Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSM 17(7158)103.1
Abandoned Mine Reclamation Project
Shawville North
Goshen Township, Clearfield County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $1,000,000 to $5,000,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 3,000 L.F.
Clearing and Grubbing, 1 L.S.
Selective Grading, 2,100 S.Y.
Seeding – Seed Bed Preparation,10 ACRE
| 06/26/2025 06:00 PM UTC |
OSM 40(1381)103.1
Abandoned Mine Reclamation Project
Freeland South
Hazle Township, Luzerne County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 90 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Demolition of Structures
Grading -15,435 C.Y.
Sealing Boreholes– 3
Seeding – 3.3 Acres
| 07/03/2025 06:00 PM UTC |
OSM 11(0826)104.1
Abandoned Mine Reclamation Project
Spangler Athletic Field
Northern Cambria Borough, Cambria County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12”
Diameter), 300 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Inlet Filter Bag, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Pumped Water Filter Bag, 5 EACH
Clearing and Grubbing, 1 L.S.
Diversion and Care of Water, 1 L.S.
Road and Sidewalk Replacement – Roadway Restoration, 5 S.Y.
Road and Sidewalk Replacement – Temporary Paving, 11 S.Y.
Road and Sidewalk Replacement – Concrete Sidewalk Restoration, 5 S.Y.
Road and Sidewalk Replacement – Gravel Driveway/Sidewalk Restoration, 10 S.Y.
Traffic Control, 1 L.S.
Subsurface Drain – Twelve-Inch (12”) Polyvinyl Chloride (PVC) Pipe, 360 L.F.
Subsurface Drain – Cleanouts, 3 EACH
Subsurface Drain – Connection to Mine Drift, 1 L.S.
Subsurface Drain – Connection to Existing Storm Inlet, 1 L.S.
Subsurface Drain – Reconnection of Existing Mine Drain to New Drain, 1 L.S.
Subsurface Drain – Reconnection of Existing Homeowner Drain, 2 EACH
Seeding – Seeding, 1 L.S.
Seeding – Additional Topsoil, 10 TON
| 07/03/2025 06:00 PM UTC |
OOGM FS24-5
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells
East Keating Township, Clinton County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 825 to 4,200 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 26, 2025, at 10:00 a.m.
Department representatives will meet contractors at: 41.261528, -77.913032.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/17/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OOGM 20-2
Cleaning Out and Plugging One Abandoned Well in Ross Township, Allegheny County.
MANDATORY PRE-BID MEETING SCHEDULED FOR MARCH 25, 2021 AT 10:00 AM. MEET DEP REP AT 129 MAYER DRIVE IN PITTSBURGH, PA 15237.
Estimated Amount of Project: $200,000 to $299,999 (Small Business Only); Term: 120 calendar days; Bid Bond NOT Required.
Principal Items of Work: Clean out and plug one (1) abandoned well, estimated to be up to 3,000 feet in depth, to Department specifications; prepare and restore well site; mobilize and demobilize plugging equipment.
| 04/15/2021 06:00 PM UTC |
OSM 32(4806)102.1
Abandoned Mine Reclamation Project, Canoe Ridge South, Canoe Township, Indiana County. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term 360 calendar days. Bid Bond Required.
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (Eighteen-Inch [18"] Diameter), 2,000 L.F.; Grading, 48,000 C.Y.; Seeding, 9 Acres.
| 03/25/2021 06:00 PM UTC |
OSM 18(1123,6679)101.1
Abandoned Mine Reclamation Project, Huling Branch East
Noyes and Leidy Townships, Clinton County
Estimated Amount: Greater than $5,000,000
Term: 455 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Perforated Twelve-Inch (12") PE pipe, 3,265 L.F.
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Solid Twelve-Inch (12") PE pipe, 130 L.F.
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
AASHTO No. 1 Calcareous Coarse Aggregate, 13,112 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Calcareous Modified 2A Aggregate, 500 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Non-Calcareous AASHTO No. 1 Coarse Aggregate, 7,155 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Ethylene-Propylene-Diene Terpolmer (EPDM) Impervious Lining, 9,496 S.Y.
Revamped Treatment Pond
Coal Refuse Removal, 12,500 C.Y.
Revamped Treatment Pond
Ethylene-Propylene-Diene Terpolymer (EPDM) Impervious Lining, 5,393 S.Y.
Fence, 1,300 L.F.
Alkaline Addition (Limestone Screenings), 50,800 Ton
Grading, 450,481 C.Y.
Reconstruct Recreational Trails, 5,610 L.F.
Forestland Preparation for the Forest Reclamation Approach Backfill, 18.8 Acre
Tree Planting, 16,750 Tree
Seeding - Wildlife Habitat – Mulching, 22.9 Acre
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 7%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 02/18/2021 07:00 PM UTC |
OSM 17(0111)101.1
Abandoned Mine Reclamation Project
Madera North Side, Bigler Township, Clearfield County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Diversion and Care of Water, 1 L.S.
Trench Excavation, 600 C.Y.
