OOGM 25-2
Cleaning Out and Plugging Eleven (11) Abandoned/Orphaned Wells
Howe Township, Forest County
Estimated Amount: $300,000-$500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug eleven (11) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: March 11, 2026, at 9:00 a.m.
Department representatives will meet contractors at: Parking Area across from Minister Creek Campground on Rt. 666 in Howe Township. 41.6206396, -79.1536190
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 04/09/2026 06:00 PM UTC |
|
OSM 17(3982)101.1 and OSM 17(3982)102.1
Abandoned Mine Reclamation Project
Parsonville Northwest and Parsonville Northwest 2
Decatur Township, Clearfield County
Estimated Amount: $300,000-$500,000
Term: 240 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 2,700 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Temporary Stream
Crossing, 1 L.S.
Clearing and Grubbing, 15.5 ACRE
Grading – Grading Area 1, 26,000 C.Y.
Grading – Grading Area 2, 57,000 C.Y.
Planting – Planting Preparation, 15.5 ACRE
| 04/09/2026 06:00 PM UTC |
|
OOGM FS25-3
Cleaning Out and Plugging Five (5) Orphan Gas Wells
Sandycreek Township, Venango County
Estimated Amount: $300,000-$500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug five (5) orphan gas wells, estimated to be 500-1250 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: April 1, 2026, at 10:00 a.m.
Department representatives will meet contractors at: Rails to Trails entrance off Belmar Road
41.333279, -79.774949
Belmar Road, Franklin, PA 16323
https://maps.app.goo.gl/wNpiW1xebcDNKF7r5
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/07/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 26(4713)102.1
Public Waterline Extension
Indian Head West Waterline
Saltlick and Springfield Townships, Fayette County
Estimated Amount: $500,000 to $1,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Installation of Eight-Inch (8”) PVC Pipe Including Fittings, 7,600 L.F.
Service Lateral Connections – Three-Quarter Inch (3/4”) Service, 24 EACH
Stream Crossings, 40 L.F.
| 03/13/2025 06:00 PM UTC |
|
OSM 26,65(2553,2758)101.1
Abandoned Mine Reclamation Project
Belle Vernon Region (Phase 1)
Rostraver Township, Westmoreland County
Washington Township, Fayette County
Estimated Amount: Greater Than $5,000,000
Term: 900 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Overburden Drilling and Casing, Steel or PVC, 32,278 L.F.
Four-Inch (4") Air Rotary Drilling, 22,226 L.F.
Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 44,425 L.F.
Supply and Delivery, Mixing and Injection of Grout Material - Cement, 8,672 TON
Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 37,487 DRY TON
Supply and Delivery, Mixing and Injection of Grout Material - Stone AASHTO No. 8 Coarse Aggregate, 20 TON
Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 46,348 DRY TON
Injection Site Preparation and Site Restoration, 844 EACH
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 03/13/2025 06:00 PM UTC |
|
OSM 56(2515)101.1
Abandoned Mine Reclamation Project
Reitz
Shade Township, Somerset County
Issue Date: January 17, 2025
Mandatory Pre-Bid Meeting: No
Bid Opening: February 20, 2025
Estimated Amount: $500,000 to $1,000,000
Term: 240 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Socks (32”
Diameter), 2,150 L.F.
Planting – Planting Preparation, 17 ACRE
Planting – Tree Seedlings, 9,200 EACH
| 02/20/2025 07:00 PM UTC |
|
OSM 16(1055)101.1
Abandoned Mine Reclamation Project
East Fryburg
Washington Township, Clarion County
Estimated Amount: $300,000-$500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,878 L.F.
Clearing and Grubbing, 16 ACRE
Grading - Grading, 70,000 C.Y.
Grading – Hummocky Piles, 5.5 ACRE
Grading – Ripping, 4.0 ACRE
Planting – Tree Seedlings, 6,464 EACH
| 02/13/2025 07:00 PM UTC |
|
OSM 26(3858)101.1
Abandoned Mine Reclamation Project
Bowood Northwest
Nicholson Township, Fayette County
Estimated Amount: $500,000 to $1,000,000
Term: 365 calendar days
Bid Bond Required
Mandatory Pre-Bid Meeting: No
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 1,669 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube, 241 L.F.
Clearing and Grubbing, 15.5 ACRE
Grading - Grading, 227,664 C.Y.
Grading – Hummocky Piles, 6.7 ACRE
Grading – Ripping, 2.3 ACRE
Planting – Tree Seedlings, 6,136 EACH
| 02/06/2025 07:00 PM UTC |
|
OSM 63(4744)101.1
Abandoned Mine Reclamation Project
Speers West
Fallowfield Township, Washington County
Estimated Amount: $300,000-$500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 730 L.F.
Clearing and Grubbing, 20 ACRE
Grading, 156,590 C.Y.
Planting – Tree Seedlings, 1,054 EACH
Access Road – 1 EACH
Gas Line Crossings – 1 L.S.
| 01/09/2025 07:00 PM UTC |
|
OSM 16(0030)101.1
Abandoned Mine Reclamation Project
Sarah Furnace
Madison Township, Clarion County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 210 calendar days
Bid Bond Required
Mandatory Pre-Bid Meeting: No
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 900 L.F.
Clearing and Grubbing, 2.8 ACRE
Grading, 16,150 C.Y.
Planting, Tree Seedlings, 480 EACH
| 11/07/2024 07:00 PM UTC |
|
OSM 19(2000)104.1
Abandoned Mine Reclamation Project
314 East Park Street Demolition
Conyngham Township, Columbia County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 30 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of E&S Controls – Filter Sock (8” Diameter), 375 L.F.
Grading, 100 C.Y.
| 11/07/2024 07:00 PM UTC |
|
OSM 03(3368)101.1
Abandoned Mine Reclamation Project
Belnap South
Brady Township
Armstrong County
Estimated Amount: $300,000-$500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 3,144 L.F.
Clearing and Grubbing, 18.8 ACRE
Grading, 179,958 C.Y.
Mushroom Compost, 1,880 C.Y.
| 10/31/2024 06:00 PM UTC |
|
OSM 02(1726)102.1
Abandoned Mine Reclamation Project
Graham Boulevard
Municipality of Penn Hills, Allegheny County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 1,173 C.Y
Precast Inlet Box, 1 EACH
Repaving - PA DOT 2A Stone, 1.39 C.Y.
Repaving - Twenty-five-millimeter (25 mm) Superpave Base Course, 1.225 TON
Repaving - Nineteen-millimeter (19 mm) Superpave Binder Course, 0.6125 TON
Repaving - Nine and one-half millimeter (9.5 mm) Superpave Wearing Course, 4.36 S.Y.
Traffic Control, 1 L.S.
Subsurface Drain - Eight-Inch (8”) Nominal Diameter
Subsurface Drain - Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 151 L.F.
Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 1,173 C.Y.
Seeding – Seeding, 1 L.S.
Seeding – Topsoil, 1 TON
| 10/17/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.