General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSM 61(0807,6967)101.1
Abandoned Mine Reclamation Project Smith Corners Clinton Township, Venango County Estimated Amount: $500,000 to $1,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 3 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 4,650 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,145 L.F. Clearing and Grubbing, 23.1 ACRE Grading – Grading Area 1, 24,450 C.Y. Grading – Grading Area 2, 141,209 C.Y. Grading – Grading Area 3, 13,626 C.Y. Grading – Ripping, 15.2 ACRE Planting – Planting Preparation, 23.1 ACRE Planting – Tree Seedlings, 10,345 EACH Planting – Grass Seed, 240 LB. Subsurface Drain, 1,990 L.F. Permanent Channel Excavation, 208 C.Y. Erosion Matting, 767 S.Y. Selective Grading, 200 ACRE Implementation of the Traffic Control Plan, 1 L.S.
06/04/2026 06:00 PM UTC
OSM 17(6425)101.1
Abandoned Mine Reclamation Project Keewaydin Covington and Karthaus Townships, Clearfield County Estimated Amount: $1,000,000-$5,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (24” Diameter), 2,580 L.F. Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 4,370 L.F. Clearing and Grubbing, 20 ACRE Demolition, Removal and Disposal of Buildings and Equipment, 1 L.S. Dewatering and Diversion and Care of Water, 1 L.S. Stream Crossings - Stream Crossing 1 - Rock Ford, 200 TON Stream Crossings - Stream Crossing 2 - 60" RCEP, 50 L.F. Stream Crossings - Stream Crossing 2 - R-6 Rock, 50 S.Y. Stream Crossings - Stream Crossing 2 - 2A Aggregate, 90 C.Y. Stream Crossings - Stream Crossing 3 - 72" RCEP, 150 L.F. Stream Crossings - Stream Crossing 3 - R-6 Rock, 180 S.Y. Stream Crossings - Stream Crossing 3 - 2A Aggregate, 230 C.Y. Special Handling of Refuse Material - Baghouse Lime, 2,700 TON Special Handling of Refuse Material - Placement of Refuse Mixture, 42,420 C.Y. Grading – Grading, 70,000 C.Y. Grading – Ripping, 10 ACRE Selective Grading, 10 ACRE Access Road, 2,600 L.F. Planting/Seeding - Planting Preparation, 20 ACRE Planting/Seeding - Tree Seedlings, 6,800 EACH
06/04/2026 06:00 PM UTC
OOGM FS26-3
Cleaning Out and Plugging One (1) Abandoned Gas Well Moon Township, Allegheny County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug one (1) abandoned gas well, estimated to be approximately 2000’ feet in depth, to Department specifications. Prepare and restore well site Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: May 13, 2026, at 10:00 a.m. Department representatives will meet contractors at: Robert Morris University Parking Area on Colonial Way (Next to Baseball Field) 40.523194, -80.210583 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
06/18/2026 06:00 PM UTC
OSM 05(2002,7054)101.1
Abandoned Mine Reclamation Project Kimber Mountain NW Broad Top Township, Bedford County Estimated Amount: Greater than $5,000,000 Term: 730 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 4 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 17,674 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Riprap Apron, 89 S.Y. Clearing and Grubbing – Grading Area 1, 79.0 ACRE Clearing and Grubbing – Grading Area 2, 17.2 ACRE Clearing and Grubbing – Grading Area 3, 7.4 ACRE Clearing and Grubbing – Grading Area 4, 1.9 ACRE Clearing and Grubbing – Grading Area 5, 35.6 ACRE Clearing and Grubbing – Grading Area 6, 7.5 ACRE Access Road – New Road Construction, 1,826 L.F. Access Road – Install Two-Inch (2”) PennDOT 2A on all roads at end of project, 2,229 TON Subsurface Drain, 3,844 L.F. Dewatering Impoundments, 1 L.S. Grading – Grading Area 1, 1,133,874 C.Y. Grading – Grading Area 2, 114,232 C.Y. Grading – Grading Area 3, 33,166 C.Y. Grading – Grading Area 4, 8,618 C.Y. Grading – Grading Area 5, 490,907 C.Y. Grading – Grading Area 6, 68,351 C.Y. Permanent Channel Excavation, 360 C.Y. Rock Lining, 2,436 S.Y. Seeding – Seed Bed Preparation, 148.6 ACRE Seeding – Seed, 6,241 LB. Woodrat Mitigation Structures, 9 EACH MANDATORY Pre-Bid Conference will be held on: June 1, 2026, at 9:00 a.m. Department representatives will meet contractors at: 40°07'23.19"N 78°14'20.28"W FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
06/18/2026 06:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSM 10(2904)101.1
Abandoned Mine Reclamation Project Slippery Rock Creek Marion Township, Butler County Estimated Amount: $300,000-$500,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,014 L.F. Clearing and Grubbing, 1 L.S. Subsurface Drains with Cleanouts, 1,718 L.F. Grading, 127,498 C.Y.
