Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSM 63(0962)102.1
Abandoned Mine Reclamation Project
Muse Coal Refuse Pile
Cecil Township, Washington County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 1,600 L.F.
Clearing and Grubbing, 10.8 ACRE
Grading, 54,000 C.Y.
Planting – Planting Preparation, 11.8 ACRE
Subsurface Drains, 900 L.F.
Grass Lined Ditches, 1,000 L.F.
Culvert – Culvert C-1, 60 L.F.
Culvert – Headwall, 1 EACH
Demolition and Disposal of Mine Facilities, 5 EACH
Gate, 1 EACH
Alkaline Addition, 3,500 TON
MANDATORY Pre-Bid Training will be held on: August 19, 2025 at 2:00 p.m. FAILURE TO ATTEND THE PRE-BID TRAINING WILL BE CAUSE FOR REJECTION OF THE BID.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 09/04/2025 06:00 PM UTC |
OSM 11(2713)102.1
Abandoned Mine Reclamation Project
Ingleside Northeast
Richland Township, Cambria County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 7,800 L.F.
Clearing and Grubbing, 44 ACRE
Grading – Grading Area 1A, 54,000 C.Y.
Grading – Grading Area 1B, 56,658 C.Y.
Grading – Grading Area 2, 53,867 C.Y.
Grading – Grading Area 3, 304,510 C.Y.
Planting – Planting Preparation, 44 ACRE
Planting – Tree Seedlings, 27,880 EACH
Subsurface Drain, 930 L.F.
Rock Lined Channel, 506.1 S.Y.
Grass Lined Channel, 373.3 C.Y.
Type 2 Right-of-Way Fence, 1,350 L.F.
| 09/11/2025 06:00 PM UTC |
Number | Deadline |
---|---|
BF63080601.1
Bond Forfeiture Land Reclamation, Green Global Machine 221 LNC Land Reclamation Project, Buffalo Township, Washington County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 180 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization/Demobilization of Necessary Reclamation Equipment
Backfilling Highwall or Blasting Highwall (Approx. 60,000 CY)
Topsoil Spreading – Approximately 15,000 CY
Regrading/Revegetation – 5 Acres
Remove One Pond
Place Gravel Over Pond Removal Area – Approx. 25 TON
Regrade/Spread Topsoil and Revegetate Approximately 5 Acres According to the Approved Reclamation Plan
Repair All Erosion Gullies
Remove Any Assorted Trash, Abandoned Equipment and Parts Left Behind by Green Global Machine
| 06/22/2023 06:00 PM UTC |
EC-04-80073-23
Storage Tank Removal, Jim's Sunoco Service Inc., New Brighton Borough, Beaver County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Certified Asbestos Inspector Evaluation 1 L.S.
10 Day Notification to DEP AQ Program SWRO 1 L.S.
Demolition of Building and Canopy in North Tank Field 2 L.S.
Licensed Asbestos Abatement Contractor, If Necessary, For Removal 1 L.S.
Excavation, Removal, and Disposal of Underground Storage Tank Systems
A. Excavation 5 L.S.
B. 5 Underground Storage Tanks (5 Storage Tanks 001, 002, 007, 008, 009), Cleaning, Removal and Disposal and/or Salvage of Underground Tank and Appurtenances 5 L.S.
Removal and Disposal of Residual Liquids from Underground Storage Tank Systems 5 Drums
Site Access and Restriction 1 L.S.
Backfill 256 Tons
Project Completion Report 1 L.S.
| 06/01/2023 06:00 PM UTC |
EC-10-91063-23
Storage Tank Removal, McCandless Tank Removal, Worth Township, Butler County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 180 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Excavation, Removal, and Disposal of Underground Storage Tank Systems
A. Excavation 4 L.S.
B. 4 Underground Storage Tanks, Cleaning, Removal and Disposal and/or Salvage of Underground Tank and Appurtenances 4 L.S.
Removal and Disposal of Residual Liquids from Underground Storage Tank Systems 4 Drums
Site Access and Restriction 1 L.S.
