General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM FS25-6
Cleaning Out and Plugging Six (6) Orphan Gas Wells Center Township, Butler County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug six (6) orphan gas wells, estimated to be 1700 to 2200 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: February 4, 2026, at 10:00 a.m. Department representatives will meet contractors at: Adelman Fields 299 Old Plank Road Butler, PA Meet in parking lot of baseball field. 40.824529, -79.909805 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
02/26/2026 07:00 PM UTC
OOGM FS25-4
Cleaning Out and Plugging Three (3) Orphan Gas Wells Allegheny Township, Westmoreland County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug three (3) orphan gas wells, estimated to be 3500-4000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: February 18, 2026, at 10:00 a.m. Department representatives will meet contractors at: Baseball Field #4, 236 Air Shaft Road, Apollo, PA 15613, 40.580182, -79.620358. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
03/26/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSM 32(4601)101.1
Abandoned Mine Reclamation Project Middle Dixon Creek East Mahoning Township, Indiana County Estimated Amount: $300,000-$500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 2,186 L.F. Clearing and Grubbing, 18.1 Acre Grading - Grading, 179,064 C.Y. Grading – Ripping, 3.2 Acre Planting – Planting Preparation, 18.1 Acre Permanent Channel Excavation, 26 C.Y. Access Road, 1,145 L.F.
10/09/2025 06:00 PM UTC
OOGM FS24-3
Cleaning Out and Plugging Seven (7) Orphan Gas Wells Smith, North Strabane, North Franklin, and Canton Townships, Washington County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug seven (7) orphan gas wells, estimated to be 1,000 to 3,400 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: August 27, 2025, at 10:00 a.m. Department representatives will meet contractors at: 40.1584, -80.2789 (Parking Lot) Washington Crown Center 1500 West Chestnut Street Washington, PA 15301 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
09/18/2025 06:00 PM UTC
OSM 11(2713)102.1
Abandoned Mine Reclamation Project Ingleside Northeast Richland Township, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 7,800 L.F. Clearing and Grubbing, 44 ACRE Grading – Grading Area 1A, 54,000 C.Y. Grading – Grading Area 1B, 56,658 C.Y. Grading – Grading Area 2, 53,867 C.Y. Grading – Grading Area 3, 304,510 C.Y. Planting – Planting Preparation, 44 ACRE Planting – Tree Seedlings, 27,880 EACH Subsurface Drain, 930 L.F. Rock Lined Channel, 506.1 S.Y. Grass Lined Channel, 373.3 C.Y. Type 2 Right-of-Way Fence, 1,350 L.F.
09/11/2025 06:00 PM UTC
OSM 63(0962)102.1
Abandoned Mine Reclamation Project Muse Coal Refuse Pile Cecil Township, Washington County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 1,600 L.F. Clearing and Grubbing, 10.8 ACRE Grading, 54,000 C.Y. Planting – Planting Preparation, 11.8 ACRE Subsurface Drains, 900 L.F. Grass Lined Ditches, 1,000 L.F. Culvert – Culvert C-1, 60 L.F. Culvert – Headwall, 1 EACH Demolition and Disposal of Mine Facilities, 5 EACH Gate, 1 EACH Alkaline Addition, 3,500 TON MANDATORY Pre-Bid Training will be held on: August 19, 2025 at 2:00 p.m. FAILURE TO ATTEND THE PRE-BID TRAINING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
09/04/2025 06:00 PM UTC
OOGM FS24-5
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells East Keating Township, Clinton County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug fifteen (15) orphan gas wells, estimated to be 825 to 4,200 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 26, 2025, at 10:00 a.m. Department representatives will meet contractors at: 41.261528, -77.913032. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
07/17/2025 06:00 PM UTC
OSM 40(1381)103.1
Abandoned Mine Reclamation Project Freeland South Hazle Township, Luzerne County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Demolition of Structures Grading -15,435 C.Y. Sealing Boreholes– 3 Seeding – 3.3 Acres
07/03/2025 06:00 PM UTC
OSM 11(0826)104.1
Abandoned Mine Reclamation Project Spangler Athletic Field Northern Cambria Borough, Cambria County Mandatory Pre-Bid Meeting: No Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter), 300 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Inlet Filter Bag, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Pumped Water Filter Bag, 5 EACH Clearing and Grubbing, 1 L.S. Diversion and Care of Water, 1 L.S. Road and Sidewalk Replacement – Roadway Restoration, 5 S.Y. Road and Sidewalk Replacement – Temporary Paving, 11 S.Y. Road and Sidewalk Replacement – Concrete Sidewalk Restoration, 5 S.Y. Road and Sidewalk Replacement – Gravel Driveway/Sidewalk Restoration, 10 S.Y. Traffic Control, 1 L.S. Subsurface Drain – Twelve-Inch (12”) Polyvinyl Chloride (PVC) Pipe, 360 L.F. Subsurface Drain – Cleanouts, 3 EACH Subsurface Drain – Connection to Mine Drift, 1 L.S. Subsurface Drain – Connection to Existing Storm Inlet, 1 L.S. Subsurface Drain – Reconnection of Existing Mine Drain to New Drain, 1 L.S. Subsurface Drain – Reconnection of Existing Homeowner Drain, 2 EACH Seeding – Seeding, 1 L.S. Seeding – Additional Topsoil, 10 TON
07/03/2025 06:00 PM UTC
OSM 17(7158)103.1
Abandoned Mine Reclamation Project Shawville North Goshen Township, Clearfield County Mandatory Pre-Bid Meeting: No Estimated Amount: $1,000,000 to $5,000,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 3,000 L.F. Clearing and Grubbing, 1 L.S. Selective Grading, 2,100 S.Y. Seeding – Seed Bed Preparation,10 ACRE
06/26/2025 06:00 PM UTC
EC-10-90338-25
Storage Tank Removal Project GEHMS Vittle Village Clearfield Township, Butler County Estimated Amount: $0-$100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of Three (3) Fiberglass Underground Storage Tank System(s) Remove Remaining Product/Infiltrated Water from Each Tank (Estimated 300 Gallons Total) Closure Report and Closure Sampling MANDATORY Pre-Bid Conference will be held on: May 14, 2025 at 9:00 a.m. Department representatives will meet contractors at: 801 Clearfield Road, Fenelton, PA 16034. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
06/05/2025 06:00 PM UTC
OSM 03(4902)102.1
Abandoned Mine Reclamation Project Forks Church North Gilpin Township, Armstrong County Mandatory Pre-Bid Meeting: No Estimated Amount: $200,000.00 to $299,000.00 (Small Business Only) Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,110 L.F. Clearing and Grubbing, 10 ACRE Grading, 44,960 C.Y. Planting – Planting Preparation, 10 ACRE Demolition, Removal and Disposal of Mine Facilities, 1 L.S. Demolition and Disposal of Coke Ovens, 1 L.S.
06/05/2025 06:00 PM UTC
21 - 30 of 195 Solicitations
1 3 5 6 7 8 9 19 20