Subsurface Drain – Pipe, 500 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 500 C.Y.
Repaving – Base Course, 77 TON
Repaving – Binder Course, 40 TON
Traffic Control, 1 L.S.
Office Facility, 1 L.S.
| 02/04/2021 07:00 PM UTC |
OSM 11(2464)103.1
Abandoned Mine Reclamation Project
Vintondale Refuse Pile Reclamation
Vintondale Borough, Cambria County
Estimated Amount: $1,000,000 to $5,000,000
Term: 910 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan and Highway Occupancy Permit, 1 L.S.
Coal Refuse Removal and Grading - Coal Refuse Removal, 215,000 C.Y.
Coal Refuse Removal and Grading - Coal Refuse Grading, 10 ACRE
Equipment Storage Area, 278 S.Y.
Seeding - Mulching, 10 ACRE
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 02/04/2021 07:00 PM UTC |
OSM 40(0493,3724,3725)101.1
Abandoned Mine Reclamation Project
Hollars Hill South AML - Cranberry Creek Gateway Project
Hazle Township, Luzerne County
Estimated Amount: Greater than $5,000,000
Term: 600 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Eight Inch (8") Ductile Iron Pipe Including Fittings - 1,015 L.F.
Connection to Existing Water Main - 1 L.S.
Drilling of Boreholes - 448 L.F.
Furnishing and Installing Casing Pipe - 285 L.F.
Fill Material Injection - Flowable Fill Material/Concrete Material - 200/200 C.Y.
Removal and Disposal of Structures - 7
Grading, Hauling and Compaction - 742,666 C.Y.
Disposal of Solid Waste - 10,000 Tons
Drainage Excavation - 2,645 C.Y.
Rock Lining - 4,099 S.Y.
Seeding - 66 ACRE
Addendum No. 1 was issued on December 1, 2020.
Addendum No. 2 was issued on December 9, 2020.
*Small Diverse Business and Veteran Business Enterprise Participation Goals: The Issuing Office and the Department of General Services’ Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) have not set Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals for this procurement. This procurement is either under the dollar threshold for setting SDB and VBE Participation goals, or the Issuing Office and BDISBO have determined that the SDB and/or VBE participation opportunities for the scope of work for this procurement are de minimis. There are no additional SDB, VBE or Small Business requirements for this procurement. However, SDB, VBE and Small Business utilization is encouraged when possible. Attachment A is not applicable under these circumstances.
| 12/17/2020 07:00 PM UTC |
OOGM 19-3
Cleaning Out and Plugging One (1) Abandoned Well
Mill Creek Township, Lycoming County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 120 calendar days
Bid Bond Not Required
Principal Items of Work and Approximate Quantities:
Prepare and restore well site.
Mobilize and demobilize plugging equipment.
Clean-out and plug one abandoned well, estimated to be up to 6,854 feet in depth, to Department specifications.
| 10/29/2020 06:00 PM UTC |
OSM 17(6806)101.1
Abandoned Mine Reclamation Project
Weber Run South
Cooper Township, Clearfield County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 210 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing, 1 L.S.
Grading, 80,100 C.Y.
Seeding, 9.5 Acre
| 09/17/2020 06:00 PM UTC |
OSM 24(3895)102.1
Abandoned Mine Reclamation Project
Winslow Hill III (East)
Benezette Township, Elk County
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing, 1 L.S.
Alkaline Addition, 4,608 Ton
Subsurface Drain with Cleanout, 250 L.F.
Grading, 524,000 C.Y.
Erosion Matting, 1,950 S.Y.
Rock Lining, 100 S.Y.
Culvert Pipe - Eighteen Inch (18") Smooth-Interior Corrugated N-12 Pipe, 50 L.F.
Culvert Pipe - Twelve Inch (12") Smooth-Interior Corrugated N-12 Pipe, 30 L.F.
Seeding, 45 Acre
Tree Planting, 260 Tree
Stone Aggregate, AASHTO No. 1 Stone, 328 Ton
Stone Aggregate, PA DOT No. 2A Stone, 192 Ton
| 09/10/2020 06:00 PM UTC |
OSM 17(7087)101.1
Abandoned Mine Reclamation Project
Morgan Run Recreational Facility – West Decatur PO
Boggs Township, Clearfield County
Estimated Amount: $300,000 to $500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Dewatering Impoundments, 1 L.S.
Clearing and Grubbing, 1 L.S.
Subsurface Drain with Cleanouts, 430 L.F.
Grading, 73,600 C.Y.
Parking Area Construction, 1 L.S.
Recreational Trail - Construction, 1 L.S.
Recreational Trail - Culvert Pipe, 40 L.F.
Amphitheater Construction, 1 L.S.
Erosion Matting, 1,485 S.Y.
Stone Aggregate - AASHTO No. 1, 1,800 Ton
Stone Aggregate - PA DOT No. 2A, 1,910 Ton
Rock Lining, 35 S.Y.
Seeding, 12.4 Acre
| 09/10/2020 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.