06/13/2024 06:00 PM UTC
OSM 16(1957)101.1
Abandoned Mine Reclamation Project Mahles Run East Knox and Washington Townships, Clarion County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32"Diameter), 1,414 L.F. Sealing Collapsed Mine Entry, 1 EACH Subsurface Drain, 494 L.F. Grading – Grading, 35,543 C.Y. Seeding – Mulching, 6.8 ACRE
05/30/2024 06:00 PM UTC
OSM 10(6495)101.1
Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672 L.F. Clearing and Grubbing, 1 L.S. Subsurface Drains with Cleanouts, 1,750 L.F. Grading, 252,589 C.Y. Planting – Tree Seedlings, 9,318 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
05/09/2024 06:00 PM UTC
OSM 10(6493)102.1
Abandoned Mine Reclamation Project West Liberty East #3, Brady Township and West Liberty Borough, Butler County Estimated Amount: $300,000-$500,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32" Diameter), 1,530 L.F. Grading - Grading, 66,293 C.Y. Subsurface Drain, 386 L.F. Sealing Mine Openings - Sealing Mine Openings, 1 EACH
04/04/2024 06:00 PM UTC
OSM 33(4911)101.1
Abandoned Mine Reclamation Project South Timblin Porter Township, Jefferson County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction, Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter, Sock Eighteen-Inch (18”) Diameter, Stacked, 2,050 L.F. Grading, 35,500 C.Y. Seeding – Seed Bed Preparation, 5.0 Acres
03/14/2024 06:00 PM UTC
OSM 32(3591)101.1
Abandoned Mine Reclamation Project Johnsonburg #2 Banks Twp., Indiana County Estimated Amount: $200,000-$299,000 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 1,100 L.F. Grading – Grading, 18,700 C.Y. Subsurface Highwall Drain, 450 L.F. Planting – Tree Seedlings, 2,584 EACH
02/22/2024 07:00 PM UTC
EC-65-81369-23
Storage Tank Removal Pitzer Transport, Inc. City of Jeannette, Westmoreland County Estimated Amount: $0-$100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of one steel underground storage tank system. (1 10,000-gallon diesel underground storage tank) Tank is uncapped and has 25 5/8 inches of water and 3/8 inches of product at the last inspection. There is a need to pump the tanks of liquid and property dispose of liquid. A closure report is required as well as closure sampling.
02/22/2024 07:00 PM UTC
OSM 13,54(3204)101.1
Abandoned Mine Reclamation Project Honeybrook-Audenried Banks Township, Carbon County Kline Township, Schuylkill County Estimated Amount: $500,000-$1,000,000 Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Removal and Disposal of Structures Seedings READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 18%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/30/2023 07:00 PM UTC
OSM 65(1199)102.1
Abandoned Mine Reclamation Project Bovard Area Wide Subsidence Hempfield Township, Westmoreland County Estimated Amount: Greater Than $5,000,000 Term: 630 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 10,203 L.F. Four-Inch (4") Air Rotary Drilling, 33,942 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 32,224 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 5,045 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 29,522 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 57), 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 17,892 DRY TON Injection Site Preparation and Site Restoration, 497 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/30/2023 07:00 PM UTC
OSM 26(0690)101.1
Abandoned Mine Reclamation Project, Juniata West, Franklin Township, Fayette County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 2 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 1,800 L.F. Clearing and Grubbing, 1 L.S. Grading, 16,060 C.Y. Seeding – Seed Bed Preparation, 6.3 Acre
08/31/2023 06:00 PM UTC
61 - 70 of 204 Solicitations
1 2 3 4 5 7 9 10 11 20 21