
|
OSM 33(4911)101.1
Abandoned Mine Reclamation Project
South Timblin
Porter Township, Jefferson County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction, Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter, Sock Eighteen-Inch (18”) Diameter, Stacked, 2,050 L.F.
Grading, 35,500 C.Y.
Seeding – Seed Bed Preparation, 5.0 Acres
| 03/14/2024 06:00 PM UTC |
|
OSM 32(3591)101.1
Abandoned Mine Reclamation Project
Johnsonburg #2
Banks Twp., Indiana County
Estimated Amount: $200,000-$299,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter
Sock (32” Diameter), 1,100 L.F.
Grading – Grading, 18,700 C.Y.
Subsurface Highwall Drain, 450 L.F.
Planting – Tree Seedlings, 2,584 EACH
| 02/22/2024 07:00 PM UTC |
|
EC-65-81369-23
Storage Tank Removal
Pitzer Transport, Inc.
City of Jeannette, Westmoreland County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal of one steel underground storage tank system. (1 10,000-gallon diesel underground storage tank)
Tank is uncapped and has 25 5/8 inches of water and 3/8 inches of product at the last inspection. There is a need to pump the tanks of liquid and property dispose of liquid.
A closure report is required as well as closure sampling.
| 02/22/2024 07:00 PM UTC |
|
OSM 13,54(3204)101.1
Abandoned Mine Reclamation Project
Honeybrook-Audenried
Banks Township, Carbon County
Kline Township, Schuylkill County
Estimated Amount: $500,000-$1,000,000
Term: 90 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal and Disposal of Structures
Seedings
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 18%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/30/2023 07:00 PM UTC |
|
OSM 65(1199)102.1
Abandoned Mine Reclamation Project
Bovard Area Wide Subsidence
Hempfield Township, Westmoreland County
Estimated Amount: Greater Than $5,000,000
Term: 630 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Overburden Drilling and Casing, Steel or PVC, 10,203 L.F.
Four-Inch (4") Air Rotary Drilling, 33,942 L.F.
Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 32,224 L.F.
Supply and Delivery, Mixing and Injection of Grout Material - Cement, 5,045 TON
Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 29,522 DRY TON
Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 57), 20 TON
Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 17,892 DRY TON
Injection Site Preparation and Site Restoration, 497 EACH
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/30/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.