Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSM 61(0807,6967)101.1
Abandoned Mine Reclamation Project
Smith Corners
Clinton Township, Venango County
Estimated Amount: $500,000 to $1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 3 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 4,650 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,145 L.F.
Clearing and Grubbing, 23.1 ACRE
Grading – Grading Area 1, 24,450 C.Y.
Grading – Grading Area 2, 141,209 C.Y.
Grading – Grading Area 3, 13,626 C.Y.
Grading – Ripping, 15.2 ACRE
Planting – Planting Preparation, 23.1 ACRE
Planting – Tree Seedlings, 10,345 EACH
Planting – Grass Seed, 240 LB.
Subsurface Drain, 1,990 L.F.
Permanent Channel Excavation, 208 C.Y.
Erosion Matting, 767 S.Y.
Selective Grading, 200 ACRE
Implementation of the Traffic Control Plan, 1 L.S.
| 06/04/2026 06:00 PM UTC |
|
OSM 17(6425)101.1
Abandoned Mine Reclamation Project
Keewaydin
Covington and Karthaus Townships, Clearfield County
Estimated Amount: $1,000,000-$5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (24” Diameter), 2,580 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 4,370 L.F.
Clearing and Grubbing, 20 ACRE
Demolition, Removal and Disposal of Buildings and Equipment, 1 L.S.
Dewatering and Diversion and Care of Water, 1 L.S.
Stream Crossings - Stream Crossing 1 - Rock Ford, 200 TON
Stream Crossings - Stream Crossing 2 - 60" RCEP, 50 L.F.
Stream Crossings - Stream Crossing 2 - R-6 Rock, 50 S.Y.
Stream Crossings - Stream Crossing 2 - 2A Aggregate, 90 C.Y.
Stream Crossings - Stream Crossing 3 - 72" RCEP, 150 L.F.
Stream Crossings - Stream Crossing 3 - R-6 Rock, 180 S.Y.
Stream Crossings - Stream Crossing 3 - 2A Aggregate, 230 C.Y.
Special Handling of Refuse Material - Baghouse Lime, 2,700 TON
Special Handling of Refuse Material - Placement of Refuse Mixture, 42,420 C.Y.
Grading – Grading, 70,000 C.Y.
Grading – Ripping, 10 ACRE
Selective Grading, 10 ACRE
Access Road, 2,600 L.F.
Planting/Seeding - Planting Preparation, 20 ACRE
Planting/Seeding - Tree Seedlings, 6,800 EACH
| 06/04/2026 06:00 PM UTC |
|
OOGM FS26-3
Cleaning Out and Plugging One (1) Abandoned Gas Well
Moon Township, Allegheny County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug one (1) abandoned gas well, estimated to be approximately 2000’ feet in depth, to Department specifications.
Prepare and restore well site
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: May 13, 2026, at 10:00 a.m.
Department representatives will meet contractors at:
Robert Morris University
Parking Area on Colonial Way (Next to Baseball Field)
40.523194, -80.210583
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 06/18/2026 06:00 PM UTC |
|
OSM 05(2002,7054)101.1
Abandoned Mine Reclamation Project
Kimber Mountain NW
Broad Top Township, Bedford County
Estimated Amount: Greater than $5,000,000
Term: 730 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 4 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 17,674 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Riprap Apron, 89 S.Y.
Clearing and Grubbing – Grading Area 1, 79.0 ACRE
Clearing and Grubbing – Grading Area 2, 17.2 ACRE
Clearing and Grubbing – Grading Area 3, 7.4 ACRE
Clearing and Grubbing – Grading Area 4, 1.9 ACRE
Clearing and Grubbing – Grading Area 5, 35.6 ACRE
Clearing and Grubbing – Grading Area 6, 7.5 ACRE
Access Road – New Road Construction, 1,826 L.F.
Access Road – Install Two-Inch (2”) PennDOT 2A on all roads at end of project, 2,229 TON
Subsurface Drain, 3,844 L.F.
Dewatering Impoundments, 1 L.S.
Grading – Grading Area 1, 1,133,874 C.Y.
Grading – Grading Area 2, 114,232 C.Y.
Grading – Grading Area 3, 33,166 C.Y.
Grading – Grading Area 4, 8,618 C.Y.
Grading – Grading Area 5, 490,907 C.Y.
Grading – Grading Area 6, 68,351 C.Y.
Permanent Channel Excavation, 360 C.Y.
Rock Lining, 2,436 S.Y.
Seeding – Seed Bed Preparation, 148.6 ACRE
Seeding – Seed, 6,241 LB.
Woodrat Mitigation Structures, 9 EACH
MANDATORY Pre-Bid Conference will be held on: June 1, 2026, at 9:00 a.m.