Backfill 155 Tons
Underground Storage Tank System Closure Report 1 L.S.
Closure Notification Form 1 L.S.
Storage Tanks Permitting/Application Registration Form 1 L.S.
MANDATORY Pre-Bid Conference will be held on: May 3, 2023, at 10:00 a.m.
Department representatives will meet contractors at: 895 New Castle Road, Slippery Rock, PA 16057
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/25/2023 06:00 PM UTC |
OSM 17(6868)101.1
Abandoned Mine Reclamation Project, Smoke Run East, Gulich Township and Ramey Borough, Clearfield County
Estimated Amount: $500,000 to $1,000,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter
Sock, 3,300 L.F.
Access Road – AASHTO No. 1 Coarse Aggregate, 2,600 C.Y.
Access Road – PA DOT 2A Coarse Aggregate, 1,300 C.Y.
Grading, 98,950 C.Y.
Smooth-Interior Corrugated Polyethylene Pipe – Thirty-six Inch (36”) Diameter, 220 L.F.
Walking Trail, 1,330 S.Y.
Tree Planting, 110 Each,
Subsurface Drain – Twelve-Inch (12”) Perforated Smooth-Interior Corrugated
Polyethylene Pipe, 2,010 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 655 C.Y.
| 03/02/2023 07:00 PM UTC |
OOGM FS22-20
Cleaning Out and Plugging Nineteen (19) Orphan Gas Wells, Farmington and Highland Townships, Clarion County and Green and Barnett Townships, Forest County
Estimated Amount: $1,000,000-$5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Nineteen (19) orphan gas wells, estimated to be 660 to 3,300 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 7, 2023 at 9:00 a.m.
Department representatives will meet contractors at: Farmington Township Volunteer Fire Co. Parking Lot. 6785 Route 36, Leeper, PA
16233. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/23/2023 07:00 PM UTC |
OOGM FS22-21
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells, Farmington, Knox, and Washington Townships and Hawthorn Borough, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 420 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty Three (23) orphan gas wells, estimated to be 660 to 3,300 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 1, 2023, at 9:00 a.m.
Department representatives will meet contractors at: Washington Township Volunteer Fire Hall Parking Lot, 19877 PA-208, Fryburg, PA
16326. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/14/2023 07:00 PM UTC |
OOGM FS22-22
Cleaning Out and Plugging Twenty (20) Orphan Gas Wells, Beaver, Richland, and Licking Townships, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 420 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty (20) orphan gas wells, estimated to be 1,000 to 2,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 2, 2023, at 9:00 a.m.
Department representatives will meet contractors at: Large Parking Lot Off Knox Exit South of I 80 East. Lat N 41 11’00” Long W-79 32’28”. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/14/2023 07:00 PM UTC |
OSM 65(1233)101.1
Abandoned Mine Reclamation Project, Delmont Mine, Hempfield Township, Westmoreland County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1
L.S.
Clearing and Grubbing, 1 L.S.
Selective Grading, 1 L.S.
AASHTO No. 57 Aggregate, 50 ton
Seeding, 4,500 S.Y.
| 02/09/2023 07:00 PM UTC |
OOGM FS22-14
Cleaning Out and Plugging Nineteen (19) Orphan Gas Wells, Cornplanter Township, Venango County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug nineteen (19) orphan gas wells, estimated to be 500 to 985 and potentially 4,330 to 5,400 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: January 24th at 9:00 a.m.
Department representatives will meet contractors at: Oil Creek Park Train Station. Lat N 41 28’59” Long W -79 41’31”
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/07/2023 07:00 PM UTC |
OOGM FS22-15
Cleaning Out and Plugging Nineteen (19) Orphan Gas Wells, Sugarcreek Borough and Cranberry Township, Venango County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug nineteen (19) orphan gas wells, estimated to be 700 to 985 and 4,330 to 5,400 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: January 25th at 9:00 a.m.
Rte. 322 west of Franklin Pa ½ mile. Large parking lot on west side of road by 121-29780. Lat N41 24’24” Long W-79 51’19”.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/07/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.