Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OOGM 25-2
Cleaning Out and Plugging Eleven (11) Abandoned/Orphaned Wells
Howe Township, Forest County
Estimated Amount: $300,000-$500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug eleven (11) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: March 11, 2026, at 9:00 a.m.
Department representatives will meet contractors at: Parking Area across from Minister Creek Campground on Rt. 666 in Howe Township. 41.6206396, -79.1536190
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 04/09/2026 06:00 PM UTC |
|
OSM 17(3982)101.1 and OSM 17(3982)102.1
Abandoned Mine Reclamation Project
Parsonville Northwest and Parsonville Northwest 2
Decatur Township, Clearfield County
Estimated Amount: $300,000-$500,000
Term: 240 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 2,700 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Temporary Stream
Crossing, 1 L.S.
Clearing and Grubbing, 15.5 ACRE
Grading – Grading Area 1, 26,000 C.Y.
Grading – Grading Area 2, 57,000 C.Y.
Planting – Planting Preparation, 15.5 ACRE
| 04/09/2026 06:00 PM UTC |
|
OOGM FS25-3
Cleaning Out and Plugging Five (5) Orphan Gas Wells
Sandycreek Township, Venango County
Estimated Amount: $300,000-$500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug five (5) orphan gas wells, estimated to be 500-1250 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: April 1, 2026, at 10:00 a.m.
Department representatives will meet contractors at: Rails to Trails entrance off Belmar Road
41.333279, -79.774949
Belmar Road, Franklin, PA 16323
https://maps.app.goo.gl/wNpiW1xebcDNKF7r5
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/07/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 54(4663)101.1
Abandoned Mine Reclamation Project
Coal Castle Revitalization
New Castle Township, Schuylkill County
Estimated Amount: $1,000,000 to $5,000,000
Term: 550 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Grading – 511,000 cubic yards
Dewatering Impoundment – 1 lump sum
Drainage Excavation – 1,060 cubic yards
Rock Lining – 1,340 square yards
Rock Crawling Pathway – 2,270 square yards
Seeding – 44 acres
| 10/10/2024 06:00 PM UTC |
|
OSM 10(2900)101.1
Abandoned Mine Reclamation Project
West Liberty No. 1
Brady Township, Butler County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, 1,728 L.F.
Grading – Grading, 175,894 C.Y.
Seeding – Seed Bed Preparation, 21.0 ACRE
Fence – Permanent Fence, 1,500 L.F.
| 09/19/2024 06:00 PM UTC |
|
OOGM 24-1
Cleaning Out and Plugging Twenty (20) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty (20) Abandoned Injection Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: July 17th, 2024, at 8:00 a.m.
Department representatives will meet contractors at: 41.534820, -78.914210.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 08/01/2024 06:00 PM UTC |
|
OSM 10(6599)101.1
Abandoned Mine Reclamation Project
DeSale South
Venango Township, Butler County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 2 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Eighteen-Inch (18") Diameter, 300 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Thirty-Six-Inch (36") Diameter, Stacked, 2,232 L.F.
Grading, 87,000 C.Y.
Planting - Tree Planting Bed Preparation, 9 ACRE
Planting - Grass Seed Bed Preparation, 2 ACRE
Planting - Tree Seedlings, 5,550 EACH
| 07/25/2024 06:00 PM UTC |
|
OSM 10(2904)101.1
Abandoned Mine Reclamation Project
Slippery Rock Creek
Marion Township, Butler County
Estimated Amount: $300,000-$500,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 2,014 L.F.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,718 L.F.
Grading, 127,498 C.Y.
| 06/13/2024 06:00 PM UTC |
|
OSM 16(1957)101.1
Abandoned Mine Reclamation Project
Mahles Run East
Knox and Washington Townships, Clarion County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32"Diameter), 1,414 L.F.
Sealing Collapsed Mine Entry, 1 EACH
Subsurface Drain, 494 L.F.
Grading – Grading, 35,543 C.Y.
Seeding – Mulching, 6.8 ACRE
| 05/30/2024 06:00 PM UTC |
|
OSM 10(6495)101.1
Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672 L.F.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,750 L.F.
Grading, 252,589 C.Y.
Planting – Tree Seedlings, 9,318 EACH
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 05/09/2024 06:00 PM UTC |
|
OSM 10(6493)102.1
Abandoned Mine Reclamation Project West Liberty East #3, Brady Township and West Liberty Borough, Butler County
Estimated Amount: $300,000-$500,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32" Diameter), 1,530 L.F.
Grading - Grading, 66,293 C.Y.
Subsurface Drain, 386 L.F.
Sealing Mine Openings - Sealing Mine Openings, 1 EACH
| 04/04/2024 06:00 PM UTC |
|
OSM 33(4911)101.1
Abandoned Mine Reclamation Project
South Timblin
Porter Township, Jefferson County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction, Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter, Sock Eighteen-Inch (18”) Diameter, Stacked, 2,050 L.F.
Grading, 35,500 C.Y.
Seeding – Seed Bed Preparation, 5.0 Acres
| 03/14/2024 06:00 PM UTC |
|
OSM 32(3591)101.1
Abandoned Mine Reclamation Project
Johnsonburg #2
Banks Twp., Indiana County
Estimated Amount: $200,000-$299,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter
Sock (32” Diameter), 1,100 L.F.
Grading – Grading, 18,700 C.Y.
Subsurface Highwall Drain, 450 L.F.
Planting – Tree Seedlings, 2,584 EACH
| 02/22/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.