Department representatives will meet contractors at: 40°07'23.19"N 78°14'20.28"W
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 06/18/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 26(3858)101.1
Abandoned Mine Reclamation Project
Bowood Northwest
Nicholson Township, Fayette County
Estimated Amount: $500,000 to $1,000,000
Term: 365 calendar days
Bid Bond Required
Mandatory Pre-Bid Meeting: No
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 1,669 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube, 241 L.F.
Clearing and Grubbing, 15.5 ACRE
Grading - Grading, 227,664 C.Y.
Grading – Hummocky Piles, 6.7 ACRE
Grading – Ripping, 2.3 ACRE
Planting – Tree Seedlings, 6,136 EACH
| 02/06/2025 07:00 PM UTC |
|
OSM 63(4744)101.1
Abandoned Mine Reclamation Project
Speers West
Fallowfield Township, Washington County
Estimated Amount: $300,000-$500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 730 L.F.
Clearing and Grubbing, 20 ACRE
Grading, 156,590 C.Y.
Planting – Tree Seedlings, 1,054 EACH
Access Road – 1 EACH
Gas Line Crossings – 1 L.S.
| 01/09/2025 07:00 PM UTC |
|
OSM 16(0030)101.1
Abandoned Mine Reclamation Project
Sarah Furnace
Madison Township, Clarion County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 210 calendar days
Bid Bond Required
Mandatory Pre-Bid Meeting: No
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 900 L.F.
Clearing and Grubbing, 2.8 ACRE
Grading, 16,150 C.Y.
Planting, Tree Seedlings, 480 EACH
| 11/07/2024 07:00 PM UTC |
|
OSM 19(2000)104.1
Abandoned Mine Reclamation Project
314 East Park Street Demolition
Conyngham Township, Columbia County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 30 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of E&S Controls – Filter Sock (8” Diameter), 375 L.F.
Grading, 100 C.Y.
| 11/07/2024 07:00 PM UTC |
|
OSM 03(3368)101.1
Abandoned Mine Reclamation Project
Belnap South
Brady Township
Armstrong County
Estimated Amount: $300,000-$500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 3,144 L.F.
Clearing and Grubbing, 18.8 ACRE
Grading, 179,958 C.Y.
Mushroom Compost, 1,880 C.Y.
| 10/31/2024 06:00 PM UTC |
|
OSM 02(1726)102.1
Abandoned Mine Reclamation Project
Graham Boulevard
Municipality of Penn Hills, Allegheny County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 1,173 C.Y
Precast Inlet Box, 1 EACH
Repaving - PA DOT 2A Stone, 1.39 C.Y.
Repaving - Twenty-five-millimeter (25 mm) Superpave Base Course, 1.225 TON
Repaving - Nineteen-millimeter (19 mm) Superpave Binder Course, 0.6125 TON
Repaving - Nine and one-half millimeter (9.5 mm) Superpave Wearing Course, 4.36 S.Y.
Traffic Control, 1 L.S.
Subsurface Drain - Eight-Inch (8”) Nominal Diameter
Subsurface Drain - Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 151 L.F.
Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 1,173 C.Y.
Seeding – Seeding, 1 L.S.
Seeding – Topsoil, 1 TON
| 10/17/2024 06:00 PM UTC |
|
OSM 54(4663)101.1
Abandoned Mine Reclamation Project
Coal Castle Revitalization
New Castle Township, Schuylkill County
Estimated Amount: $1,000,000 to $5,000,000
Term: 550 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Grading – 511,000 cubic yards
Dewatering Impoundment – 1 lump sum
Drainage Excavation – 1,060 cubic yards
Rock Lining – 1,340 square yards
Rock Crawling Pathway – 2,270 square yards
Seeding – 44 acres
| 10/10/2024 06:00 PM UTC |
|
OSM 10(2900)101.1
Abandoned Mine Reclamation Project
West Liberty No. 1
Brady Township, Butler County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, 1,728 L.F.
Grading – Grading, 175,894 C.Y.
Seeding – Seed Bed Preparation, 21.0 ACRE
Fence – Permanent Fence, 1,500 L.F.
| 09/19/2024 06:00 PM UTC |
|
OOGM 24-1
Cleaning Out and Plugging Twenty (20) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty (20) Abandoned Injection Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: July 17th, 2024, at 8:00 a.m.
Department representatives will meet contractors at: 41.534820, -78.914210.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 08/01/2024 06:00 PM UTC |
|
OSM 10(6599)101.1
Abandoned Mine Reclamation Project
DeSale South
Venango Township, Butler County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 2 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Eighteen-Inch (18") Diameter, 300 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Thirty-Six-Inch (36") Diameter, Stacked, 2,232 L.F.
Grading, 87,000 C.Y.
Planting - Tree Planting Bed Preparation, 9 ACRE
Planting - Grass Seed Bed Preparation, 2 ACRE
Planting - Tree Seedlings, 5,550 EACH
| 07/25/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.