General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells Lancaster, Forward, and Connoquenessing Townships, Butler County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m. Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
10/30/2025 06:00 PM UTC
OSM 17(7183)101.1
Abandoned Mine Reclamation Project Goshen West Goshen Township, Clearfield County Estimated Amount: $500,000-$1,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F. Clearing and Grubbing, 27.8 Acre Grading - Grading, 216,478 C.Y. Grading – Hummocky Piles, 14.3 Acre Grading – Ripping, 13.5 Acre Planting – Planting Preparation, 27.8 Acre Planting – Tree Seedlings, 18.904 Each
11/06/2025 07:00 PM UTC
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells Highland Township, Elk County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m. Department representatives will meet contractors at: Lamont Tool Shop Warehouse Rd (FR 337) 41.5347, -78.9143 To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/06/2025 07:00 PM UTC
OSM 17(4543)101.1
Abandoned Mine Reclamation Project Alder Run Morris Township, Clearfield County Estimated Amount: $300,000-$500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F. Clearing and Grubbing, 21.7 ACRE Grading - Grading, 149,622 C.Y. Grading - Ripping, 0.6 ACRE Planting - Planting Preparation, 21.7 ACRE Planting - Tree Seedlings, 408 EACH Dewatering Impoundments, 1 L.S. Sediment Basin and Vernal Pool Construction, 1 L.S.
11/06/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSM 26(4713)102.1
Public Waterline Extension Indian Head West Waterline Saltlick and Springfield Townships, Fayette County Estimated Amount: $500,000 to $1,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Installation of Eight-Inch (8”) PVC Pipe Including Fittings, 7,600 L.F. Service Lateral Connections – Three-Quarter Inch (3/4”) Service, 24 EACH Stream Crossings, 40 L.F.
03/13/2025 06:00 PM UTC
OSM 26,65(2553,2758)101.1
Abandoned Mine Reclamation Project Belle Vernon Region (Phase 1) Rostraver Township, Westmoreland County Washington Township, Fayette County Estimated Amount: Greater Than $5,000,000 Term: 900 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 32,278 L.F. Four-Inch (4") Air Rotary Drilling, 22,226 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 44,425 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 8,672 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 37,487 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone AASHTO No. 8 Coarse Aggregate, 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 46,348 DRY TON Injection Site Preparation and Site Restoration, 844 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
03/13/2025 06:00 PM UTC
OSM 56(2515)101.1
Abandoned Mine Reclamation Project Reitz Shade Township, Somerset County Issue Date: January 17, 2025 Mandatory Pre-Bid Meeting: No Bid Opening: February 20, 2025 Estimated Amount: $500,000 to $1,000,000 Term: 240 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Socks (32” Diameter), 2,150 L.F. Planting – Planting Preparation, 17 ACRE Planting – Tree Seedlings, 9,200 EACH
02/20/2025 07:00 PM UTC
OSM 16(1055)101.1
Abandoned Mine Reclamation Project East Fryburg Washington Township, Clarion County Estimated Amount: $300,000-$500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,878 L.F. Clearing and Grubbing, 16 ACRE Grading - Grading, 70,000 C.Y. Grading – Hummocky Piles, 5.5 ACRE Grading – Ripping, 4.0 ACRE Planting – Tree Seedlings, 6,464 EACH
02/13/2025 07:00 PM UTC
OSM 26(3858)101.1
Abandoned Mine Reclamation Project Bowood Northwest Nicholson Township, Fayette County Estimated Amount: $500,000 to $1,000,000 Term: 365 calendar days Bid Bond Required Mandatory Pre-Bid Meeting: No Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 1,669 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube, 241 L.F. Clearing and Grubbing, 15.5 ACRE Grading - Grading, 227,664 C.Y. Grading – Hummocky Piles, 6.7 ACRE Grading – Ripping, 2.3 ACRE Planting – Tree Seedlings, 6,136 EACH
02/06/2025 07:00 PM UTC
OSM 63(4744)101.1
Abandoned Mine Reclamation Project Speers West Fallowfield Township, Washington County Estimated Amount: $300,000-$500,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 730 L.F. Clearing and Grubbing, 20 ACRE Grading, 156,590 C.Y. Planting – Tree Seedlings, 1,054 EACH Access Road – 1 EACH Gas Line Crossings – 1 L.S.
01/09/2025 07:00 PM UTC
OSM 16(0030)101.1
Abandoned Mine Reclamation Project Sarah Furnace Madison Township, Clarion County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 210 calendar days Bid Bond Required Mandatory Pre-Bid Meeting: No Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 900 L.F. Clearing and Grubbing, 2.8 ACRE Grading, 16,150 C.Y. Planting, Tree Seedlings, 480 EACH
11/07/2024 07:00 PM UTC
OSM 19(2000)104.1
Abandoned Mine Reclamation Project 314 East Park Street Demolition Conyngham Township, Columbia County Estimated Amount: $0-$100,000 (Small Business Only) Term: 30 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of E&S Controls – Filter Sock (8” Diameter), 375 L.F. Grading, 100 C.Y.
11/07/2024 07:00 PM UTC
OSM 03(3368)101.1
Abandoned Mine Reclamation Project Belnap South Brady Township Armstrong County Estimated Amount: $300,000-$500,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 3,144 L.F. Clearing and Grubbing, 18.8 ACRE Grading, 179,958 C.Y. Mushroom Compost, 1,880 C.Y.
10/31/2024 06:00 PM UTC
OSM 02(1726)102.1
Abandoned Mine Reclamation Project Graham Boulevard Municipality of Penn Hills, Allegheny County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 1,173 C.Y Precast Inlet Box, 1 EACH Repaving - PA DOT 2A Stone, 1.39 C.Y. Repaving - Twenty-five-millimeter (25 mm) Superpave Base Course, 1.225 TON Repaving - Nineteen-millimeter (19 mm) Superpave Binder Course, 0.6125 TON Repaving - Nine and one-half millimeter (9.5 mm) Superpave Wearing Course, 4.36 S.Y. Traffic Control, 1 L.S. Subsurface Drain - Eight-Inch (8”) Nominal Diameter Subsurface Drain - Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 151 L.F. Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 1,173 C.Y. Seeding – Seeding, 1 L.S. Seeding – Topsoil, 1 TON
10/17/2024 06:00 PM UTC
21 - 30 of 178 Solicitations