Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells
Lancaster, Forward, and Connoquenessing Townships, Butler County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m.
Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 10/30/2025 06:00 PM UTC |
|
OSM 17(7183)101.1
Abandoned Mine Reclamation Project
Goshen West
Goshen Township, Clearfield County
Estimated Amount: $500,000-$1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F.
Clearing and Grubbing, 27.8 Acre
Grading - Grading, 216,478 C.Y.
Grading – Hummocky Piles, 14.3 Acre
Grading – Ripping, 13.5 Acre
Planting – Planting Preparation, 27.8 Acre
Planting – Tree Seedlings, 18.904 Each
| 11/06/2025 07:00 PM UTC |
|
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells
Highland Township, Elk County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m.
Department representatives will meet contractors at:
Lamont Tool Shop
Warehouse Rd (FR 337)
41.5347, -78.9143
To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/06/2025 07:00 PM UTC |
|
OSM 17(4543)101.1
Abandoned Mine Reclamation Project
Alder Run
Morris Township, Clearfield County
Estimated Amount: $300,000-$500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F.
Clearing and Grubbing, 21.7 ACRE
Grading - Grading, 149,622 C.Y.
Grading - Ripping, 0.6 ACRE
Planting - Planting Preparation, 21.7 ACRE
Planting - Tree Seedlings, 408 EACH
Dewatering Impoundments, 1 L.S.
Sediment Basin and Vernal Pool Construction, 1 L.S.
| 11/06/2025 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 26(4713)102.1
Public Waterline Extension
Indian Head West Waterline
Saltlick and Springfield Townships, Fayette County
Estimated Amount: $500,000 to $1,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Installation of Eight-Inch (8”) PVC Pipe Including Fittings, 7,600 L.F.
Service Lateral Connections – Three-Quarter Inch (3/4”) Service, 24 EACH
Stream Crossings, 40 L.F.
| 03/13/2025 06:00 PM UTC |
|
OSM 26,65(2553,2758)101.1
Abandoned Mine Reclamation Project
Belle Vernon Region (Phase 1)
Rostraver Township, Westmoreland County
Washington Township, Fayette County
Estimated Amount: Greater Than $5,000,000
Term: 900 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Overburden Drilling and Casing, Steel or PVC, 32,278 L.F.
Four-Inch (4") Air Rotary Drilling, 22,226 L.F.
Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 44,425 L.F.
Supply and Delivery, Mixing and Injection of Grout Material - Cement, 8,672 TON
Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 37,487 DRY TON
Supply and Delivery, Mixing and Injection of Grout Material - Stone AASHTO No. 8 Coarse Aggregate, 20 TON
Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 46,348 DRY TON
Injection Site Preparation and Site Restoration, 844 EACH
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 03/13/2025 06:00 PM UTC |
|
OSM 56(2515)101.1
Abandoned Mine Reclamation Project
Reitz
Shade Township, Somerset County
Issue Date: January 17, 2025
Mandatory Pre-Bid Meeting: No
Bid Opening: February 20, 2025
Estimated Amount: $500,000 to $1,000,000
Term: 240 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Socks (32”
Diameter), 2,150 L.F.
Planting – Planting Preparation, 17 ACRE
Planting – Tree Seedlings, 9,200 EACH
| 02/20/2025 07:00 PM UTC |
|
OSM 16(1055)101.1
Abandoned Mine Reclamation Project
East Fryburg
Washington Township, Clarion County
Estimated Amount: $300,000-$500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,878 L.F.
Clearing and Grubbing, 16 ACRE
Grading - Grading, 70,000 C.Y.
Grading – Hummocky Piles, 5.5 ACRE
Grading – Ripping, 4.0 ACRE
Planting – Tree Seedlings, 6,464 EACH
| 02/13/2025 07:00 PM UTC |
|
OSM 26(3858)101.1
Abandoned Mine Reclamation Project
Bowood Northwest
Nicholson Township, Fayette County
Estimated Amount: $500,000 to $1,000,000
Term: 365 calendar days
Bid Bond Required
Mandatory Pre-Bid Meeting: No
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 1,669 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube, 241 L.F.
Clearing and Grubbing, 15.5 ACRE
Grading - Grading, 227,664 C.Y.
Grading – Hummocky Piles, 6.7 ACRE
Grading – Ripping, 2.3 ACRE
Planting – Tree Seedlings, 6,136 EACH
| 02/06/2025 07:00 PM UTC |
|
OSM 63(4744)101.1
Abandoned Mine Reclamation Project
Speers West
Fallowfield Township, Washington County
Estimated Amount: $300,000-$500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 730 L.F.
Clearing and Grubbing, 20 ACRE
Grading, 156,590 C.Y.
Planting – Tree Seedlings, 1,054 EACH
Access Road – 1 EACH
Gas Line Crossings – 1 L.S.
| 01/09/2025 07:00 PM UTC |
|
OSM 16(0030)101.1
Abandoned Mine Reclamation Project
Sarah Furnace
Madison Township, Clarion County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 210 calendar days
Bid Bond Required
Mandatory Pre-Bid Meeting: No
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 900 L.F.
Clearing and Grubbing, 2.8 ACRE
Grading, 16,150 C.Y.
Planting, Tree Seedlings, 480 EACH
| 11/07/2024 07:00 PM UTC |
|
OSM 19(2000)104.1
Abandoned Mine Reclamation Project
314 East Park Street Demolition
Conyngham Township, Columbia County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 30 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of E&S Controls – Filter Sock (8” Diameter), 375 L.F.
Grading, 100 C.Y.
| 11/07/2024 07:00 PM UTC |
|
OSM 03(3368)101.1
Abandoned Mine Reclamation Project
Belnap South
Brady Township
Armstrong County
Estimated Amount: $300,000-$500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 3,144 L.F.
Clearing and Grubbing, 18.8 ACRE
Grading, 179,958 C.Y.
Mushroom Compost, 1,880 C.Y.
| 10/31/2024 06:00 PM UTC |
|
OSM 02(1726)102.1
Abandoned Mine Reclamation Project
Graham Boulevard
Municipality of Penn Hills, Allegheny County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 1,173 C.Y
Precast Inlet Box, 1 EACH
Repaving - PA DOT 2A Stone, 1.39 C.Y.
Repaving - Twenty-five-millimeter (25 mm) Superpave Base Course, 1.225 TON
Repaving - Nineteen-millimeter (19 mm) Superpave Binder Course, 0.6125 TON
Repaving - Nine and one-half millimeter (9.5 mm) Superpave Wearing Course, 4.36 S.Y.
Traffic Control, 1 L.S.
Subsurface Drain - Eight-Inch (8”) Nominal Diameter
Subsurface Drain - Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 151 L.F.
Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 1,173 C.Y.
Seeding – Seeding, 1 L.S.
Seeding – Topsoil, 1 TON
| 10/17/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.