OSM 61(0807,6967)101.1
Abandoned Mine Reclamation Project
Smith Corners
Clinton Township, Venango County
Estimated Amount: $500,000 to $1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 3 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 4,650 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,145 L.F.
Clearing and Grubbing, 23.1 ACRE
Grading – Grading Area 1, 24,450 C.Y.
Grading – Grading Area 2, 141,209 C.Y.
Grading – Grading Area 3, 13,626 C.Y.
Grading – Ripping, 15.2 ACRE
Planting – Planting Preparation, 23.1 ACRE
Planting – Tree Seedlings, 10,345 EACH
Planting – Grass Seed, 240 LB.
Subsurface Drain, 1,990 L.F.
Permanent Channel Excavation, 208 C.Y.
Erosion Matting, 767 S.Y.
Selective Grading, 200 ACRE
Implementation of the Traffic Control Plan, 1 L.S.
| 06/04/2026 06:00 PM UTC |
|
OSM 17(6425)101.1
Abandoned Mine Reclamation Project
Keewaydin
Covington and Karthaus Townships, Clearfield County
Estimated Amount: $1,000,000-$5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (24” Diameter), 2,580 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 4,370 L.F.
Clearing and Grubbing, 20 ACRE
Demolition, Removal and Disposal of Buildings and Equipment, 1 L.S.
Dewatering and Diversion and Care of Water, 1 L.S.
Stream Crossings - Stream Crossing 1 - Rock Ford, 200 TON
Stream Crossings - Stream Crossing 2 - 60" RCEP, 50 L.F.
Stream Crossings - Stream Crossing 2 - R-6 Rock, 50 S.Y.
Stream Crossings - Stream Crossing 2 - 2A Aggregate, 90 C.Y.
Stream Crossings - Stream Crossing 3 - 72" RCEP, 150 L.F.
Stream Crossings - Stream Crossing 3 - R-6 Rock, 180 S.Y.
Stream Crossings - Stream Crossing 3 - 2A Aggregate, 230 C.Y.
Special Handling of Refuse Material - Baghouse Lime, 2,700 TON
Special Handling of Refuse Material - Placement of Refuse Mixture, 42,420 C.Y.
Grading – Grading, 70,000 C.Y.
Grading – Ripping, 10 ACRE
Selective Grading, 10 ACRE
Access Road, 2,600 L.F.
Planting/Seeding - Planting Preparation, 20 ACRE
Planting/Seeding - Tree Seedlings, 6,800 EACH
| 06/04/2026 06:00 PM UTC |
|
OOGM FS26-3
Cleaning Out and Plugging One (1) Abandoned Gas Well
Moon Township, Allegheny County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug one (1) abandoned gas well, estimated to be approximately 2000’ feet in depth, to Department specifications.
Prepare and restore well site
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: May 13, 2026, at 10:00 a.m.
Department representatives will meet contractors at:
Robert Morris University
Parking Area on Colonial Way (Next to Baseball Field)
40.523194, -80.210583
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 06/18/2026 06:00 PM UTC |
|
OSM 05(2002,7054)101.1
Abandoned Mine Reclamation Project
Kimber Mountain NW
Broad Top Township, Bedford County
Estimated Amount: Greater than $5,000,000
Term: 730 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 4 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 17,674 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Riprap Apron, 89 S.Y.
Clearing and Grubbing – Grading Area 1, 79.0 ACRE
Clearing and Grubbing – Grading Area 2, 17.2 ACRE
Clearing and Grubbing – Grading Area 3, 7.4 ACRE
Clearing and Grubbing – Grading Area 4, 1.9 ACRE
Clearing and Grubbing – Grading Area 5, 35.6 ACRE
Clearing and Grubbing – Grading Area 6, 7.5 ACRE
Access Road – New Road Construction, 1,826 L.F.
Access Road – Install Two-Inch (2”) PennDOT 2A on all roads at end of project, 2,229 TON
Subsurface Drain, 3,844 L.F.
Dewatering Impoundments, 1 L.S.
Grading – Grading Area 1, 1,133,874 C.Y.
Grading – Grading Area 2, 114,232 C.Y.
Grading – Grading Area 3, 33,166 C.Y.
Grading – Grading Area 4, 8,618 C.Y.
Grading – Grading Area 5, 490,907 C.Y.
Grading – Grading Area 6, 68,351 C.Y.
Permanent Channel Excavation, 360 C.Y.
Rock Lining, 2,436 S.Y.
Seeding – Seed Bed Preparation, 148.6 ACRE
Seeding – Seed, 6,241 LB.
Woodrat Mitigation Structures, 9 EACH
MANDATORY Pre-Bid Conference will be held on: June 1, 2026, at 9:00 a.m.
Department representatives will meet contractors at: 40°07'23.19"N 78°14'20.28"W
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 06/18/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 03(6079)101.1
Abandoned Mine Reclamation Project, Greendale North, Valley Township, Armstrong County,
Estimated Amount: $200,000 to $299,999 (Small Business Only), Term: 210 Calendar Days, Principal Items of Work & Approx Quantities: Peoples Natural Gas Representative Time During Gas Line Crossing Work, 1 Invoice; Subsurface Drain with Cleanout, 175 L.F.; Grading, 132,500 C.Y.; Seeding, 11.5 Acres.
| 08/01/2017 06:00 PM UTC |
|
EC177082717
Environmental Cleanup and Brownfields Project, Removal and Disposal of (4) Underground Storage Tank Systems, Ma and Pa's Old Country Store and Restaurant, Burnside Borough, Clearfield County.
Principal Items of Work and Approximate Quantities:
DEP-certified “UMR” - Underground storage tank-removal, under Chapter 245.110(b)(2), oversight JOB;
Excavation and removal of 4 underground storage tanks systems LS; Removal and Disposal of residual liquids 17 drums; Disposal of 4 steel underground storage tanks and associated fiberglass piping; 18 soil samples. If groundwater is present, 13 soil samples and three groundwater samples; Backfill 110 tons; Project Completion Report. Contract estimate $15,000 to $25,000. Term: 30 calendar days.
MANDATORY PRE-BID SITE INSPECTION: JUNE 15, 2017 AT 10:00am, 7494 MAIN STREET, BURNSIDE PA 15721.
| 07/06/2017 06:00 PM UTC |
|
AMD 18(0817)103.1
Acid Mine Drainage Abatement Project,
Fran Contracting Camp Run No. 2,
East Keating Township, Clinton County.
The principal items of work and approximate quantities include: Excavation and Rebackfilling 1,355,097 C.Y.,
Alkaline Addition (Limestone Screenings) 161,200 TON,
Seed Bed Preparation and Seeding 51.5 ACRE,
Tree Planting – Seedlings 30,000 TREE ,
Rock Underdrains 1,720 L.F.,
Permanent Access Roads 8,667 S.Y. Contract estimate greater than $5,000,000. Term: 545 calendar days. ADDENDUM NO. 1 REQUIRED
| 06/06/2017 06:00 PM UTC |
|
OSM 17(1083)102.1
Abandoned Mine Reclamation Project,
South Grassflat,
Cooper Township, Clearfield County,
Principle Items of Work and Approximate Quantities:
Clearing and Grubbing JOB
Grading 265,620 C.Y.
Ditch Excavation 4,800 C.Y.
Rolled Erosion Control Products 2,735 S.Y.
Rock Lining 2,490 S.Y.
Alkaline Addition 7,338 TON
Subsurface Drain 875 L.F.
Gate 2 EACH
Access Roadway Surface Material 3,125 S.Y.
Seeding 29.5 ACRE
| 05/18/2017 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.